You are on page 1of 6

REGION_III

PROVINCE OF NUEVA_ECIJA
MUNICIPALITY OF LUPAO

Magnitude or
Hazard Frequency
Intensity

GEOPHYSICAL
Earthquake none 7.7
Earthquake-Induced Landslide
Sinkhole
Tsunami
Volcanic Activity
HYDRO-METEREOLOGICAL
Flood*

seasonal 2 ft - 5 ft 1"

Bank Erosion

seasonal mild

Storm Surge
Rain-Induced Landslide
Tropical Cyclone
(Typhoon, Storm, Depression)
seasonal 2 ft - 5 ft 1"

Intense Rainfall
(Extreme rainfall event)
seasonal mild

Extreme Temperature
Drought seasonal manageable
ENSO (El Niño/ La Niña)
BIOLOGICAL
Disease Epidemics
CoViD-19
Outbreaks
CoViD-19
Insect/Animal Plagues

a. African Swine fever


yearly
b. Avian flu

* For Flood, indicate on the Remarks


column, the causes - River over flow,
tide, storm surge; for bank overflow,
indicate the river name
IDENTIFIED HAZARDS

Severity of
Coverage/ Spatial
Consequence/ Degree Elements at Risk Date of Major Event/s
Extent
of Damage

damage Brgy Namulandayan July 16, 1990

1.October 21, 2020,


a. Brgy Alalay Grande, a. irrigation system
damage b. Balbalungao c. Brgy. b. bridges and dikes Oct. 14, 2021 and
Sept. 23, 2022
San Roque c.farms d.

damage Brgy. San Roque Alo-o bridge Sept. 23, 2022


bridge

a. Brgy Alalay Grande, a. irrigation system


damage b. Balbalungao c. Brgy. b. Sept. 23, 2022
San Roque c.

Brgy. San Roque Alo-o


damage farms Sept. 23, 2022
bridge

damage to crops

death, interruption of all elements March 16, 2020 to


the whole community present
death, interruption of March 16, 2020 to
all elements
the whole community present
a. 2019
b. 2022
Mitigation Conducted Remarks

The occurrence of event was due to an


Pre-emptive Evacuation heavy rainfall before typhoon Karding
hit Lupao which caused an overflow in
the river along Alo-o Bridge

Report of damage to the local


engineering office to contact proper
authority for repair of damaged river
bank riprap.

The occurrence of event was due to an


Pre-emptive Evacuation heavy rainfall before typhoon Karding
hit Lupao which caused an overflow in
the river along Alo-o Bridge

Report of damage to the local


engineering office to contact proper
Report of damage to the Engineering Office
authority for repair of damaged river
bank riprap.

lockdowns, check points in borderlines, mass


CoViD-19 vaccination by the DOH
lockdowns, check points in borderlines, mass
CoViD-19 vaccination by the DOH
a. Local DA checkpoints on animal
transporation in boarderlines and strict
implementation of 1-7-10 DA protocol
b.Checkpoints on animal transporation in
boarderlines