June 14,2008

To: Engr. R. PAPA

Project: Proposed Assembly Shed


Re : Bid Proposal

Sir:
We are pleased to submit to you our proposal with complete supply of materials,
labor , equipment and supervision for the completion of the above project
based on the given plans and specification .

ITEM DESCRIPTION QTY UNIT UNIT COST TOTAL COST


I GENERAL REQUIREMENTS
Mobilization and Demobilization 1 lot 50,000.00 P 50,000.00
Temporary Facilities 1 lot 10,000.00 10,000.00
Sub- Total P 60,000.00

II SITEWORKS
Excavation 44.78 cum 1,000.00 P 44,780.00
Backfill & Compaction 36.86 cum 350.00 12,901.00
Hauling and Disposal 7.92 cum 500.00 3,960.00
Gravel Bed & Compaction 3.26 cum 1,000.00 3,260.00
Sub- Total P 64,901.00

III REBARS
10mmǿ 700.76 kgs 98.00 P 68,674.48
12mmǿ 402.79 kgs 98.00 39,473.42
16mmǿ 1,182.40 kgs 98.00 115,875.20
Tie Wires Ga.16 1.00 rolls 3,000.00 3,000.00
Sub- Total P 227,023.10

IV CONCRETE WORKS, 3000 psi


Column footing and pedestal 15.50 cum 5,200.00 P 80,600.00

V FORMWORKS 112.04 sm 750.00 P 84,030.00

VI STEEL WORKS
Steel columns , 39 units 7,873.10 kgs 90.00 P 708,579.00
Steel Roof Framing 16,151.00 kgs 90.00 1,453,590.00
Sub- Total P 2,162,169.00

IX TINSMITRY 3.00 sets P -


Roofing Sheet Ga. 24 1,925.08 sm
Ridge / End Flashing Ga. 26 248.80 lm
Gutter Ga. 26 76.40

Sub- Total
**GRAND TOTAL COST ** P 2,678,723.10

items not included in the above cost:


1. Ceiling Finishes
2. Floor Finishes
3. Electrical Works
4. Painting Works
Page 1 of 2
ITEM DESCRIPTION QTY UNIT UNIT COST TOTAL COST

TERMS OF PAYMENT:
30% Down payment
70% Progress Billing

Hope our offer is acceptable. Thank you.

Respectfully yours,

JOHN WICK