Professional Documents
Culture Documents
Appendix C Data Collection
Appendix C Data Collection
Honeycomb on the concrete beam and beam Surface repair on the beam and
5 supporting the fill has cracked replace the cracked beam
27 Honeycomb and cracks on the concrete beam Surface repair on the beam
Cell B Finding Recommended Action Status
Concrete spalling and rebar exposure on two
beams and beam supporting the fill has Concrete repair on two beams
1 cracked beams
Honeycomb and cracks on the concrete
2 beam Surface repair on the beam
Honeycomb and cracks on the concrete
3 beam Surface repair on the beam