Professional Documents
Culture Documents
SS22 - SLP Evidences and Declaration - Indicator 1.4A
SS22 - SLP Evidences and Declaration - Indicator 1.4A
4
Data/Declaration required for Q3:
Yes No
Whether 100% Storm water drains/Nallah (Secondary/
Tertiary) have screens/filters at a suitable distance? SWDs – Not Available in the ULB
Nallahs – Not Available in the ULB
I hereby declare that the data/information provided above table, on Swachhatam portal and in the attached
documents is true to the best of my knowledge and reflects the status of the progress on ground in the ULB.
Prepared by
Prepared by