You are on page 1of 1

Declaration Template: Indicator 3.

2
Data required for Q3:

Amount (avg.) of faecal sludge generated/collected in the


ULB/day: _______________ MLD
Note: Please mention in amount in MLD only.

Total amount (avg.) of sewage generated/collected in the


ULB/day: _______________ MLD
Note: Please mention in amount in MLD only.

Does the city follow a clustered approach for FSTP/STP? Yes  No 


Total Number of FSTPs available in/used by the ULB:
________
Note: Should match the count on the Swachhatam portal

Total Capacity of the functional FSTPs in/used by the ULB: _______________ MLD/day

Total Number of STPs available in/used by the ULB:


________
Note: Should match the count on the Swachhatam portal

Total Capacity of the functional STPs in/used by the ULB: _______________ MLD/day
Whether Geo coordinates (GIS details) in terms of ULB
boundaries, ward number, ward boundaries, landmark etc
of all Wastewater treatment Plants (FSTPs/STPs) are Yes  No 
mapped and updated on SBM portal as per the prescribed
details (given by MoHUA)?

Documents to be submitted by the ULB for evaluation:

List of all the FSTPs with their capacities in MLD. Attached  Not Available. 
List of all the STPs with their capacities in MLD. Attached  Not Available 
Document showing the how the calculation for total
amount of faecal sludge and sewage generated. Attached  Not Available 

I hereby declare that the data/information provided above table, on Swachhatam portal and in the attached
documents is true to the best of my knowledge and reflects the status of the progress on ground in the ULB.

Signature & Stamp of the Nodal Officer/Head of the ULB


Name: ULB Code:
Designation: ULB Name:
Date:

Prepared by

You might also like