Professional Documents
Culture Documents
SS22 - SLP Evidences and Declaration - Indicator 3.2
SS22 - SLP Evidences and Declaration - Indicator 3.2
2
Data required for Q3:
Total Capacity of the functional FSTPs in/used by the ULB: _______________ MLD/day
Total Capacity of the functional STPs in/used by the ULB: _______________ MLD/day
Whether Geo coordinates (GIS details) in terms of ULB
boundaries, ward number, ward boundaries, landmark etc
of all Wastewater treatment Plants (FSTPs/STPs) are Yes No
mapped and updated on SBM portal as per the prescribed
details (given by MoHUA)?
List of all the FSTPs with their capacities in MLD. Attached Not Available.
List of all the STPs with their capacities in MLD. Attached Not Available
Document showing the how the calculation for total
amount of faecal sludge and sewage generated. Attached Not Available
I hereby declare that the data/information provided above table, on Swachhatam portal and in the attached
documents is true to the best of my knowledge and reflects the status of the progress on ground in the ULB.
Prepared by