Date DAMRING AND

30/8/2020 hàn xong bàn nghiền

Damring 120 mm Date


30/8/20 Thay roller ceramic 30-Aug-20
grinding force 175 to 205 Bar Mill speed rpm 26.2 23-Apr-22
29-Apr-22
9/18/2021 Hàn bàn nghiền
1-May-22
4/23/2022 Nâng damring từ 110 lên 160mm 4-May-22
4/29/2022 Thắt gió toàn bộ 70 mm (bao gồm sau con lăn) 11-Aug-22
5/1/2020 Nâng damring từ 160 lên 200mm 11-May-23
5/4/2020 Nâng damring từ 200 lên 250mm
11/8/2022 Cắt damring 50mm còn 200mm
DAMRING AND NOZZLE RING BLINDING

Dam ring height (mm) Nozzring cover (mm) Comment Date


120 Ceramic roller
160 30-Aug-20
70- width
4-Oct-22
200 27-Feb-23
250
200
160 Feed increased 3tph
WEAR RATE % (<10%)

ROLLER TABLE Comment


% g/t mm(<40) % g/t mm(<40)
Ceramic roller
10.6 0.23 10.6 7.59 0.45 13.33
0.22 10.6 0.41 2.71 Topup welding table on Mar-23
MILL AUDIT PLANNING (11 DAYS)

11- 12- 15- 16- 17- 18- 19- 22- 23- 24- 25-
DATE May May May May May May May May May May May
Data input
Meeting for assigment
Check for measuring hole,
sampling point, etc…
Do mill audit
Heat balance input
Makiing report
Presentation
PCB40 Before PCB40
Clinker in Clinker out % fly ash capacity kWh/t Clinker in
22 19.85 4.9 152 29.6 68
11 150.4
41 41
4380 48

152t/h

Before After

4380cm2/
4178cm2/g g
out CL
out cl 11%
19.85%
After
Clinker out fly ash capacity kWh/t
32 4.9 170.3 30.32

t/h
150.4t/h

After

4380cm2/
g
out CL
11%