50-60tpd Rice Mill Plant 20220803
50-60tpd Rice Mill Plant 20220803
TQLZ100 振动清理筛
03 1 9-12 0.37×2
TQLZ100 Vibrating Cleaner
4-72No.4A 风机
04 1 5.5
4-72No.4A Blower
风网管道辅件
05 Accessories (Including 1
Collecting Dust System and its
pipe)
TDTG150*5200 提升机
06 150 single pulley Elevator 1 4-6 1.5
(Height: 5.2m)
TQSX100 吸式比重去石机
07 1 4.0-6.0 1.1
TQSX100 De-stoner
4-72No.4A 风机
08 1 5.5
4-72No.4A Blower
风网管道辅件
09 Accessories (Including 1
Collecting Dust System and its
pipe)
B: 砻谷和谷糙分离 Husking and Separating
TDTG150*5200 提升机
10 150 single pulley Elevator 1 1.5
(Height: 5.2m)
MLGT36 砻谷机
11 1 4-4.8 7.5
MLGT36 Husker
4.5#风机
12 1 1.5
4.5# blower
风网管道辅件
13 Accessories (Including 1
Collecting Dust System and its
pipe)
TDTG150*5200 提升机
14 150 single pulley Elevator 1 1.5
(Height: 5.2m)
MGCZ100×12 重力筛
15 MGCZ100×12 Paddy 1 3.0-4.0 1.5
Separator
MNSW18 砂辊米机
17 3 3.0 30 + 22*2
MNSW18 Rice Whitener
风网管道辅件
21 Accessories (Including 1
Collecting Dust System and its
pipe)
TDTG1310*5200 low speed
22 elevator with double pulley 1 1.1
(Height: 5.2m)
MJP100×4 白米分级筛
23 1 2.5-3.0 1.1
MJP100×4 Rice Grader
成套碾米设备配电柜
24 1
Control Panel for 50-60tpd
至各电机导线至各电机导线
25
Cable Conductor
安装材料
26 Installation Materials and
accessories
包装内运费
27 Package and In-land
Transportation Charges
MPGW20 抛光机
29 1 2.5-3 37
MPGW20 RICE polisher
风网管道辅件
32 Accessories (Including
Collecting Dust System and its
pipe)
Further details:
1. Packing size: 1x40GP+1x20GP or 2*40GP.
2. Delivery Time: Within 35-45 days after deposit confirmed.
2. Payment term: T/T, 30% deposit, the balance before delivery.
3. Warranty: 1 year (Exclude the consumable parts)
4. After-sales: We provide 24*7 days on line service.
5. Voltage: 380V 50HZ 3PHASE, if voltage change, there will be cost for motor
customizing.
6. Packed by wooden box, if fumigation needed, the customer bear the cost.
The above price is not included equipment installation and commissioning fee. If need
to install, we can send 1 installation engineers to guide installation. The customer need
bear engineers visa fee and engineers round-trip air tickets, local accommodation
transportation costs and personnel security work, and pay the installation engineer's
subsidies $100 per person per day (from in and out of the border start-stop time) it will
take about 25-30 days to install a full set of equipment .