Conditioner loading and Dry Ash loading

Dated 01-05-2023 Level wet Dry Brick


Shift-C in mtr. loading Balker Top up plant
Ash plant #3 2000 ton 13.90 0 11
Ash plant #3 1000 ton 10.30 0
Ash plant #3 340 ton 8.00 0
Ash plant #5 silo -1 14.45 5
Ash plant #5 silo-2 14.80 6
Dfat silo New 1000 ton. 0.01 0 0
Dfat silo Old 600 ton 6.10 2 14
Total 0 24 14 0