= NOTES: CAST-IN-SITU PILE: i roe 1. 28 days cylinder crushing strength of concrete fc= 3000 psi Minimum mix ratio 1:1%:3 with crushed stone chips as coarse aggregate & 100% coarse sand as fine aggregate. 2. Yield strength of M.S deformed reinforcing bar fy = 72,000psi Rec = [Paenec mae [oer \0-mm dia @ 4" c/e a if sie" 3. Full length of pile to be cast. Hl i 4. Clear Cover to main reinforcement bar is to be 7mm. unless st | ave otherwise mentioned. 716nmce 6. When concreting top layer one batch of concrete must be over flowed. ip qj 7. The spiral reinforcement should preferably be tack welded to i li i - tmmeawem the main Reinforceing bars at every alternate points. a iwmmaaescie 8 The lapping portion of main reinforcement shall be welded if i three points each 30mm long. 8 9. Toe of the tremie shall be set at a maximum of 6" above the bottom of the bore hole 10. Maximum permissible siltation in bore hole prior to start of concrete operation shall be 3" Steen adjacent pile with croncrete less than 48 hours old 12. A slump of 5" to 6" shall be maintaind for concreting by tremie 13. The uilimate load carrying capacity of a single pile should be determind from load testing. SSexmaaneura ocnouseen a ne som edak Setesonen naotnrennuenuionack

You might also like