Ref. 7405-09-SD-E2.

a-SRST-097-01
Contractor Al Habtoor Leighton Group Page 1 of 3
Project Jewel Of The Creek Development Prepared By AABCO
Zone Basement 3-Area E2 Checked By
DrawingReference 7405-09-SD-E2.a-SRST-097-01 Rev. 0 Internal Rev. 0
Date Prepared 15-08-12 Date Revised

Bar Bending Schedule Conform To B.S 8666


No. No. of Length A B C D E/R Total

Shape
Type

Bar Of Bars Total Of Each

Code
Size

Member F G H I J Shape Wght


Mark Mbrs in Nos Bar
(Kg.)
. each mm mm mm mm mm mm

Base3 to Base2-AreaE2.a-SC2.1

TOP 1 T 8 1 10 10 3100 0 3100 12.2


0

TOP 2 T 10 1 10 10 2765 15 1030 525 1735 17.1


0

BOTT. 3 T 10 1 10 10 4380 15 3810 1950 570 27


0

BOTT. 4 T 12 1 10 10 2395 15 500 255 1895 21.3


0

BOTT. 5 T 8 1 36 36 3445 41 960 135 1320 135 960 48.96


0

ADD 6 T 16 1 20 20 3000 0 3000 94.6


0

ADD 6a T 12 1 12 12 1400 0 1400 14.88


0

TOP&BOTT 7 T 10 1 22 22 3000 0 3000 40.7


0

U-BAR 7A T 8 1 20 20 1270 21 600 130 570 10


0

U-BAR 7B T 8 1 21 21 1990 21 960 130 930 16.59


0

U-BAR 8 T 10 1 1 1 3180 21 1545 130 1545 1.96


0

TOP 9 T 10 1 10 10 2390 15 435 225 1955 14.7


0

TOP 10 T 10 1 10 10 1790 15 1440 740 350 11


0

TOP 11 T 8 1 10 10 2385 0 2385 9.4


0

TOP 12 T 10 1 10 10 2935 15 870 445 2065 18.1


0

BOTT. 13 T 12 1 10 10 2295 15 570 295 1725 20.4


0

BOTT. 14 T 12 1 10 10 4070 15 3500 1790 570 36.1


0

BOTT. 15 T 12 1 10 10 2740 15 500 255 2240 24.3


0

TOP&BOTT 16 T 10 1 22 22 3000 0 3000 40.7


0

U-BAR 17 T 10 1 1 1 3300 21 1605 130 1605 2.04


0

TOP 18 T 10 1 10 10 2465 15 350 180 2115 15.2


0

TOP 19 T 10 1 10 10 1245 15 895 460 350 7.7


0

BOTT. 20 T 12 1 10 10 2805 15 860 445 1945 24.9


0
Page Weight \Total Weight 529.83 \ 533.19
Ref. 7405-09-SD-E2.a-SRST-097-01
Contractor Al Habtoor Leighton Group Page 2 of 3
Project Jewel Of The Creek Development Prepared By AABCO
Zone Basement 3-Area E2-. Checked By
DrawingReference 7405-09-SD-E2.a-SRST-097-01 Rev. 0 Internal Rev. 0
Date Prepared 15-08-12 Date Revised

Bar Bending Schedule Conform To B.S 8666

No. No. of Length A B C D E/R Total

Shape
Type

Bar Of Bars Total Of Each

Code
Size

Member Bar F G H I J Shape Wght


Mark Mbrs in Nos
(Kg.)
. each mm mm mm mm mm mm

U-BAR 21 T 10 1 2 2 2730 21 1320 130 1320 3.36


0

Page Weight \Total Weight 3.36 \ 533.19


Ref. 7405-09-SD-E2.a-SRST-097-01
Contractor Al Habtoor Leighton Group Page 3 of 3
Project Jewel Of The Creek Development Prepared By AABCO

Zone Basement 3-Area E2 Checked By


DrawingReference 7405-09-SD-E2.a-SRST-097-01 Rev. 0 IR. 0
Date Prepared 15-08-12 Date Revised

Bar Bending Schedule Conform To B.S 8666

Wt 8 10 12 16
Diameter
97.15 199.56 141.88 94.6
Wise(kg)

Grand Total (kg) 533.19