1. Interpretation of Drawing
Interpretation of Drawings
Labor is very lazy until they are told they work. And if the labor is
not told properly, then it can also cause huge losses, so
the civil engineer needs to stand by and monitor the work.
Supervision of Work
It is very important to monitor the work that is going on at
the construction site, it is very important for any
civil engineer to check whether the work is going on at the
site, according to
the drawings, which have been done according to what was said.
Material Schedule
How much material is available on the site, how much material has
come, the details of it should be with the civil engineer.
we can find out how much work has been done and how
much work is yet to be done and we also know
whether the work has been done or not.
Concrete used in m3
Formwork Quantity
Labor used
Material used
12. Much Other Work