Professional Documents
Culture Documents
REFRIGERANT PIPES
SUCTION & LIQUID LINES
TO BELOW (MECH/ AHU ROOM) REFRIGERANT PIPES FROM/TO
(IDU-05) UPS ROOM
AREA AT FIRST FLOOR
A +6.875
FFL.
ACCU-02A ACCU-02B
TOC. +6.875
AHU-02 AHU-01
DN
B
ACCU-01A ACCU-01B
OPENING IN
PARAPET WALL FOR
REFRIGERANT PIPES
C
TOC. +9.500
TOC. +9.500
D
SLOPE 1.5%
SLOPE 1.5%
SLOPE 1.5%
E
RIDGE LINE RIDGE LINE
SLOPE 1.5%
SLOPE 1.5%
SLOPE 1.5%
F
TOC. +9.500
H
REFRIGERANT PIPES FROM/TO
(IDU-03) ENGINEERING ROOM
AT FIRST FLOOR
0 5 10 M
LITO MAY2016