GENERAL NOTES : -

REFRIGERANT PIPES
SUCTION & LIQUID LINES
TO BELOW (MECH/ AHU ROOM) REFRIGERANT PIPES FROM/TO
(IDU-05) UPS ROOM
AREA AT FIRST FLOOR

A +6.875
FFL.

ACCU-02A ACCU-02B
TOC. +6.875
AHU-02 AHU-01

DN
B
ACCU-01A ACCU-01B
OPENING IN
PARAPET WALL FOR
REFRIGERANT PIPES
C
TOC. +9.500

TOC. +9.500

D
SLOPE 1.5%

SLOPE 1.5%

SLOPE 1.5%
E
RIDGE LINE RIDGE LINE
SLOPE 1.5%

SLOPE 1.5%

SLOPE 1.5%
F

TOC. +9.500

H
REFRIGERANT PIPES FROM/TO
(IDU-03) ENGINEERING ROOM
AT FIRST FLOOR

ACCU-04 REFRIGERANT PIPES FROM/TO


(IDU-04) LAN DP ROOM
AT FIRST FLOOR
ACCU-03
I

0 5 10 M

GRAPHIC SCALE 1:100


HVAC LAYOUT - ROOF PLAN

SUBSTATION FOR WKO FACILITIES


WATER MANAGEMENT AT
AT GCs 3, 4, 7 AND 21 IN SK AREA
HVAC LAYOUT - ROOF PLAN

LITO MAY2016

EF/1971 1:100 10-5-527