You are on page 1of 2
How to get the complete protection relay tripping report and_distur- bance record waveform file in a few minutes during flood, typhoon and such disaster weather? ‘The SCADA cannot achieve them. Protection and Fault Management System (PFIS) can do it ‘The PFIS collects all fault detail information automatically and systematically, creates fault report and provides operating advice of restoration operation. Mean ‘The PFIS manages the setti configuration and operation of the Protection devices and disturbance recorders. In Southeast Asia, Protection and Fault Information Management System is widely applied in the voltage level of 230kV and above, SIFANG's PFIS comprises two parts: > Master station in dispatching center * On-line fault analysis associating power system fault and running status monitoring of IED * Generate the fault report and IED tripping report automatically + Analyze disturbance recording files, A dp SIFANG Excellence for Automation Protection and Fault Information Management System » Slave station in substation + Collect information of events (alarm, signal, trip, communication status), protection settings, disturbance record and historic data, etc. * Manage the disturbance data and extract the brief disturbance information from the disturbance file TH ighlights » Improve the power fault operation efficiency greatly, especially in disaster weather + Ina few minutes, all disturbance data of the whole power network can be collected to control center * Ina few minutes, the fault report and protection relay action report can be generated for operator to make decision of system recovery in short time * Shorten power grid restoration time » High performance * Without hard disk and cooling fan, rugged slave station design for harsh environments with embedded hardware platform lowers power ‘consumption + Support standard protocols (IEC 61850, IEC 60870-5-103, Modbus, DNP, etc.) and private protocols (SPA of ABB, COURIER af Alstom, GE- MODEM of GE, etc.) * Support muttiple architectures in master station which are adaptable with multiple OSs, such as UNIX, Linux, Windows, ete. » Reduce routine workload of operators and protection relay engineers * Monitor the status of protection relays and disturbance recorders in real-time + Remote manage the reports, disturbance recording files, setting, setting group and configuration of protection relays and disturbance recorders efficiently. (Depend on users policy) + Provide “One-click” substation configuration tool with which slave station can integrate graphics and model according to SVG graphic standard and IEC 61970 CIM standard Prey Projects SIFANG, with decades of experiences and 50% market share in China, has provided more than 100 master systems and 3000 slave systems successfully worldwide. » Protection and Fault Information Management System in Dispatching Center of State Grid of China, 2010 » Protection and Fault Information Management System in National Grid Corporation of Philippines (NGCP), 2011 hangs th Stra Haan tt, Baling, PLE NDEE

You might also like