0% found this document useful (0 votes)
1K views1 page

PS3 Plumbing Producer Statement Form

The document is a producer statement for plumbing work that requires certification. It details: 1) The certifying plumber confirms the plumbing work complies with the building consent plans and clause G12 of the building code. 2) The plumber certifies they personally tested the water supply system by one of the listed test methods and confirms whether a test report is attached. 3) The plumber understands the statement will be relied on by the council to establish compliance with the building consent.

Uploaded by

Prateek Chandra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views1 page

PS3 Plumbing Producer Statement Form

The document is a producer statement for plumbing work that requires certification. It details: 1) The certifying plumber confirms the plumbing work complies with the building consent plans and clause G12 of the building code. 2) The plumber certifies they personally tested the water supply system by one of the listed test methods and confirms whether a test report is attached. 3) The plumber understands the statement will be relied on by the council to establish compliance with the building consent.

Uploaded by

Prateek Chandra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Producer statement construction (PS3)

Plumbing
All sections of this form must be completed
TO BE COMPLETED BY THE CERTIFYING PLUMBER WHO COMPLETED THE WORK

Building
Author name:
consent No:

Author
company:
Description of
plumbing work:
Legal
description:

Site address:

I have sighted the above building consent and read the attached advice notes. I confirm that the plumbing pipe work and
fittings have been selected and constructed to comply with the consented plans to the extent required by the above building
consent, and with clause G12 of the Building Regulations
I hereby certify that I have personally tested the water supply system by the method indicated below:

NZBC G12 Water Supplies: AS1 clause 7.5, Watertightness

AS/NZS 3500 1:2015 Water services, clause 18.3.1

AS/NZS 3500 4:2015 Heated water service, clause 9.3

AS/NZS 3500 5:2012 Housing installations, clause [Link]

AS/NZS 2032: 2006 Installation of PVC pipe systems, (G12/AS1 clause 7.2)

Subject the system to test procedures in accordance with the manufactures requirements and supply test report

Test report attached Yes No

I understand that this producer statement, if accepted, will be relied on by Council for the purposes of establishing compliance
with the above building consent.

Signature: Date:

Certifying plumber registration No:

Plumber contact details:

Address:
Postcode:

Business: Fax:

Mobile: Email:

COUNCIL USE ONLY

Register
Received by: YES NO
checked:
Registration
Signature: YES NO
current:

Producer statement accepted as establishing compliance with the consented plans: YES NO

Auckland Council Building Consents| Private Bag 92300, Auckland 1142 | [Link] | Ph 09 301 0101
Page 1 of 1 June 2018 AC2311 (v.4)

You might also like