Unit 98.3m2 Unit 98.3m2 Unit 98.3m2 Unit 98.3m2 Unit 98.3m2 Unit 98.3m2
A B D E F G H I J K L M
C
DP10 DP9
3
NOTES:
W/M
W/M
W/M
W/M
W/M
W/M
DN40
DN40
DN40
DN40
DN40
DN40
SHW SHW SHW SHW SHW SHW
cleaning eyes / inspection junction to soil
FWG DN65 DN65 DN65 DN65 FWG FWG DN65 DN65 DN65 DN65 FWG FWG DN65 DN65 DN65 DN65 FWG pipes to comply with AS/NZS 3500.2.
JOINING UP
WITH STACK
WALL PLUMBING & DRAINAGE TO AS/NZS
3500:
2/06/2023 9:59:28 am
TEL (027) 484 8652, EMAIL : raewyn@bimassetlab.com
PLAN - FIRST FLOOR SCALE (@ A1) PROJECT NUMBER
1 : 50 @ A1 Stage 2A
This drawing remains the intellectual property of Aedile Advisors
Limited and shall not be copied or distributed to any third party 125C Murphys Rise PROJECT NORTH
without prior written approval of Aedile Advisors Limited. STATUS PURPOSE OF ISSUE DRAWING NUMBER REV
Confirm all dimensions onsite prior to commencement of work. Flat Bush A Building consent/Construction 2022-12-14 BUILDING CONSENT/
Do not scale off drawings. All work shall conform to all relevant
clauses of the New Zealand Building Code (NZBC) and NZ/AS Auckland 2016 Rev Description Date CONSTRUCTION P102 A
standards.
TRUE NORTH