You are on page 1of 2

PROJECT:ConstructionofRoadOverBridges(ROBs) at 3Locations(i.e.Wardha-WaroraSectionat LCNo.19-km804/12-14andNagpur- Wardha SectionatLCNo.

108-km
800/36-38&LCNo. 116-km817/22-24)inLieuof LCGatesinMaharashtraareaonNagpurDivisionofCentralRailway.

CLIENT:MAHARASHTRARAILINFRASTRUCTUREDEVELOPMENTCORPORATIONLIMITED.
CONTRACTOR:ANSARIERECTORS

MPR&ITP(QC) N O V E M B E R -2022(11.10.2022to10.11.2022) (LC-108 & 116)


Cum. No.ofTestUptoLastMonth No.ofTestForThisMonth Cum. No.ofTestUptoThisMonth
*Tot
*No. No.ofT *No. No.of No.
No.ofT No.of AE No.of No.of AE alNo. No.ofT No.of AE
Tests FrequencyofTest ofTest est ofTest TestC ofTe
Quantity estpas TestF Wit Quantity Testp TestF Wit Quantity ofTes estpas TestF Wit
Requir Conduc Requir o st
s ail nes ass ail nes t s ail nes
ed ted ed nduct Conduct
s s Require s
ed ed
d
1.OGL
1 Grainsizeanalysis 1Test /250 RMTR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2 Atterberg'sLimit 1Test /250 RMTR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3 ProctorTest 1Test /250 RMTR 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 KM 0.000 KM 0.000 KM
4 FreeswellIndexTest 1Test /250 RMTR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5 CBRTest 1Test /250 RMTR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6 FieldCompaction 1Set/3000M²(1Set=10Pit) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.BorrowArea
1 Grainsizeanalysis 2Test /3000M3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2 Atterberg'sLimit 2Test /3000M3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3 3 3
3 ProctorTest 2Test /3000M3 M 0 0 0 0 0 M 0 0 0 0 0 M 0 0 0 0 0
4 FreeswellingTest 2Test /3000M3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5 CBRTest 1Test /3000M3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3.EMBACKMENT
1 FieldCompaction 1Set/3000M2(EMB)(1Set=10Pit) M2 0 0 0 0 0 M2 0 0 0 0 0 M
2
0 0 0 0 0
4.SUBGRADE(SOILFROMBORROWAREA)
1 FieldCompaction 1Set/2000M2(SG)(1Set=10Pit) M2 0 0 0 0 0 M2 0 0 0 0 0 M
2
0 0 0 0 0
5.GranularSubBase
1 Gradation 1testper400M3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2 Atterberg'sLimit 1testper400M3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3 ProctorTest 1testforeachsource 3 0 0 0 0 0 3 0 0 0 0 0 3 0 0 0 0 0
M M M
4 WaterAbsorption 1testforeachsource 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5 AggregateImpactValue 1testforeachsource 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6 CBR 1testforeachsource 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7 FieldCompaction 2 2 2
1Set/1000M2 M 0 0 0 0 0 M 0 0 0 0 0 M 0 0 0 0 0
6.COARSEAGGREGATES(20&10MM)
1 Gradation Daily 652 652 652 0 652 48 48 48 0 48 700 700 700 0 700
2 Waterabsorption Weekly& asdirectedby engineer 112 112 112 0 112 8 8 8 0 8 120 120 120 0 120
3 Moisture content 3times/Day 652 652 652 0 652 48 48 48 0 48 700 700 700 0 700
4 Specificgravity Weekly 112 112 112 0 112 8 8 8 0 8 120 120 120 0 120
5 Impactvalue Weekly 112 112 112 0 112 8 8 8 0 8 120 120 120 0 120
6 E.I &F.I Weekly& asdirectedby engineer 112 112 112 0 112 8 8 8 0 8 120 120 120 0 120
7.FINEAGGREGATES(Natural& CrusherSand)
1 Gradation Daily 652 652 652 0 652 48 48 48 0 48 700 700 700 0 700
2 FinenessModulus Daily 652 652 652 0 652 48 48 48 0 48 700 700 700 0 700
3 Waterabsorption Weekly& asdirectedby engineer 112 112 112 0 112 8 8 8 0 8 120 120 120 0 120
4 Moisture content 3times/Day 618 618 618 0 618 34 34 34 0 34 652 652 652 0 652
5 Specificgravity Weekly 112 112 112 0 112 8 8 8 0 8 120 120 120 0 120
6 Siltcontent/Materialpassing75mic Weekly 112 112 112 0 112 8 8 8 0 8 120 120 120 0 120
Cum. No.ofTestUptoLastMonth No.ofTestForThisMonth Cum. No.ofTestUptoThisMonth
*Total
*No. No.ofT *No. No.of No.
No.ofT No.of AE No.of No.of AE No. No.ofT No.of AE
Sl.No. Tests FrequencyofTest ofTest est ofTest TestC ofTe
Quantity estpas TestF Wit Quantity Testp TestF Wit Quantity ofTes estpas TestF Wit
Requir Conduc Requir o st
s ail nes ass ail nes t s ail nes
ed ted ed nduct Conduct
s s Require s
ed ed
d
8.Concrete Works
1 CompressiveStrength 6Cube/DayofeachgradeMin.
2 M15(7Days) 41 41 41 0 41 6 6 6 0 6 47 47 47 0 47
3 M15(28Days) 61 61 61 0 61 6 6 6 0 6 67 67 67 0 67
4 M35(7Days) 383 383 383 0 383 8 8 8 0 8 391 391 391 0 391
5 M-35(28Days) Asper tableno1700- Set 820 820 820 0 820 30 30 30 0 30 850 850 850 0 850
6 M-40DECKSLABETC.(7Days) 8ofMORTH&IScode456 133 133 133 0 133 20 20 20 0 20 153 153 153 0 153
6 M-40DECKSLABETC.(28Days) 316 316 316 0 316 37 37 37 0 37 353 353 353 0 353
7 M-40GIRDER(7DAYS) 102 102 102 0 102 0 0 0 0 0 102 102 102 0 102
8 M-40 GIRDER (28 DAYS) 240 240 240 0 240 0 0 0 0 0 240 240 240 0 240
9 M-45 PSC SLAB (7DAYS) 0 0 0 0 0 16 16 16 0 16 16 16 16 0 16
17 M-45 PSC SLAB(28 DAYS) 0 0 0 0 0 8 8 8 0 8 8 8 8 0 8
9.Cement
1 Consistency 1testperlot 149 149 149 0 149 18 18 18 0 18 167 167 167 0 167
2 Initial&FinalSettingTime 1testperlot 149 149 149 0 149 18 18 18 0 18 167 167 167 0 167
3 Fineness 1testperlot Bags 149 149 149 0 149 Bags 18 18 18 0 18 Bags 167 167 167 0 167
4 C.S(3Days) Oneset oftestforeachlot &MT. 150 150 150 0 150 &MT. 17 17 17 0 17 &MT. 167 167 167 0 167
5 C.S(7Days) Oneset oftestforeachlot 150 150 150 0 150 17 17 17 0 17 167 167 167 0 167
6 C.S(28Days) Oneset oftestforeachlot 170 170 170 0 170 15 15 15 0 15 185 185 185 0 185
*Required frequency calculatedon dailybasis

Detail AE. MRIDC

Name

Sign.

You might also like