Professional Documents
Culture Documents
Estimating Residential Building
Estimating Residential Building
Brick Aggr cum 600 7.645 4587 3.78 2268 1.596 957.6
Tiber Frame and Shutter cum 32000 1.655 52960 1.655 52960 1.61 51520
Timber Shuttering cum 32000 0.315 10080 0.315 10080 0.645 0.0525 22320
Ballies m 15 37.8 567 37.8 567 65.09 2.76 1017.75
Lime quintal 220 10.525 2315.5 5.305 1167.1 4.645 1021.9
surkhi cum 33 3.53 116.49 1.77 58.41 0.75 24.75
Bitumen kg 20 128.7 2574 64.85 1297 26.915 538.3
Glass sqm 120 4.07 488.4 4.07 488.4 4.14 496.8
Primer lt 15 5.1 76.5 5.1 76.5 5.135 77.025
Paint lt 20 8.37 167.4 8.37 167.4 8.305 166.1
Stone rubble cum 600 2.4 1440
Labour
Mason Days 250 128.125 32031.25 126.125 31531.25 123.25 1.725 31243.75
Carpenter Days 300 79.8 23940 80.55 24165 120.75 3.75 37350
Painter Days 200 66.75 13350 6.675 1335 6.75 1350
Blacksmith Days 250 9.175 2293.75 16.55 4137.5 58.275 14568.75
Mazdoor Days 150 389.675 58451.25 401.25 60187.5 402.55 25.725 64241.25
378460.29 357207.56 470701
Tiber Frame and Shutter cum 32000 1.75 56000 1.75 56000
Timber Shuttering cum 32000 0.336 10752 0.336 10752
Ballies m 15 40.32 604.8 40.32 604.8
Lime quintal 220 11.25 2475 5.67 1247.4
surkhi cum 33 3.79 125.07 1.9 62.7
Bitumen kg 20 137.88 2757.6 69.44 1388.8
Glass sqm 120 4.39 526.8 4.39 526.8
Primer lt 15 5.44 81.6 5.44 81.6
Paint lt 15 8.91 133.65 8.91 133.65
Stone rubble cum 600
Labour