This document provides a detailed construction estimate for concrete and rebar materials for building footings and columns. It estimates the quantities of cement, sand, gravel, rebar, and tie wire needed for 12 footings based on their dimensions. It then estimates materials for 4 smaller footings. For the columns, it calculates the number of lateral ties needed based on column height and spacing, estimates the length and number of rebar pieces needed, and calculates the tie wire required. It also provides estimates for the vertical rebar in each column.

Uploaded by

Ramil S. Artates
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
80% found this document useful (10 votes)
26K views8 pages

Formula Estimate

This document provides a detailed construction estimate for concrete and rebar materials for building footings and columns. It estimates the quantities of cement, sand, gravel, rebar, and tie wire needed for 12 footings based on their dimensions. It then estimates materials for 4 smaller footings. For the columns, it calculates the number of lateral ties needed based on column height and spacing, estimates the length and number of rebar pieces needed, and calculates the tie wire required. It also provides estimates for the vertical rebar in each column.

Uploaded by

Ramil S. Artates
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
  • Footing 1 Details: Covers detailed calculations and material specifications for Footing 1, including concrete mixes and reinforcement bars.
  • Footing 2 Details: Provides similar calculations and materials for Footing 2; outlines concrete and reinforcement bar needs.
  • Column 1 Ties: Details height measurements, tie columns, and wire calculations necessary for erecting Column 1.
  • Column Post Details: Provides total length and vertical bar requirements for a column post.

DETAILED OF THE CONSTRUCTION ESTIMATE

CONCRETE MATERIALS :

FOOTING 1

CLASS "A" MIXTURE


FOOTING DEMINSION
LENGTH:

1.2 m

WIDTH:

1m

THICK:

0.35 m

VOL. OF FOOTING

0.42

cu.m.

TOTAL VOLUME OF THE


VOLUME=
CEMENT:

12

FOOTING

5.04 cu.m.

5.04

45.36 bags

SAND:

5.04

0.5

2.52 cu.m.

GRAVEL:

5.04

5.04 cu.m.

REINFORCE BARS MATERIALS :

FOOTING 1

NET LENGTH :
1.2

0.075 +

0.075

1.05 m

TOTAL NO. OF CUT BARS IN ONE FOOTING BY DIRECT COUNTING


6x

12

pcs

TOTAL NO. OF BARS FOR THE 12


12

12

144

FOOTING

pcs

1.05

SELECT THE STEEL BARS WHOSE LENGTH IS ECONOMICALLY CUT INTO


6

1.05

5.71429 pcs

Divide the result:


144

29

pcs of 16mm diameter bars

TIE WIRE
NUMBER OF THE BAR INTERSECTION IN ONE FOOTING
6

TOTAL TIES FOR

12
12

Using

0.25 m

36

ties

432

ties

FOOTINGS
36

length per tie =

432

One kilo of no. 16 G.I. wire is approximately


108

30 =

3.6

30 m
kilos

0.250

108

DETAILED OF THE CONSTRUCTION ESTIMATE

1.05

M LONG

meters

CONCRETE MATERIALS :

FOOTING 2

CLASS "A" MIXTURE


FOOTING DEMINSION
LENGTH:

1m

WIDTH:

1m

THICK:

0.35 m

VOL. OF FOOTING

0.35 cu.m.

TOTAL VOLUME OF THE

VOLUME=
CEMENT:

FOOTING

1.4 cu.m.

1.4

12.6 bags

SAND:

1.4

0.5

0.7 cu.m.

GRAVEL:

1.4

1.4 cu.m.

REINFORCE BARS MATERIALS :

FOOTING 2

NET LENGTH :
1

0.075 +

0.075

0.85 m

TOTAL NO. OF CUT BARS IN ONE FOOTING BY DIRECT COUNTING


5x

10

pcs

TOTAL NO. OF BARS FOR THE


10

40

FOOTING

pcs

0.85

SELECT THE STEEL BARS WHOSE LENGTH IS ECONOMICALLY CUT INTO


6

0.85

0.85

7.05882 pcs

Divide the result:


40

pcs of 16mm diameter bars

TIE WIRE
NUMBER OF THE BAR INTERSECTION IN ONE FOOTING
5

TOTAL TIES FOR

4
Using

0.25 m

25

ties

100

ties

FOOTINGS
25

length per tie =

100

One kilo of no. 16 G.I. wire is approximately


25

30 =

0.8

30 m
kilos

0.250

25

meters

meters

LONG

COLUMN 1 TIES :

HEIGHT FROM GROUND LINE TO BEAM


HT. =

6.6

Mtrs.

0.2 m. spacing

Divide:
6.6
0.2

44 pcs

- Total ties of the columns=

12

- Multiply:
12 x 44

528

- Length of one lateral ties


1.45 m. long cut from a 6.00 m. steel bars
6
=
1.45

w= 0.275

pcs

- Result
d= 0.45

528
5

10 pcs
tiesl bars

= 104 pcs- 10 mm ties bars

- Tie wire
no. of ties in a column
6
x
44 =

264

total wire for the


264 x
12 =

12
3168

multiply:
3168 x

One kilo of no. 16 G.I. wire is approximately


792

35 =

22.6

35 m
kilos

0.25 =

792

EAM

m. spacing

pcs

6.00 m. steel bars

10 mm ties bars

columns
pcs

w= 0.275

12

A=
d=

0.45

7.5

6
bars

B=
TOTAL =

7.6

0.200
mtrs. Length

Result:
no. of vertical bars
Total of vertical bars =

pcs of one column


99.94 pcs

16mm vertical bars

column post

rtical bars

DETAILED OF  THE CONSTRUCTION ESTIMATE
CONCRETE MATERIALS :
FOOTING 1
CLASS "A" MIXTURE
FOOTING DEMINSION
LENGTH:
1.2 m
WIDTH
DETAILED OF  THE CONSTRUCTION ESTIMATE
1.05
M LONG
meters
CONCRETE MATERIALS :
FOOTING 2
CLASS "A" MIXTURE
FOOTING DEMINSION
LENGTH:
1 m
WIDTH:
1 m
THICK:
0.35 m
 VOL. OF FOOTING
0.35
M
LONG
meters
COLUMN 1  TIES :
HEIGHT FROM  GROUND LINE TO BEAM
HT. =
6.6
Mtrs.
@
0.2  m.   spacing
-
Divide:
6.6
=
44
pcs
0.2
- Total ties
AM
m.   spacing
pcs
6.00 m. steel bars
10 mm ties bars
columns
pcs
m
w= 0.275
12
A=
7.5
d=
0.45
6
bars
B=
0.200
TOTAL =
7.6
mtrs. Length
Result:
no. of vertical bars
8
pcs of one column
Total of
column post
rtical bars