DETAILED OF THE CONSTRUCTION ESTIMATE
CONCRETE MATERIALS :
FOOTING 1
CLASS "A" MIXTURE
FOOTING DEMINSION
LENGTH:
1.2 m
WIDTH:
1m
THICK:
0.35 m
VOL. OF FOOTING
0.42
cu.m.
TOTAL VOLUME OF THE
VOLUME=
CEMENT:
12
FOOTING
5.04 cu.m.
5.04
45.36 bags
SAND:
5.04
0.5
2.52 cu.m.
GRAVEL:
5.04
5.04 cu.m.
REINFORCE BARS MATERIALS :
FOOTING 1
NET LENGTH :
1.2
0.075 +
0.075
1.05 m
TOTAL NO. OF CUT BARS IN ONE FOOTING BY DIRECT COUNTING
6x
12
pcs
TOTAL NO. OF BARS FOR THE 12
12
12
144
FOOTING
pcs
1.05
SELECT THE STEEL BARS WHOSE LENGTH IS ECONOMICALLY CUT INTO
6
1.05
5.71429 pcs
Divide the result:
144
29
pcs of 16mm diameter bars
TIE WIRE
NUMBER OF THE BAR INTERSECTION IN ONE FOOTING
6
TOTAL TIES FOR
12
12
Using
0.25 m
36
ties
432
ties
FOOTINGS
36
length per tie =
432
One kilo of no. 16 G.I. wire is approximately
108
30 =
3.6
30 m
kilos
0.250
108
DETAILED OF THE CONSTRUCTION ESTIMATE
1.05
M LONG
meters
CONCRETE MATERIALS :
FOOTING 2
CLASS "A" MIXTURE
FOOTING DEMINSION
LENGTH:
1m
WIDTH:
1m
THICK:
0.35 m
VOL. OF FOOTING
0.35 cu.m.
TOTAL VOLUME OF THE
VOLUME=
CEMENT:
FOOTING
1.4 cu.m.
1.4
12.6 bags
SAND:
1.4
0.5
0.7 cu.m.
GRAVEL:
1.4
1.4 cu.m.
REINFORCE BARS MATERIALS :
FOOTING 2
NET LENGTH :
1
0.075 +
0.075
0.85 m
TOTAL NO. OF CUT BARS IN ONE FOOTING BY DIRECT COUNTING
5x
10
pcs
TOTAL NO. OF BARS FOR THE
10
40
FOOTING
pcs
0.85
SELECT THE STEEL BARS WHOSE LENGTH IS ECONOMICALLY CUT INTO
6
0.85
0.85
7.05882 pcs
Divide the result:
40
pcs of 16mm diameter bars
TIE WIRE
NUMBER OF THE BAR INTERSECTION IN ONE FOOTING
5
TOTAL TIES FOR
4
Using
0.25 m
25
ties
100
ties
FOOTINGS
25
length per tie =
100
One kilo of no. 16 G.I. wire is approximately
25
30 =
0.8
30 m
kilos
0.250
25
meters
meters
LONG
COLUMN 1 TIES :
HEIGHT FROM GROUND LINE TO BEAM
HT. =
6.6
Mtrs.
0.2 m. spacing
Divide:
6.6
0.2
44 pcs
- Total ties of the columns=
12
- Multiply:
12 x 44
528
- Length of one lateral ties
1.45 m. long cut from a 6.00 m. steel bars
6
=
1.45
w= 0.275
pcs
- Result
d= 0.45
528
5
10 pcs
tiesl bars
= 104 pcs- 10 mm ties bars
- Tie wire
no. of ties in a column
6
x
44 =
264
total wire for the
264 x
12 =
12
3168
multiply:
3168 x
One kilo of no. 16 G.I. wire is approximately
792
35 =
22.6
35 m
kilos
0.25 =
792
EAM
m. spacing
pcs
6.00 m. steel bars
10 mm ties bars
columns
pcs
w= 0.275
12
A=
d=
0.45
7.5
6
bars
B=
TOTAL =
7.6
0.200
mtrs. Length
Result:
no. of vertical bars
Total of vertical bars =
pcs of one column
99.94 pcs
16mm vertical bars
column post
rtical bars