You are on page 1of 85

Estimate of Foundation

Spread Footing, F1: (4 Footings)


(Concreting)
Depth = 1.5 m
Width = 1.7 m
Length = 1.7 m
Thickness = 0.32 m

Total Vol. of Footing = 4.4342 cu.m


Using Class A Mixture: 40 Kg
Cement = 39.9078 ≈ 40 Bags
Sand = 2.2171 ≈ 2.2 cu.m
Gravel = 4.4342 ≈ 4.4 cu.m

Spread Footing, F1: (4 Footings)


(Rebars)
Length of Bars = 1.75 m
Using 6m Length of Steel Bar:
6/1.75 = 3.42857143 ≈ 3

# of bars hor. & vert. = 14


# of bars = 4.66666667 ≈ 5 bars - 16 mm Φ
Total = 20 bars - 16 mm Φ

Spread Footing, F2: (6 Footings)


(Concreting)
Depth = 1.5 m
Width = 2.1 m
Length = 2.1 m
Thickness = 0.36 m

Total Vol. of Footing = 10.6281 cu.m


Using Class A Mixture: 40 Kg
Cement = 95.6529 ≈ 96 Bags
Sand = 5.31405 ≈ 5.3 cu.m
Gravel = 10.6281 ≈ 10.6 cu.m

Spread Footing, F2: (6 Footings)


(Rebars)
Length of Bars = 2.15 m
Using 6m Length of Steel Bar:
6/2.15 = 2.79069767 ≈ 2
# of bars hor. & vert. = 24
# of bars = 12 bars - 16 mm Φ
Total = 72 bars - 16 mm Φ

Combined Footing, F3: (3 Footings)


(Concreting)
Depth = 1.5 m
Width = 3.2 m
Length = 3.5 m
Thickness = 0.68 m

Total Vol. of Footing = 46.7985 cu.m


Using Class A Mixture: 40 Kg
Cement = 421.1865 ≈ 422 Bags
Sand = 23.39925 ≈ 23.4 cu.m
Gravel = 46.7985 ≈ 46.8 cu.m

Combined Footing, F3: (3 Footings)


(Rebars) # of bars roundup
Length of Bars 3.2 m 26 26 26
Length of Bars 3.5 m 24 24 24
Using 6m Length of Steel Bar:
6/3.2 = 1.875 ≈ 1
6/3.5 = 1.71428571 ≈ 1

# of bars = 50 bars - 16 mm Φ
Total = 150 bars - 16 mm Φ

Combined Footing, F4: (2 Footings)


(Concreting)
Depth = 1.5 m
Width = 2.2 m
Length = 2.5 m
Thickness = 0.3 m

Total Vol. of Footing = 11.0025 cu.m


Using Class A Mixture: 40 Kg
Cement = 99.0225 ≈ 100 Bags
Sand = 5.50125 ≈ 5.5 cu.m
Gravel = 11.0025 ≈ 11.0 cu.m

Combined Footing, F4: (2 Footings)


(Rebars) # of bars roundup
Length of Bars 2.2 m 14 7 7
Length of Bars 2.5 m 13 6.5 7
Using 6m Length of Steel Bar:
6/2.2 = 2.72727273 ≈ 2
6/2.5 = 2.4 ≈ 2

# of bars = 14 bars - 16 mm Φ
Total = 28 bars - 16 mm Φ

Spread Footing, STF1: (2 Footings)


(Concreting)
Depth = 1.2 m
Width = 1.5 m
Length = 1.5 m
Thickness = 0.27 m

Total Vol. of Footing = 4.527 cu.m


Using Class A Mixture: 40 Kg
Cement = 40.743 ≈ 41 Bags
Sand = 2.2635 ≈ 2.3 cu.m
Gravel = 4.527 ≈ 4.5 cu.m

Spread Footing, STF1: (2 Footings)


(Rebars)
Length of Bars = 1.55 m
Using 6m Length of Steel Bar:
6/1.55 = 3.87096774 ≈ 3

# of bars hor. & vert. = 12


# of bars = 4 bars - 16 mm Φ
Total = 16 bars - 16 mm Φ
Spread Footing, F1: (4 Footings)
(Tie Wires)
Hor. Bars = 7
Vert. Bars = 7
# of intersections = 49 x 4 Footings = 196 intersections
78.4 m / 53 = 1.479245 ≈ 2 Kg

Spread Footing, F2: (6 Footings)


(Tie Wires)
Hor. Bars = 12
Vert. Bars = 12
# of intersections = 144 x 6 Footings = 864 intersections
345.6 m / 53 = 6.520755 ≈ 7 Kg
Spread Footing, F3: (3 Footings)
(Tie Wires)
Hor. Bars = 24
Vert. Bars = 26
# of intersections = 624 x 3 Footings = 1872 intersections
748.8 m / 53 = 14.1283 ≈ 15 Kg

Spread Footing, F4: (2 Footings)


(Tie Wires)
Hor. Bars = 13
Vert. Bars = 14
# of intersections = 182 x 2 Footings = 364 intersections
145.6 m / 53 = 2.74717 ≈ 3 Kg
Spread Footing, STF1: (2 Footings)
(Tie Wires)
Hor. Bars = 6
Vert. Bars = 6
# of intersections = 36 x 6 Footings = 72 intersections
28.8 m / 53 = 0.543396 ≈ 1 Kg
Total Number of: Qty Unit
Cement: 699 Bags
Sand: 38.7 cu.m
Gravel: 77.4 cu.m
16 mm Φ bars: 286 pcs
#16 Tie Wires: 28 Kg
Estimate of Wall Footing
n TIES, 10mm CHB
n TIES0.65
6m
Wall Lwall nL 3nL roundup roundup
1 15.14 3 9 75.7 76 8.444444 75.7
2 5.02 2 6 25.1 26 2.888889 25.1
3 10.09 1 3 50.45 51 5.666667 50.45
4 4.93 1 3 24.65 25 2.777778 24.65
5 2.93 2 6 14.65 15 1.666667 14.65
6 2.52 1 3 12.6 13 1.444444 12.6
7 2.48 1 3 12.4 13 1.444444 12.4
8 1.89 1 3 9.45 10 1.111111 9.45
9 1.84 1 3 9.2 10 1.111111 9.2
10 1.93 1 3 9.65 10 1.111111 9.65
11 4.64 5 15 23.2 24 2.666667 23.2
12 1.74 3 9 8.7 9 1 8.7
13 5.64 4 12 28.2 29 3.222222 28.2
14 1.63 4 12 8.15 9 1 8.15
15 1.38 2 6 6.9 7 0.777778 6.9
16 2.17 3 9 10.85 11 1.222222 10.85
Total: 65.97 35 105 338 37.55556 38

Total # of 6m Long Hor. Bars = 105 bars - 12 mm Φ


Total # of 6m Long Bars = 38 bars - 10 mm Φ
Total # of CHB = 338 pcs.
Total Kg of Tie Wires = 2 Kg

Total Vol. of Mortar = 1.014 cu.m


Using Class B Mixture: 40 Kg
Cement = 12.168 ≈ 13 Bags
Sand = 1.014 ≈ 1.0 cu.m

Total Vol. of Footing = 4.74984 cu.m


Using Class A Mixture: 40 Kg
Cement = 42.74856 ≈ 43 Bags
Sand = 2.37492 ≈ 2.4 cu.m
Gravel = 4.74984 ≈ 4.7 cu.m
CHB Vol., cu.m Ltw, m Wtw, kg
mortar footing
roundup
76 0.228 1.09008 22.8 0.430189
26 0.078 0.36144 7.8 0.14717
51 0.153 0.72648 15.3 0.288679
25 0.075 0.35496 7.5 0.141509
15 0.045 0.21096 4.5 0.084906
13 0.039 0.18144 3.9 0.073585
13 0.039 0.17856 3.9 0.073585
10 0.03 0.13608 3 0.056604
10 0.03 0.13248 3 0.056604
10 0.03 0.13896 3 0.056604
24 0.072 0.33408 7.2 0.135849
9 0.027 0.12528 2.7 0.050943
29 0.087 0.40608 8.7 0.164151
9 0.027 0.11736 2.7 0.050943
7 0.021 0.09936 2.1 0.039623
11 0.033 0.15624 3.3 0.062264
338 1.014 4.74984 101.4 1.913208
Estimate of Columns

For C1: (1st Floor)


(Concreting)
Dimensions:
b= 300 mm 0.3 m
h= 300 mm 0.3 m
L= 3100 mm 3.1 m
Vol. = 0.279 cu.m
Total Volume = 3.906 cu.m

Using Class A Mixture: 40 Kg


Cement = 35.154 Bags ≈ 36 Bags
Sand = 1.953 cu.m ≈ 1.953 cu.m
Gravel = 3.906 cu.m ≈ 3.906 cu.m

For C2: (2nd floor)


(Concreting)
Dimensions:
b= 300 mm 0.3 m
h= 300 mm 0.3 m
L= 3100 mm 3.1 m
Vol. = 0.279 cu.m
Total Volume = 1.674 cu.m

Using Class A Mixture: 40 Kg


Cement = 15.066 Bags ≈ 16 Bags
Sand = 0.837 cu.m ≈ 0.837 cu.m
Gravel = 1.674 cu.m ≈ 1.674 cu.m

Cement: 194 Bags


Sand: 10.62 cu.m
Gravel: 21.24 cu.m

For C1:
(Rebars)
Total Height Ground Floor to 2nd Floor = 3.1 m
Bend = 0.2 m
Splice = 0.6 m
From footing to half of 1st flr.
(w/ splicing) 3.3 m
Half of 1st flr. to Half of 2nd flr.
(w/ splicing) 4.4 m
Half of 2nd flr. to 4th flr. (w/
splicing) 7.5 m

1 bar x 12 vert. bars x 16 columns = 192 bars - 16 mm Φ


1 bar x 12 vert. bars x 16 columns = 192 bars - 16 mm Φ
2 bars x 12 vert. bars x 16 columns = 384 bars - 16 mm Φ

Total # of 6m Length of Steel Bars for 20 Columns = 1280 bars - 16 mm Φ

Columns:
(Stirrups)

For C1 - 1F: (16 Columns) L= 3100 mm


Length of Stirrups = (0.3-0.04-0.04)(4) + (5x0.010x5) + (0.10x2)
= 1.33 m
Using 6m length of steel bar
6/1.33 = 4.5112782 say 4

12 @ 60mm, rest @ 90mm


12 - 60mm x 2 = 1440 mm = 20 Stirrups
@ 90mm = = 18 Stirrups

3100mm - 1440mm 1660


18.444444 say 18
Total # of Stirrups = 38 ties
# of Bars = 9.5 say 10 bars - 10 mm Φ
12 bars x 16 columns = 160 bars - 10 mm Φ
For C2 - 2F: (16 Columns) L= 2900 mm
Length of Stirrups = (0.3-0.04-0.04)(4) + (5x0.010x5) + (0.10x2)
= 1.33 m
Using 6m length of steel bar
6/1.33 = 4.5112782 say 4

8 @ 50mm, rest @ 90mm


8-60mm x 2 = 960 mm = 24 Stirrups
@ 90 mm = = 21 Stirrups

2900mm - 960mm 1940


21.555556 say 21
Total # of Stirrups = 45 ties
# of Bars = 11.25 say 12 bars - 10 mm Φ
8 bars x 16 columns = 192 bars - 10 mm Φ
For C2 - 3F: (16 Columns) L= 3100 mm
Length of Stirrups = (0.3-0.04-0.04)(4) + (5x0.010x5) + (0.10x2)
= 1.33 m
Using 6m length of steel bar
6/1.13 = 4.5112782 say 4

8 @ 60mm, rest @ 90mm


8-60mm x 2 = 960 mm = 20 Stirrups
@ 90 mm = = 23 Stirrups

3100mm - 960mm 2140


23.777778 say 23
Total # of Stirrups = 43 ties
# of Bars = 10.75 say 11 bars - 10 mm Φ
8 bars x 16 columns = 176 bars - 10 mm Φ
For C2 - 4F: (4 Columns) L= 2900 mm
Length of Stirrups = (0.3-0.04-0.04)(4) + (5x0.010x5) + (0.10x2)
= 1.33 m
Using 6m length of steel bar
6/1.13 = 4.5112782 say 4

8 @ 60mm, rest @ 90mm


8 - 60mm x 2 = 960 mm = 20 Stirrups
@ 90mm = = 21 Stirrups

2900mm - 960mm 1940


21.555556 say 21
Total # of Stirrups = 41 ties
# of Bars = 10.25 say 11 bars - 10 mm Φ
8 bars x 4 columns = 44 bars - 10 mm Φ

Total # of 6m Length of Steel Bars for 20 Columns = 572 bars - 10 mm Φ


For C2: (3rd Floor)
(Concreting)
Dimensions:
b= 300 mm 0.3 m
h= 300 mm 0.3 m
L= 2900 mm 2.9 m
Vol. = 0.261 cu.m
Total Volume = 10.962 cu.m

Using Class A Mixture: 40 Kg


Cement = 98.658 Bags ≈ 99 Bags
Sand = 5.481 cu.m ≈ 5.481 cu.m
Gravel = 10.962 cu.m ≈ 10.962 cu.m

For C2: (Roof Deck)


(Concreting)
Dimensions:
b= 300 mm 0.3 m
h= 300 mm 0.3 m
L= 2900 mm 2.9 m
Vol. = 0.261 cu.m
Total Volume = 4.698 cu.m

Using Class A Mixture: 40 Kg


Cement = 42.282 Bags ≈ 43 Bags
Sand = 2.349 cu.m ≈ 2.349 cu.m
Gravel = 4.698 cu.m ≈ 4.698 cu.m

For C2:
(Rebars)
Total Height 2nd Floor to Roof Deck = 2.9 m
Bend = 0.2 m
Splice = 0.6 m
From footing to half of 1st flr.
(w/ splicing) 3.3 m
Half of 1st flr. to Half of 2nd
flr. (w/ splicing) 4.4 m
Half of 2nd flr. to 4th flr. (w/
splicing) 7.5 m

1 bar x 8 vert. bars x 16 columns = 128 bars - 16 mm Φ


1 bar x 8 vert. bars x 16 columns = 128 bars - 16 mm Φ
2 bars x 8 vert. bars x 16 columns = 256 bars - 16 mm Φ

Columns:
(Tie Wires)

For C1 - 1F: (16 Columns) L= 3100 mm


12 bars x 41 ties = 492 intersections x 14 columns = 6888

Therefore, 2755.2 m = 51.9849057 ≈ 52

For C2 - 2F: (16 Columns) L= 2900 mm


8 bars x 45 ties = 360 intersections x 6 columns = 5040

Therefore, 2016 m = 38.0377358 ≈ 39

For C2 - 3F: (16 Columns) L= 3100 mm


8 bars x 43 ties = 344 intersections x 6 columns = 4816

Therefore, 1926.4 m = 36.3471698 ≈ 37

For C2 - 4F: (4 Columns) L= 2900 mm


8 bars x 41 ties = 328 intersections x 14 columns = 13776

Therefore, 5510.4 m = 103.969811 ≈ 104

Total Kg of Tie Wires = 232 Kg


Total Number of: Qty Unit
Cement: 194 Bags
Sand: 10.62 cu.m
Gravel: 21.24 cu.m
16 mm Φ bars: 1280 pcs
10 mm Φ bars: 572 pcs
#16 Tie Wires: 232 Kg
ties

Kg

ties

Kg

ties

Kg

ties

Kg
Estimate of Stair Columns

Stair Column
(Concreting)
Dimensions:
b= 250 mm 0.25 m
h= 250 mm 0.25 m
L= 3000 mm 3m
Vol. = 0.1875 cu.m
Total Volume = 1.5 cu.m

Using Class A Mixture: 40 Kg


Cement = 13.5 Bags ≈ 14 Bags
Sand = 0.75 cu.m ≈ 0.75 cu.m
Gravel = 1.5 cu.m ≈ 1.5 cu.m

Stair Column
(Rebars)
Total Height Ground Floor to 4th Floor = 15.9 m
Bend = 0.2 m
Splice = footing to half of 1st flr. (w/ 0.6 m
From
Half of 1st flr.splicing)
to Half of 2nd flr. (w/ 4.2 m
splicing) 4.4 m
Half of 2nd flr. to 4th flr. (w/ splicing) 7.5 m

1 bar x 4 vert. bars x 8 columns = 32 bars - 16 mm Φ


1 bar x 4 vert. bars x 8 columns = 32 bars - 16 mm Φ
2 bars x 4 vert. bars x 8 columns = 64 bars - 16 mm Φ

Total # of 6m Length of Steel Bars for 8 Columns = 512 bars - 16 mm Φ


Stair Column
(Stirrup)
L= 3000 mm
Length of Stirrups = (0.25-0.04-0.04)(4) + (5x0.010x5) + (0.10x2)
= 1.13 m
Using 6m length of steel bar
6/1.13 = 5.309735 say 5

10 @ 60mm, rest @ 90mm,


10-60mm x 2 = 1200 mm = 2 Stirrups
@ 100mm = = 6 Stirrups

3000mm - 1200mm 1800


6.923077 say 6
Total # of Stirrups = 22 ties
# of Bars = 4.4 say 5 bars - 10 mm Φ
5 bars x 8 columns = 160 bars - 10 mm Φ

Total # of 6m Length of Steel Bars for 8 Columns = 160 bars - 10 mm Φ

Stair Column
(Tie Wires)
L= 3000 mm
5 bars x 22 ties = 88 intersections x 8 columns =

Therefore, 1126.4 m = 21.25283 ≈

Total Kg of Tie Wires = 88 Kg


Total Number of: Qty Unit
Cement: 14 Bags
Sand: 0.75 cu.m
Gravel: 1.5 cu.m
16 mm Φ bars: 512 pcs
10 mm Φ bars: 160 pcs
#16 Tie Wires: 88 Kg

2816 ties

22 Kg
Estimate of Beams

Column-Tie Beam
(Concreting)

b= 400 mm 0.4
h= 500 mm 0.5

Using Class A Mixture : 40 Kg


Cement: 254.952 255 Bags
Sand: 14.164 15 cu.m
Gravel: 28.328 29 cu.m

Column-Tie Beam
(Rebars)
TB1-1, L = 4.48 m, 4 beams
Using 6m length of steel bar

@ Support: 2 bars 8 bars x 4 beams = 32 bars - 16 mm Φ


@ Midspan: 2 bars

TB1-2, L = 1.74m, 4 beams


@ Support: L/4; L = 0.435 m
Using 6m length of steel bar 13.793103448276 13

@ Support: 5 bars 8 bars x 4 beams = 32 bars - 16 mm Φ


@ Midspan: 3 bars

TB1-3, L = 5.79m, 4 beams


@ Support: L/4; L = 1.4475 m
Using 6m length of steel bar 4.1450777202073 4

@ Support: 4 bars 6 bars x 4 beams = 24 bars - 16 mm Φ


@ Midspan: 3 bars

TB1-4, L = 5.4m, 4 beams


@ Support: L/4; L = 1.35 m
Using 6m length of steel bar 4.4444444444444 4
@ Support: 5 bars 8 bars x 4 beams = 32 bars - 16 mm Φ
@ Midspan: 3 bars

TB2, L = 5m, 4 beams


@ Support: L/4; L = 1.25 m
Using 6m length of steel bar 4.8 4

@ Support: 3 bars 9 bars x 4 beams = 36 bars - 16 mm Φ


@ Midspan: 2 bars

TB1-4, L = 4.6m, 4 beams


@ Support: L/4; L = 1.15 m
Using 6m length of steel bar 5.2173913043478 5

@ Support: 5 bars 7 bars x 6 beams = 42 bars - 16 mm Φ


@ Midspan: 3 bars

Total # of 6m Length of Steel Bars (Tie Beam) = 198 bars - 16 mm Φ

2nd Flr to 4th Flr


(Concreting)
b= 400 mm 0.4
h= 500 mm 0.5

Length, m Number of Beams Volume, cu.m


G1 1.6 8 2.56
G2 4.48 4 3.584
G3 1.74 4 1.392
G4 5.79 4 4.632
G5 5.4 6 6.48
G6 4.6 4 3.68
G7 5 6 6
Total 28.328
Using Class A Mixture : 40 Kg
Cement: 254.952 255 Bags
Sand: 14.164 15 cu.m
Gravel: 28.328 29 cu.m

Total (2F-4F) :
Cement: 765 Bags
Sand: 45 cu.m
Gravel: 87 cu.m
2nd Flr to 4th Flr
(Rebars)
G1, L = 1.6m, 8 beams
Using 6m length of steel bar

@ Support: 3 bars 8 bars x 8 beams = 64 bars - 16 mm Φ


@ Midspan: 2 bars

G2, L = 4.48m, 4 beams


Using 6m length of steel bar

@ Support: 2 bars 8 bars x 4 beams = 32 bars - 16 mm Φ


@ Midspan: 2 bars

G3, L = 1.74m, 4 beams


Using 6m length of steel bar

@ Support: 2 bars 8 bars x 2 beams = 16 bars - 16 mm Φ


@ Midspan: 2 bars

G4, L = 5.79m, 4 beams


Using 6m length of steel bar

@ Support: 2 bars 6 bars x 4 beams = 24 bars - 16 mm Φ


@ Midspan: 2 bars

G5, L = 5.4m, 6 beams


Using 6m length of steel bar

8 bars x 4 beams =
@ Support: 2 bars 32 bars - 16 mm Φ
@ Midspan: 2 bars

G6, L = 4.6m, 4 beams


Using 6m length of steel bar

@ Support: 2 bars 7 bars x 6 beams = 42 bars - 16 mm Φ


@ Midspan: 2 bars
G7, L = 5m, 6 beams
Using 6m length of steel bar

9 bars x 4 beams =

@ Support: 2 bars 36 bars - 16 mm Φ


@ Midspan: 2 bars

Total # of 6m Length of Steel Bars = 64 bars - 16 mm Φ


Total # of 6m Length of Steel Bars (2F-4F) = 192 bars - 16 mm Φ
Total # of 6m Length of Steel Bars (RT) = 33 bars - 16 mm Φ

Total Number of: Qty Unit


Cement: 1020 Bags
Sand: 60 cu.m
Gravel: 116 cu.m
16 mm Φ bars: 937 pcs
10 mm Φ bars: 514 pcs
#16 G.I Tie Wires: 202 Kg
Column-Tie Beam
(Stirrups)

m For TB1: (4 Beams)


m Length of Stirrups = (0.50-0.04-0.04)(2) + (0.4-0.04-0.04)(2) + (5x0.010x5) +
(0.10x2) =
= 1.93 m
Using 6m length of steel bar
6/1.33 = 3.10880829015544 say

1 @ 60mm rest @ 170mm


1-60mm x 2 = 120 mm
@ 170mm =
4480mm - 120mm 4360
25.6470588235294 say
Total # of Stirrups = 27 ties
# of Bars = 9 say
3 bars x 4 beams = 36

For TB2 : (4 Beams)


Length of Stirrups = (0.50-0.04-0.04)(2) + (0.4-0.04-0.04)(2) + (5x0.010x5) +
(0.10x2) =
= 1.93 m
Using 6m length of steel bar
6/1.23 = 3.10880829015544 say

1 @ 60mm rest @ 170mm


1-60mm x 2 = 120 mm
@ 170mm =
1740mm - 120mm 1620
9.52941176470588 say
Total # of Stirrups = 11 ties
# of Bars = 3.66666666666667 say
3 bars x 5 beams = 16

For TB3 : (4 Beams)


Length of Stirrups = (0.50-0.04-0.04)(2) + (0.4-0.04-0.04)(2) + (5x0.010x5) +
(0.10x2) =
= 1.93 m
Using 6m length of steel bar
6/1.23 = 3.10880829015544 say
1 @ 60mm rest @ 170mm
1-60mm x 2 = 120 mm
@ 170mm =
5790mm - 120mm 5670
33.3529411764706 say
Total # of Stirrups = 35 ties
# of Bars = 11.6666666666667 say
3 bars x 5 beams = 48

Total # of 6m Length of Steel Bars (Tie Beam) = 266

2nd Flr to 4th Flr


m (Stirrups)
m
For G1: (8 Beams)
Length of Stirrups = (0.50-0.04-0.04)(2) + (0.4-0.04-0.04)(2) + (5x0.010x5) +
(0.10x2) =
= 1.93 m
Using 6m length of steel bar
6/1.33 = 3.10880829015544 say

1 @ 60mm rest @ 110mm


1-60mm x 2 = 120 mm
17220mm =
1600mm - 120mm 1480
8.70588235294118 say
Total # of Stirrups = 10 ties
# of Bars = 3.33333333333333 say
8 bars x 8 beams = 32

For G2: (4 Beams)


Length of Stirrups = (0.5-0.04-0.04)(2) + (0.40-0.04-0.04)(2) + (5x0.010x5) +
(0.10x2) =
= 1.93 m
Using 6m length of steel bar
6/1.33 = 3.10880829015544 say

1 @ 60mm rest @ 220mm


1-60mm x 2 = 120 mm
@ 170mm =
4480mm - 120mm 4360
25.6470588235294 say
Total # of Stirrups = 27 ties
# of Bars = 9 say
3 bars x 5 beams = 36

For G3: (4 Beams)

(0.50-0.04-0.04)(2) + (0.4-0.04-0.04)(2) + (5x0.010x5) +


(0.10x2) =
Length of Stirrups =

= 1.93 m
Using 6m length of steel bar
6/1.33 = 3.10880829015544 say

1 @ 60mm rest @ 220mm


1-60mm x 2 = 120 mm
17220mm =
1740mm - 120mm 1620
9.52941176470588 say
Total # of Stirrups = 11 ties
# of Bars = 3.66666666666667 say
8 bars x 26 beams = 16

For G4: (4 Beams)


(0.50-0.04-0.04)(2) + (0.4-0.04-
0.04)(2) + (5x0.010x5) + (0.10x2)
Length of Stirrups = =

= 1.93 m
Using 6m length of steel bar
6/1.33 = 3.10880829015544 say

1 @ 60mm rest @ 220mm


1-60mm x 2 = 120 mm
17220mm =
5790mm - 120mm 5670
33.3529411764706 say
Total # of Stirrups = 35 ties

# of Bars = 11.6666666666667 say


8 bars x 4 beams = 48

Total # of 6m Length of Steel Bars = 68


Total # of 6m Length of Steel Bars (2F-4F) = 204
Total # of 6m Length of Steel Bars (RT) = 44
L= 4480 mm For TB4 : (6 Beams)
4-0.04)(2) + (5x0.010x5) + Length of Stirrups = (0.50-0.04-0.04)(2) + (0.4-0.04-0.04)(2) + (5x0.010
2) = (0.10x2) =
= 1.93 m
Using 6m length of steel bar
3 6/1.23 = 3.10880829015544 say

1 @ 60mm rest @ 170mm


= 2 Stirrups 1-60mm x 2 = 120 mm
= 25 Stirrups @ 170mm =
5400mm - 120mm 5280
25 31.0588235294118 say
Total # of Stirrups = 33 ties
9 bars - 10 mm Φ # of Bars = 11 say
bars - 10 mm Φ 3 bars x 5 beams = 66

L= 1740 mm For TB5 : (4 Beams)


4-0.04)(2) + (5x0.010x5) + Length of Stirrups = (0.50-0.04-0.04)(2) + (0.4-0.04-0.04)(2) + (5x0.010
2) = (0.10x2) =
= 1.93 m
Using 6m length of steel bar
3 6/1.23 = 3.10880829015544 say

1 @ 60mm rest @ 170mm


= 2 Stirrups 1-60mm x 2 = 120 mm
= 8 Stirrups @ 170mm =
4600mm - 120mm 4480
9 26.3529411764706 say
Total # of Stirrups = 28 ties
4 bars - 10 mm Φ # of Bars = 9.33333333333333 say
bars - 10 mm Φ 3 bars x 5 beams = 40

L= 5790 mm For TB6 : (6 Beams)


4-0.04)(2) + (5x0.010x5) + Length of Stirrups = (0.50-0.04-0.04)(2) + (0.4-0.04-0.04)(2) + (5x0.010
2) = (0.10x2) =
= 1.93 m
Using 6m length of steel bar
3 6/1.23 = 3.10880829015544 say
1 @ 60mm rest @ 170mm
= 2 Stirrups 1-60mm x 2 = 120 mm
= 8 Stirrups @ 170mm =
5000mm - 120mm 4880
33 28.7058823529412 say
Total # of Stirrups = 30 ties
12 bars - 10 mm Φ # of Bars = 10 say
bars - 10 mm Φ 3 bars x 5 beams = 60

bars - 10 mm Φ

2nd Flr to 4th Flr


(Tie Wires)

L= 1600 mm For G1: (8 Beams)


4-0.04)(2) + (5x0.010x5) + 8 bars x 10 ties = 80
2) =
Therefore, 832 m

3 For G2: (4 Beams)


8 bars x 27 ties = 216

= 2 Stirrups Therefore, 432 m


= 8 Stirrups
For G3: (4 Beams)
8 6 bars x 11 ties = 66

4 bars - 10 mm Φ Therefore, 132 m


bars - 10 mm Φ
For G4: (4 Beams)
L= 4480 mm 6 bars x 35 ties = 210
4-0.04)(2) + (5x0.010x5) +
2) = Therefore, 420 m
For G5: (6 Beams)
3 8 bars x 11 ties = 88

Therefore, 176 m
= 2 Stirrups
= 25 Stirrups
Total Kg of Tie Wires = 177
25
For G5: (6 Beams)
9 bars - 10 mm Φ
Length of Stirrups = (0.50-0.04-0.04)(2) + (0.4-0.04-0.04)(2) + (5x0.010
bars - 10 mm Φ (0.10x2) =
= 1.93 m
L= 1740 mm Using 6m length of steel bar

4-0.04)(2) + (5x0.010x5) +
2) =
6/1.33 = 3.10880829015544 say

1 @ 60mm rest @ 220mm


1-60mm x 2 = 120 mm
3 17220mm =
5400mm - 120mm 5280
31.0588235294118 say
= 2 Stirrups Total # of Stirrups = 33 ties
= 9 Stirrups # of Bars = 11 say
8(0.50-0.04-0.04)(2)
bars x 6 beams = 66
9 + (0.4-0.04-0.04)(2)
For G6: (4 Beams) + (5x0.010x5) +
4 bars - 10 mm Φ Length of Stirrups = (0.10x2) =
bars - 10 mm Φ
= 1.93 m
L= 5790 mm Using 6m length of steel bar

6/1.33 = 3.10880829015544 say

1 @ 60mm rest @ 220mm


1-60mm x 2 = 120 mm
3 17220mm =
4600mm - 120mm 4480
26.3529411764706 say
= 2 Stirrups Total # of Stirrups = 28 ties
= 33 Stirrups # of Bars = 9.33333333333333 say
8 bars x 26 beams = 40
33
For G7: (6 Beams)

(0.50-0.04-0.04)(2)
+ (0.4-0.04-0.04)(2)
+ (5x0.010x5) +
12 bars - 10 mm Φ Length of Stirrups = (0.10x2) =
bars - 10 mm Φ
= 1.93 m
Using 6m length of steel bar
bars - 10 mm Φ 6/1.33 = 3.10880829015544 say
bars - 10 mm Φ
bars - 10 mm Φ 1 @ 60mm rest @ 220mm
1-60mm x 2 = 120 mm
17220mm =
5000mm - 120mm 4880
28.7058823529412 say
Total # of Stirrups = 30 ties
# of Bars = 10 say
8 bars x 26 beams = 60
Column-Tie Beam
(Tie Wires)

L= 5400 mm For G1: (6 Beams)


0.04-0.04)(2) + (5x0.010x5) + 9 bars x 10 ties = 90
0x2) =
Therefore, 216 m

3 For G2: (4 Beams)


8 bars x 27 ties = 216

= 2 Stirrups Therefore, 345.6 m


= 8 Stirrups
For G3: (4 Beams)
31 8 bars x 11 ties = 88

11 bars - 10 mm Φ Therefore, 140.8 m


bars - 10 mm Φ
For G4: (4 Beams)
L= 4600 mm 6 bars x 12 ties = 72
0.04-0.04)(2) + (5x0.010x5) +
0x2) = Therefore, 115.2 m

For G5: (6 Beams)


3 8 bars x 11 ties = 88

Therefore, 211.2 m
= 2 Stirrups
= 8 Stirrups For G5: (4 Beams)
7 bars x 10 ties = 70
26
Therefore, 112 m
10 bars - 10 mm Φ
bars - 10 mm Φ Total Kg of Tie Wires = 25

L= 5000 mm
0.04-0.04)(2) + (5x0.010x5) + Length, m Number of Beams Volume, cu.m
0x2) = 1.6 8 2.56
4.48 4 3.584
1.74 4 1.392
3 5.79 4 4.632
5.4 6 6.48
4.6 4 3.68
= 2 Stirrups 5 6 6
= 8 Stirrups Total 28.328

28

10 bars - 10 mm Φ
bars - 10 mm Φ

L= 1600 mm For G6: (4 Beams)


intersections x 26 beams = 2080 ties 7 bars x 28 ties =

= 15.69811 ≈ 16 Kg Therefore,

L= 4480 mm For G7: (6 Beams)


intersections x 5 beams = 1080 ties 9 bars x 30 ties =

= 8.150943 ≈ 9 Kg Therefore,

L= 1740 mm
intersections x 5 beams = 330 ties

= 2.490566 ≈ 3 Kg

L= 5790 mm
intersections x 5 beams = 1050 ties

= 7.924528 ≈ 8 Kg
L= 5400 mm
intersections x 5 beams = 440 ties

= 3.320755 ≈ 4 Kg

Kg

L= 5400 mm
0.04-0.04)(2) + (5x0.010x5) +
0x2) =

= 2 Stirrups
= 31 Stirrups

31

11 bars - 10 mm Φ
bars - 10 mm Φ

L= 4600 mm

= 2 Stirrups
= 26 Stirrups

26

10 bars - 10 mm Φ
bars - 10 mm Φ

L= 5000 mm

= 2 Stirrups
= 28 Stirrups

28

10 bars - 10 mm Φ
bars - 10 mm Φ
L= 5000 mm
intersections x 6 beams = 540 ties

= 4.075472 ≈ 5 Kg

L= 4480 mm
intersections x 4 beams = 864 ties

= 6.520755 ≈ 7 Kg

L= 1740 mm
intersections x 5 beams = 352 ties

= 2.656604 ≈ 3 Kg

L= 5790 mm
intersections x 5 beams = 288 ties

= 2.173585 ≈ 3 Kg

L= 5400 mm
intersections x 5 beams = 528 ties

= 3.984906 ≈ 4 Kg

L= 4600 mm
intersections x 5 beams = 280 ties

= 2.113208 ≈ 3 Kg

Kg
G6: (4 Beams) L= 4600 mm
rs x 28 ties = 196 intersections x 5 beams = 980 ties

392 m = 7.396226 ≈ 8 Kg

G7: (6 Beams) L= 5000 mm


rs x 30 ties = 270 intersections x 5 beams = 1350 ties

540 m = 10.18868 ≈ 11 Kg
Estimate of Stair Beam

Stair Beam
(Concreting)
STB-1
b= 200 mm 0.2 m
h= 350 mm 0.35 m

Length, m Number of Beams Volume, cu.m


2.6 3 0.546

Total 0.546

Using Class A Mixture : 40 Kg


Cement: 4.914 5 Bags
Sand: 0.273 0.28 cu.m
Gravel: 0.546 0.55 cu.m

Stair Beam
(Rebars)
L = 2.6m, 4 beams
Using 6m length of steel bar

@ Support: 2 bars 2 bars x 3 beams = 24 bars - 16 mm Φ


@ Midspan: 2 bars

Total # of 6m Length of Steel Bars (Tie Beam) = 24 bars - 16 mm Φ

Estimate of Intermediate Beam

Intermediate Beam
(Concreting)
Intermediate Beam
b= 200 mm 0.2 m
h= 350 mm 0.35 m

Length, m Number of Beams Volume, cu.m


2.3 6 0.966
2.8 4 0.784
5 4 1.4

Total 3.15

Using Class A Mixture : 40 Kg


Cement: 28.35 29 Bags
Sand: 1.575 1.58 cu.m
Gravel: 3.15 3.15 cu.m

Intermediate Beam
(Rebars)
L = 2.3m, 6 beams
Using 6m length of steel bar

@ Support: 2 bars 2 bars x 6 beams = 12 bars - 16 mm Φ


@ Midspan: 2 bars

L = 2.8m, 4 beams
Using 6m length of steel bar

@ Support: 2 bars 2 bars x 3 beams = 8 bars - 16 mm Φ


@ Midspan: 2 bars

L = 5m, 4 beams
Using 6m length of steel bar

@ Support: 2 bars 2 bars x 3 beams = 8 bars - 16 mm Φ


@ Midspan: 2 bars

Total # of 6m Length of Steel Bars (Tie Beam) = 28 bars - 16 mm Φ


Total Number of: Qty Unit
Cement: 34 Bags
Sand: 1.86 cu.m
Gravel: 3.7 cu.m
16 mm Φ bars: 52 pcs
10 mm Φ bars: 160 pcs
#16 Tie Wires: 20 Kg
eam

Stair Beam
(Stirrups)
L= 2600 mm
Length of Stirrups = (0.20-0.04-0.04)(2) + (0.35-0.04-0.04)(2) +
(5x0.010x5) + (0.10x2) =
= 1.23 m
Using 6m length of steel bar
6/1.23 = 4.87804878048781 say 4

1 @ 50mm rest @ 120mm


1-50mm x 2 = 100 mm = 2 Stirrups
@ 170mm = = 22 Stirrups
2600mm - 100mm 2500
20.8333333333333 say 20
Total # of Stirrups = 22 ties
# of Bars = 5.5 say 6 bars - 10 mm Φ
6 bars x 3 beams = 72 bars - 10 mm Φ

Total # of 6m Length of Steel Bars (Tie Beam) = 72 bars - 10 mm Φ

e Beam

Intermediate Beam
(Stirrups)
L= 2300 mm
Length of Stirrups = (0.20-0.04-0.04)(2) + (0.40-0.04-0.04)(2) +
(5x0.010x5) + (0.10x2) =
= 1.33 m
Using 6m length of steel bar
6/1.33 = 4.51127819548872 say 4

1 @ 50mm rest @ 120mm


1-50mm x 2 = 100 mm = 2 Stirrups
@ 170mm = = 18 Stirrups
2600mm - 100mm 2200
18.3333333333333 say 18
Total # of Stirrups = 20 ties
# of Bars = 5 say 5 bars - 10 mm Φ
5 bars x 3 beams = 20 bars - 10 mm Φ
L= 2800 mm
Length of Stirrups = (0.20-0.04-0.04)(2) + (0.35-0.04-0.04)(2) +
(5x0.010x5) + (0.10x2) =
= 1.33 m
Using 6m length of steel bar
6/1.33 = 4.51127819548872 say 4

1 @ 50mm rest @ 120mm


1-50mm x 2 = 100 mm = 2 Stirrups
@ 170mm = = 22 Stirrups
2600mm - 100mm 2700
22.5 say 22
Total # of Stirrups = 24 ties
# of Bars = 6 say 6 bars - 10 mm Φ
6 bars x 3 beams = 24 bars - 10 mm Φ
L= 5000 mm
Length of Stirrups = (0.20-0.04-0.04)(2) + (0.35-0.04-0.04)(2) +
(5x0.010x5) + (0.10x2) =
= 1.33 m
Using 6m length of steel bar
6/1.33 = 4.51127819548872 say 4

1 @ 50mm rest @ 120mm


1-50mm x 2 = 100 mm = 2 Stirrups
@ 170mm = = 40 Stirrups
2600mm - 100mm 4900
40.8333333333333 say 40
Total # of Stirrups = 42 ties
# of Bars = 10.5 say 11 bars - 10 mm Φ
11 bars x 3 beams = 44 bars - 10 mm Φ

Total # of 6m Length of Steel Bars (Tie Beam) = 88 bars - 10 mm Φ


Intermediate Beam
(Tie Wires)
L= 2200 mm
4 bars x 19 ties = 76 intersections x 3 beams = 228 ties

Therefore, 91.2 m = 1.720755 ≈ 2 Kg

Total Kg of Tie Wires 2 Kg

Intermediate Beam
(Tie Wires)
L= 2300 mm
5 bars x 20 ties = 100 intersections x 3 beams = 300 ties

Therefore, 120 m = 2.264151 ≈ 3 Kg


L= 2800 mm
6 bars x 24 ties = 144 intersections x 3 beams = 432 ties

Therefore, 172.8 m = 3.260377 ≈ 4 Kg


L= 5000 mm
11 bars x 42 ties = 462 intersections x 3 beams = 1386 ties

Therefore, 554.4 m = 10.46038 ≈ 11 Kg

Total Kg of Tie Wires 18 Kg


Estimate for Wall CHB and Reinforcements

Table A-1. Legths and Areas to obtain the number of CHB and Volume of Mortars for Walls
1F & 3F EXT. Height Length Wall Area # of Doors Door Door Area # of Windows
1 3.1 6.39 19.7935 0 0 0
2 3.1 5.02 15.562 1 D4 3.78 0
3 3.1 2.68 8.3018 0 0 0
4 3.1 2.96 9.1698 0 0 0
5 3.1 3.48 10.788 0 0 1
6 3.1 5.32 16.4765 0 0 2
7 3.1 2.94 9.0985 0 0 1
8 3.1 3.40 10.5245 0 0 1
9 3.1 2.96 9.1698 0 0 1
10 3.1 2.68 8.3018 0 0 1
11 3.1 3.95 12.2543 1 D2 1.89 1
12 3.1 2.43 7.5392 0 0 1
13 3.1 3.40 10.5245 0 0 1
14 3.1 6.69 20.739 0 0 2
SUBTOTAL 54.272

Table A-2. Legths and Areas to obtain the number of CHB and Volume of Mortars for Walls
1F & 3F INT. Height Length Wall Area # of Doors Door Door Area # of Windows
1a 3.1 1.7 5.27 1 D3 1.47 0
1b 3.1 1.38 4.278 1 D3 1.47 0
2 3.1 8.66 26.846 2 D2 1.89 0
3a 3.1 1.7 5.27 0 0 0
3b 3.1 1.7 5.27 0 0 0
3c 3.1 2.25 6.975 0 0 0
3d 3.1 4.67 14.477 0 0 0
4a 3.1 1.26 3.906 1 D2 1.89 0
4b 3.1 2.68 8.308 1 D2 1.89 0
4c 3.1 2.25 6.975 0 0 0
4d 3.1 4.67 14.477 0 0 0
5a 3.1 1.7 5.27 1 D3 1.47 0
5b 3.1 1.4 4.34 1 D3 1.47 0
5c 3.1 2.25 6.975 0 0 0
6 3.1 16.14 50.034 0 0 0
7 3.1 15.46 47.926 0 0 0
8 3.1 11.67 36.177 3 D2 1.89 0
9 3.1 5.72 17.732 3 D3 1.47 0
SUBTOTAL 87.26
Table A-3. Legths and Areas to obtain the number of CHB and Volume of Mortars for Walls
2F EXT. Height Length Wall Area # of Doors Door Door Area # of Windows
1 2.9 12 34.8 0 0 0
2 2.9 2.9 8.41 0 0 1
3 2.9 3.52 10.208 1 D2 1.89 1
4 2.9 2.37 6.873 0 0 1
5 2.9 3.53 10.237 1 D2 1.89 1
6 2.9 2.8 8.12 0 0 1
7 2.9 2.82 8.178 0 0 0
8 2.9 4.56 13.224 1 D2 1.89 0
9 2.9 4.62 13.398 0 0 0
10 2.9 6.01 17.429 1 D2 1.89 1
11 2.9 3.2 9.28 0 0 2
12 2.9 5.9 17.11 1 D2 1.89 1
13
SUBTOTAL 54.23

Table A-4. Legths and Areas to obtain the number of CHB and Volume of Mortars for Walls
2F INT. Height Length Wall Area # of Doors Door Door Area # of Windows
1a 2.9 2.82 8.178 1 D2 1.89 0
1b 2.9 4.56 13.224 1 D2 1.89 0
1c 2.9 1.82 5.278 1 D2 1.89 0
1d 2.9 2.8 8.12 1 D2 1.89 0
2a 2.9 5.64 16.356 1 D3 1.47 0
2b 2.9 4.62 13.398 0 0 0
3a 2.9 5.64 16.356 1 D3 1.47 0
3b 2.9 2.43 7.047 0 0 0
4a 2.9 2.82 8.178 1 D2 1.89 0
4b 2.9 2.82 8.178 1 D2 1.89 0
4c 2.9 2.41 6.989 1 D2 1.89 0
4d 2.9 2.22 6.438 1 D2 1.89 0
5 2.9 10.86 31.494 1 D2 1.89 0
6 2.9 10.68 30.972 1 D2 1.89 0
7a 2.9 10.79 31.291 1 D2 1.89 0
7b 2.9 1.6 4.64 1 D3 1.47 0
8a 2.9 10.3 29.87 1 D2 1.89 0
8b 2.9 1.6 4.64 1 D3 1.47 0
SUBTOTAL 86.43
Table A-5. Legths and Areas to obtain the number of CHB and Volume of Mortars for Walls
ROOFDECK Height Length Wall Area # of Doors Door Door Area # of Windows
1 2.9 4.6 13.34 1 D2 1.89 0
2 2.9 4.6 13.34 0 0 0
3 2.9 5.79 16.791 0 0 0
4 2.9 5.79 16.791 0 0 0
SUBTOTAL 20.78

TOTAL NUMBER
OF HOLLOW 14458 pcs.
BLOCKS

TOTAL VOLUME 44.57 cu.m

Volume: 44.57 cu.m


Using Class B Mixture: 40 Kg
Cement: 534.84 ≈ 535 bags
Sand: 44.57 ≈ 44.6 cu.m

Legend: 1F EXT - walls partly or entirely exposed to the surroundings on one face from ground line to to
1F INT - walls inside the structure from the ground line to the top of first floor
2F EXT - walls partly or entirely exposed to the surroundings on one face from top of 1st floor t
2F INT - walls inside the structure from the top of 1st floor to the top of 2nd floor
ROOFDECK - walls present on the roof deck

AREA OF THE WALL w/o doors & windows yet AREA OF CHB WALL
CHB Area = Wall Area - (n
Wall Area = Hwall x Lwall where:

where: Hwall = height of wall


Lwall = length of wall Sample Solution for 1F EX
Wall Area = area of wall in sq. m CHB Area = Wall Area - (nd

*Since cut hollow blocks may be broken, thus Number of CHB layers
useless, it is safer to take the distance on the
centers of end columns on each side as the layers = Hwall/0.2
length of the wall. where:

Sample Solution for 1F EXT:


Wall Area = Hwall x Lwall Sample Solution for 1F EX
= 3 x 5 = 15 sq. m layers = Hwall/0.2 = 3/0.2 =

Table DW-1. Door and window types: Number of CHB


Dimensions and Area
L h AREA no. of CHB = CHB Area/(0
DOORS Ad where:
main door D1 1.5 2.1 3.15
int door D2 0.8 2.1 1.68
cr D3 1.5 2.1 3.15
balcony D4 0.75 2.1 1.575 Sample Solution for 1F EX
Windows Aw no. of CHB = CHB Area/(0.2
W1 1 5 5
W2 0.25 2.5 0.625
W3 1.49 0.88 1.311 Volume of mortar, Vm
W4 1.53 1.39 2.127
W5 1 2.3 2.3 Vm = no. of CHB x 4 x 0.2
W6 2.68 3 8.04 where:
W7 0.8 12.5 10

Sample Solution:
Ad = area of door = L x h = 1.5 x 2.1 = 3.15 sq. m
Aw = area of window = L x h = 1 x 5 = 5.0 sq. m
Sample Solution for 1F EX
where: L = length of door or window Vm = no. of CHB x 4 x 0.2 x
h = height of door or window =
B and Reinforcements

Window Window Area CHB Area Layers # of CHB ROUNDUP Vm


0.0 19.8 15.5 247.41875 248 1.116
0.0 11.8 15.5 147.275 148 0.666
0.0 8.3 15.5 103.7725 104 0.312
0.0 9.2 15.5 114.6225 115 0.345
W1 2.2 8.6 15.5 107.85 108 0.324
W3/W4 5.8 4.9 15.5 61.59625 62 0.186
W3 0.4 8.7 15.5 109.23125 110 0.33
W1 2.2 8.4 15.5 104.55625 105 0.315
W1 2.2 7.0 15.5 87.6225 88 0.264
W1 2.2 6.1 15.5 76.7725 77 0.231
W3 0.4 10.0 15.5 125.05375 126 0.378
W1 2.2 5.4 15.5 67.24 68 0.204
W1 2.2 8.4 15.5 104.55625 105 0.315
W1 2.2 16.4 15.5 205.2375 206 0.618
133.0 1670 5.604
3340 11.21

Window Window Area CHB Area Layers # of CHB ROUNDUP Vm


0 3.8 15.5 47.5 48 0.144
0 2.808 15.5 35.1 36 0.108
0 23.066 15.5 288.325 289 0.867
0 5.27 15.5 65.875 66 0.198
0 5.27 15.5 65.875 66 0.198
0 6.975 15.5 87.1875 88 0.264
0 14.477 15.5 180.9625 181 0.543
0 2.016 15.5 25.2 26 0.078
0 6.418 15.5 80.225 81 0.243
0 6.975 15.5 87.1875 88 0.264
0 14.477 15.5 180.9625 181 0.543
0 3.8 15.5 47.5 48 0.144
0 2.87 15.5 35.875 36 0.108
0 6.975 15.5 87.1875 88 0.264
0 50.034 15.5 625.425 626 1.878
0 47.926 15.5 599.075 600 1.8
0 30.507 15.5 381.3375 382 1.146
0 13.322 15.5 166.525 167 0.501
236.986 2962.325 2971 8.913
5942 17.83
Window Window Area CHB Area Layers # of CHB ROUNDUP Vm
0.0 34.8 14.5 435 435 1.305
W2 2.2 6.3 14.5 78.125 79 0.237
W3 0.4 8.0 14.5 99.475 100 0.3
W5 5.4 1.5 14.5 18.2325 19 0.057
W3 0.4 8.0 14.5 99.8375 100 0.3
W2 2.2 6.0 14.5 74.5 75 0.225
2.1 8.2 14.5 102.225 103 0.309
0.0 11.3 14.5 141.675 142 0.426
0.0 13.4 14.5 167.475 168 0.504
W2 2.2 13.4 14.5 167.2375 168 0.504
W3 0.4 8.6 14.5 107 107 0.321
W2 2.2 13.1 14.5 163.25 164 0.492

119.8 1660 4.98


1660 4.98

Window Window Area CHB Area Layers # of CHB ROUNDUP Vm


0 6.288 14.5 78.6 79 0.237
0 11.334 14.5 141.675 142 0.426
0 3.388 14.5 42.35 43 0.129
0 6.23 14.5 77.875 78 0.234
0 14.886 14.5 186.075 187 0.561
0 13.398 14.5 167.475 168 0.504
0 14.886 14.5 186.075 187 0.561
0 7.047 14.5 88.0875 89 0.267
0 6.288 14.5 78.6 79 0.237
0 6.288 14.5 78.6 79 0.237
0 5.099 14.5 63.7375 64 0.192
0 4.548 14.5 56.85 57 0.171
0 29.604 14.5 370.05 371 1.113
0 29.082 14.5 363.525 364 1.092
0 29.401 14.5 367.5125 368 1.104
0 3.17 14.5 39.625 40 0.12
0 27.98 14.5 349.75 350 1.05
0 3.17 14.5 39.625 40 0.12
222.087 2776.0875 2785 8.355
2785 8.355
Window Window Area CHB Area Layers # of CHB ROUNDUP Vm
0 11.4 14.5 143.125 144 0.432
0 13.3 14.5 166.75 167 0.501
0 16.8 14.5 209.8875 210 0.63
0 16.8 14.5 209.8875 210 0.63
58.4 731 2.193

TOTAL WIR

ce from ground line to top of 1st floor

ce from top of 1st floor to top of 2nd floor


of 2nd floor

EA OF CHB WALL
B Area = Wall Area - (nd x Ad) - (nw x Aw)
nd = number of doors = direct counting
nw = number od windows = direct counting

mple Solution for 1F EXT:


B Area = Wall Area - (nd x Ad) - (nw x Aw)
= 15.0 - (1 x3.15) - (2 x 0.6) = 10.6 sq. m
mber of CHB layers

rs = Hwall/0.2
Hwall = height of wall
0.2 = height of CHB in m

mple Solution for 1F EXT:


rs = Hwall/0.2 = 3/0.2 = 15 layers

mber of CHB

of CHB = CHB Area/(0.2 x 0.4)


CHB Area = area of CHB wall
0.2 = height of CHB in m
0.4 = length of CHB in m

mple Solution for 1F EXT:


of CHB = CHB Area/(0.2 x 0.4)
= 10.6/(0.2 x 0.4) = 132.5 (round up) ≈133 pcs

ume of mortar, Vm

= no. of CHB x 4 x 0.2 x 0.075 x 0.05


no. of CHB = number of CHB for wall
4 = 3 + (2 x 0.5) = number of voids per CHB
0.2 = height of CHB void in m
0.075 = length of CHB void in m
0.05 = width of CHB void in m

mple Solution for 1F EXT:


= no. of CHB x 4 x 0.2 x 0.075 x 0.05
133 x 4 x 0.2 x 0.075 x 0.05 = 0.4 cu.m
Table B-1. Tie Bars, Horizontal and Vertical Bars for the Wall
1F & 3F EXT. Height Length Hor. Hor. RoundUp Vert. Vert. RoundUp
1 3.1 6.39 5.167 6 10.6 11
2 3.1 5.02 5.167 6 8.4 9
3 3.1 2.68 5.167 6 4.5 5
4 3.1 2.96 5.167 6 4.9 5
5 3.1 3.48 5.167 6 5.8 6
6 3.1 5.32 5.167 6 8.9 9
7 3.1 2.94 5.167 6 4.9 5
8 3.1 3.40 5.167 6 5.7 6
9 3.1 2.96 5.167 6 4.9 5
10 3.1 2.68 5.167 6 4.5 5
11 3.1 3.95 5.167 6 6.6 7
12 3.1 2.43 5.167 6 4.1 5
13 3.1 3.40 5.167 6 5.7 6
14 3.1 6.69 5.167 6 11.2 12
SUBTOTAL 54.272

Table B-2. Tie Bars, Horizontal and Vertical Bars for the Wall
1F & 3F INT. Height Length Hor. Hor. RoundUp Vert. Vert. RoundUp
1a 3.1 1.7 5.167 6 2.8 3
1b 3.1 1.38 5.167 6 2.3 3
2 3.1 8.66 5.167 6 14.4 15
3a 3.1 1.7 5.167 6 2.8 3
3b 3.1 1.7 5.167 6 2.8 3
3c 3.1 2.25 5.167 6 3.8 4
3d 3.1 4.67 5.167 6 7.8 8
4a 3.1 1.26 5.167 6 2.1 3
4b 3.1 2.68 5.167 6 4.5 5
4c 3.1 2.25 5.167 6 3.8 4
4d 3.1 4.67 5.167 6 7.8 8
5a 3.1 1.7 5.167 6 2.8 3
5b 3.1 1.4 5.167 6 2.3 3
5c 3.1 2.25 5.17 6 3.8 4.0
6 3.1 16.14 5.17 6 26.9 27.0
7 3.1 15.46 5.17 6 25.8 26.0
8 3.1 11.67 5.167 6 19.5 20.0
9 3.1 5.72 5.167 6 9.5 10.0
SUBTOTAL 87.26
Table B-3. Tie Bars, Horizontal and Vertical Bars for the Wall
2F EXT. Height Length Hor. Hor. RoundUp Vert. Vert. RoundUp
1 2.9 12 4.833 5 20.0 20
2 2.9 2.9 4.833 5 4.8 5
3 2.9 3.52 4.833 5 5.9 6
4 2.9 2.37 4.833 5 4.0 4
5 2.9 3.53 4.833 5 5.9 6
6 2.9 2.8 4.833 5 4.7 5
7 2.9 2.82 4.833 5 4.7 5
8 2.9 4.56 4.833 5 7.6 8
9 2.9 4.62 4.833 5 7.7 8
10 2.9 6.01 4.833 5 10.0 11
11 2.9 3.2 4.833 5 5.3 6
12 2.9 5.9 4.833 5 9.8 10

SUBTOTAL 56.5

Table B-3. Tie Bars, Horizontal and Vertical Bars for the Wall
2F INT. Height Length Hor. Hor. RoundUp Vert. Vert. RoundUp
1a 2.9 2.82 4.833 5 4.7 5
1b 2.9 4.56 4.833 5 7.6 8
1c 2.9 1.82 4.833 5 3.0 4
1d 2.9 2.8 4.833 5 4.7 5
2a 2.9 5.64 4.833 5 9.4 10
2b 2.9 4.62 4.833 5 7.7 8
3a 2.9 5.64 4.833 5 9.4 10
3b 2.9 2.43 4.833 5 4.1 5
4a 2.9 2.82 4.833 5 4.7 5
4b 2.9 2.82 4.833 5 4.7 5
4c 2.9 2.41 4.833 5 4.0 5
4d 2.9 2.22 4.833 5 3.7 4
5 2.9 10.86 4.833 5 18.1 19
6 2.9 10.68 4.833 5 17.8 18
7a 2.9 10.79 4.833 5 18.0 18
7b 2.9 1.6 4.833 5 2.7 3
8a 2.9 10.3 4.833 5 17.2 18
8b 2.9 1.6 4.833 5 2.7 3
SUBTOTAL 86.43
Table B-3. Tie Bars, Horizontal and Vertical Bars for the Wall
ROOFDECK Height Length Hor. Hor. RoundUp Vert. Vert. RoundUp
1 2.9 4.6 4.833 5 7.7 8
2 2.9 4.6 4.833 5 7.7 8
3 2.9 5.79 4.833 5 9.7 10
4 2.9 5.79 4.833 5 9.7 10
SUBTOTAL 20.78

TOTAL NUMBER OF
1782 pcs.
10-MMΦ STEEL BARS

TOTAL WIRE LENGTH 1681.2 m G.I. wire


1 Kg = 53 m = 31.7207547 ≈ 32 Kg

Number of horizontal bars, hor

hor = Hwall/(0.2 x 3) = rounded up value


where: Hwall = height of the wall
0.2 = height of CHB
3 = number of layers per bar spacing

Sample Solution for 1F EXT:


hor = Hwall/(0.2 x 3) = 3.0/(0.2 x 3) ≈ 5

Number of vertical bars, vert


vert = Lwall/(0.6) = rounded up value
where: Lwall = length of the wall
0.6 = bar spacing on centers in m

Sample Solution for 1F EXT:


vert = Lwall/(0.6) = 5/0.6 = 9

Number of 0.3-m cut tie wire, n


n = hor x vert = no. of intersections

Sample Solution for 1F EXT:


n = 5 x 9 = 45

Wire length = n x 0.3


where: 0.3 = length of cut 10-mm dia. tie wire

Sample Solution for 1F EXT:


Wire length = n x 0.3 = 45 x 0.3 = 13.5 m

Number of horizontal bars for the given length, nh


nh = direct counting

Number of vertical bars for the given height, nv


nv = direct counting

Number of horizontal bars for all layers, nh*hor


nh*hor = nh x hor
Number of vertical bars for entire height, nv*vert
nv*vert = nv x vert

Sample Solution for 1F EXT:


nh*hor = nh x hor = 1 x 5 =5
nv*vert = nv x vert = 1 x 9 = 9
n Wire Length nh nh x Horizontal nv nv x Vertical
66 19.8 1 6 1 11
54 16.2 1 6 1 9
30 9 1 6 1 5
30 9 1 6 1 5
36 10.8 1 6 1 6
54 16.2 0.5 3 1 9
30 9 1 6 1 5
36 10.8 1 6 1 6
30 9 1 6 1 5
30 9 1 6 1 5
42 12.6 1 6 1 7
30 9 1 6 1 5
36 10.8 0.5 3 1 6
72 21.6 1 6 1 12
576 172.8 78 96
345.6 156 192

n Wire Length nh nh x Horizontal nv nv x Vertical


18 5.4 3 18 1 3
18 5.4 1 6 1 3
90 27.0 1 6 1 15
18 5.4 1 6 1 3
18 5.4 1 6 1 3
24 7.2 0.5 3 1 4
48 14.4 1 6 1 8
18 5.4 1 6 1 3
30 9.0 1 6 1 5
24 7.2 1 6 1 4
48 14.4 1 6 1 8
18 5.4 1 6 1 3
18 5.4 0.5 3 1 3
24 7.2 1 6 1 4
162 48.6 1 6 1 27
156 46.8 1 6 1 26
120 36.0 0.5 3 1 20
60 18.0 0.5 3 1 10
912 273.6 108 152
547.2 216 304
n Wire Length nh nh x Horizontal nv nv x Vertical
100 30.0 1 5 1 20
25 7.5 1 5 1 5
30 9.0 1 5 1 6
20 6.0 1 5 1 4
30 9.0 1 5 1 6
25 7.5 0.5 3 1 5
25 7.5 1 5 1 5
40 12.0 1 5 1 8
40 12.0 1 5 1 8
55 16.5 1 5 1 11
30 9.0 1 5 1 6
50 15.0 1 5 1 10

470 141.0 58 94
470 141.0 116 94

n Wire Length nh nh x Horizontal nv nv x Vertical


25 7.5 1 5 1 5
40 12.0 1 5 1 8
20 6.0 1 5 1 4
25 7.5 1 5 1 5
50 15.0 1 5 1 10
40 12.0 1 5 1 8
50 15.0 1 5 1 10
25 7.5 1 5 1 5
25 7.5 1 5 1 5
25 7.5 1 5 1 5
25 7.5 1 5 1 5
20 6.0 1 5 1 4
95 28.5 1 5 1 19
90 27.0 1 5 1 18
90 27.0 1 5 1 18
15 4.5 1 5 1 3
90 27.0 1 5 1 18
15 4.5 1 5 1 3
765 229.5 90 153
765 229.5 270 153
n Wire Length nh nh x Horizontal nv nv x Vertical
40 12.0 1 5 0.5 4
40 12.0 1 5 0.5 4
50 15.0 1 5 0.5 5
50 15.0 1 5 0.5 5
180 54.0 20 18
Estimate of Formworks

A. Column:
P = 2(a+b) + 0.20

Dimension: 300mm x 300mm (16 columns)


Height = 9.1 m
P= 1.4 m
A= 203.84 sq.m
# of Plywood = 70.78 say 71 pcs.

Wood Frame:
Refer to Table 5-1 for 2x2 Frame (6mm thick)
2106.57 bd.ft
Provide, 71 pcs. 1.20 x 2.40 plywood, 2107 board feet 2x2 lumber

B. Beam: Girder 3:
P = 2(d) + b + 0.10 P = 2(d) + b + 0.10

Girder 1: Girder 1:
Dimension: 400 mm x 500 mm (8 beams) Dimension: 400 mm x 500 mm
Length = 1.6 m Length =
P= 1.55 m P=
A= 19.84 sq.m A=
# of Plywood 6.89 say 7 pcs. # of Plywood

Wood Frame: Wood Frame:


Refer to Table 5-1 for 2x2 Frame (6mm thick) Refer to Table 5-1 for 2x2 Frame
196 bd.ft 280
Provide, 7 pcs. 1.20 x 2.40 plywood, 196 board feet 2x2 lumber Provide, 10 pcs. 1.20 x 2.40 plywo

Girder 2: Girder 4:
Dimension: 400mm x 500mm (4 beams) P = 2(d) + b + 0.10
Length = 5.79 m
P= 1.55 m Girder 1:
A= 35.898 sq.m Dimension: 400 mm x 500 mm
# of Plywood 12.46 say 13 pcs. Length =
P=
Wood Frame: A=
Refer to Table 5-1 for 2x2 Frame (6mm thick) # of Plywood
364 bd.ft
Provide, 13 pcs. 1.20 x 2.40 plywood, 364 board feet 2x2 lumber Wood Frame:
Refer to Table 5-1 for 2x2 Frame
C. Slab: 504
S1: (1 units) Provide, 18 pcs. 1.20 x 2.40 plywo
A= 24.192 sq.m
# of Plywood 8.40 say 9 pcs. S7: (1 units)
A=
Provide, 9 pcs. 4' x 8' Marine Plywood # of Plywood

C. Slab: Provide, 8 pcs. 4' x 8' Marine Plyw


S2: (1 units)
A= 31.266 sq.m S8: (1 units)
# of Plywood 10.86 say 11 pcs. A=
# of Plywood
Provide, 11 pcs. 4' x 8' Marine Plywood
Provide, 3 pcs. 4' x 8' Marine Plyw
S3: (1 units)
A= 20.608 sq.m S9: (1 units)
# of Plywood 7.16 say 8 pcs. A=
# of Plywood
Provide, 8 pcs. 4' x 8' Marine Plywood
Provide, 4 pcs. 4' x 8' Marine Plyw
S4: (1 units)
A= 26.634 sq.m S10: (2 units)
# of Plywood 9.25 say 10 pcs. A=
# of Plywood
Provide, 10 pcs. 4' x 8' Marine Plywood
Provide, 6 pcs. 4' x 8' Marine Plyw
S5: (1 units)
A= 22.4 sq.m S11: (2 units)
# of Plywood 7.78 say 8 pcs. A=
# of Plywood
Provide, 8 pcs. 4' x 8' Marine Plywood
Provide, 6 pcs. 4' x 8' Marine Plyw
S6: (1 units)
A= 28.95 sq.m
# of Plywood 10.05 say 11 pcs.

Provide, 11 pcs. 4' x 8' Marine Plywood

TOTAL:
1.20 x 2.40 plywood 138
4' x 8' Marine Plywood 80
2x2 lumber 3982.57
Girder 5:
2(d) + b + 0.10 P = 2(d) + b + 0.10

Girder 1:
ension: 400 mm x 500 mm (4 beams) Dimension: 400 mm x 500 mm
4.48 m Length = 1.74 m
1.55 m P= 1.55 m
27.776 sq.m A= 10.788 sq.m
9.64 say 10 pcs. # of Plywood 3.75 say

Wood Frame:
er to Table 5-1 for 2x2 Frame (6mm thick) Refer to Table 5-1 for 2x2 Frame
bd.ft 112 bd.ft
vide, 10 pcs. 1.20 x 2.40 plywood, 280 board feet 2x2 lumber Provide,4 pcs. 1.20 x 2.40 plywood, 952 board feet 2x

Girder
2(d) + b + 0.10 P = 2(d) + b + 0.10

Girder 1:
ension: 400 mm x 500 mm (6 beams) Dimension: 400 mm x 500 mm
5.4 m Length = 4.6 m
1.55 m P= 1.55 m
50.22 sq.m A= 42.78 sq.m
17.44 say 18 pcs. # of Plywood 14.85 say

Wood Frame:
er to Table 5-1 for 2x2 Frame (6mm thick) Refer to Table 5-1 for 2x2 Frame
bd.ft 420 bd.ft
vide, 18 pcs. 1.20 x 2.40 plywood, 504 board feet 2x2 lumber Provide, 15 pcs. 1.20 x 2.40 plywood, 420 board feet

9.396 sq.m
3.26 say 4 pcs.

vide, 8 pcs. 4' x 8' Marine Plywood

8.004 sq.m
2.78 say 3 pcs.

vide, 3 pcs. 4' x 8' Marine Plywood

8.7 sq.m
3.02 say 4 pcs.

vide, 4 pcs. 4' x 8' Marine Plywood

17.28 sq.m
6.00 say 6 pcs.

vide, 6 pcs. 4' x 8' Marine Plywood

16 sq.m
5.56 say 6 pcs.

vide, 6 pcs. 4' x 8' Marine Plywood


P = 2(d) + b + 0.10

Girder 1:
(4 beams) Dimension: 400 mm x 500 mm (6 beams)
Length = 5m
P= 1.55 m
A= 46.5 sq.m
4 pcs. # of Plywood 16.15 say 17 pcs.

Wood Frame:
(6mm thick) Refer to Table 5-1 for 2x2 Frame (6mm thick)
476 bd.ft
0 plywood, 952 board feet 2x2 lumber Provide, 17 pcs. 1.20 x 2.40 plywood, 952 board feet 2x2 lumber
(6 beams)

15 pcs.

(6mm thick)

40 plywood, 420 board feet 2x2 lumber


rd feet 2x2 lumber
Estimate of Scaffoldings

A. Column:
Total Length = 157.2 m
Refer to Table 5-3. Using 2" x 3" vertical support, 1100.4 bd.ft 2" x 3" x 14"
Refer to Table 5-3. Using 2" x 2" horizontal support, 3301.2 bd.ft 2" x 2" lumber
Refer to Table 5-3. Using 2" x 2" diagonal braces, 1839.24 bd.ft 2" x 2" lumber

B. Beam:
Total Length = 561.74 m
Refer to Table 5-3. Using 2" x 3" vertical support, 3370.44 bd.ft 2" x 3" x 14"
Refer to Table 5-3. Using 2" x 2" horizontal support, 2640.178 bd.ft 2" x 2" lumber

C. Slab:
S1: (7 units)
A= 891.084 sq.m
Refer to Table 5-3. Using 2" x 3" support, 8108.864 bd.ft 2" x 3" x 14"
Work Ave. Rate Unit Quantity Unit Man Hours
Temporary Fence 64.00
Warehouse 48.00
Clearing & Lay-Outing
Filling & Compaction 0.06 MH/C.M. 65.55 C.M. 3.93

Column Footing
Excavation 8 MH/C.M. 126.6 C.M. 1012.80
Gravel Bedding 2.07 MH/C.M. 8.5 C.M. 17.60

Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 2708.42 Kg 893.78
Matting of Bars & Tie Wires 0.33 MH/Kg 2708.42 Kg 893.78
Installation of Matt Bars 0.53 MH/Kg 2708.42 Kg 1435.46
Mixing of Concrete 1.8 MH/C.M. 77.4 C.M. 139.32
Pouring of Concrete 5 MH/C.M. 77.4 C.M. 387.00
Backfilling 12 MH/C.M. 96.32625 C.M. 1155.92

Column
1. 1st Floor

Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 2140.7 Kg 706.43
Installation of Reinforcement Bars 0.07 MH/Kg 2140.7 Kg 149.85
Fabrication of Formworks 1.08 MH/SQ.M 74.8 SQ.M 80.78
Installation of Formworks 2.35 MH/SQ.M 74.8 SQ.M 175.78
Mixing of Concrete 1.8 MH/C.M. 4.8 C.M. 8.64
Pouring of Concrete 5 MH/C.M. 4.8 C.M. 24.00
Removal of Formworks 0.85 MH/SQ.M 74.8 SQ.M 63.58

2. 2nd Floor

Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 1539.43 Kg 508.01
Installation of Reinforcement Bars 0.07 MH/Kg 1539.43 Kg 107.76
Fabrication of Formworks 1.08 MH/SQ.M 74.8 SQ.M 80.78
Installation of Formworks 2.35 MH/SQ.M 74.8 SQ.M 175.78
Mixing of Concrete 1.8 MH/C.M. 12.7 C.M. 22.86
Pouring of Concrete 5 MH/C.M. 12.7 C.M. 63.50
Removal of Formworks 0.85 MH/SQ.M 74.8 SQ.M 63.58

3. 3rd Floor

Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 1539.43 Kg 508.01
Installation of Reinforcement Bars 0.07 MH/Kg 1539.43 Kg 107.76
Fabrication of Formworks 1.08 MH/SQ.M 74.8 SQ.M 80.78
Installation of Formworks 2.35 MH/SQ.M 74.8 SQ.M 175.78
Mixing of Concrete 1.8 MH/C.M. 12.7 C.M. 22.86
Pouring of Concrete 5 MH/C.M. 12.7 C.M. 63.50
Removal of Formworks 0.85 MH/SQ.M 74.8 SQ.M 63.58

4. 4th Floor

Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 1539.43 Kg 508.01
Installation of Reinforcement Bars 0.07 MH/Kg 1539.43 Kg 107.76
Fabrication of Formworks 1.08 MH/SQ.M 74.8 SQ.M 80.78
Installation of Formworks 2.35 MH/SQ.M 74.8 SQ.M 175.78
Mixing of Concrete 1.8 MH/C.M. 12.7 C.M. 22.86
Pouring of Concrete 5 MH/C.M. 12.7 C.M. 63.50
Removal of Formworks 0.85 MH/SQ.M 74.8 SQ.M 63.58

Tie Beam
Excavation 8 MH/C.M. 16.5 C.M. 132.00
Gravel Bedding 2.07 MH/C.M. 4.65 C.M. 9.63

Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 1966.21 Kg 648.85
Installation of Bars 0.33 MH/Kg 1966.21 Kg 648.85
Fabrication of Formworks 1.08 MH/SQ.M 132 SQ.M. 142.56
Installation of Formworks 2.35 MH/SQ.M 132 SQ.M. 310.20
Mixing of Concrete 1.8 MH/C.M. 9.4 C.M. 16.92
Pouring of Concrete 5 MH/C.M. 9.4 C.M. 47.00
Removal of Formworks 0.85 MH/SQ.M 132 SQ.M. 112.20

Wall Footing
Excavation 8 MH/C.M. 28.01 C.M. 224.08
Gravel Bedding 2.07 MH/C.M. 2.33 C.M. 4.82

Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 302.88 Kg 99.95
Matting of Bars & Tie Wires 0.33 MH/Kg 302.88 Kg 99.95
Installation of Matt Bars 0.53 MH/Kg 302.88 Kg 160.53
Mixing of Concrete 1.8 MH/C.M. 3.7 C.M. 6.66
Pouring of Concrete 5 MH/C.M. 3.7 C.M. 18.50
Backfilling 12 MH/C.M. 9.34 C.M. 112.08

Wall
1. 1st Floor
a. Installing vertical and horizontal bars 0.07 MH/Kg 1509.6 Kg 105.67
b. Laying of CHB and pouring of mortar 1.33 MH/SQ.M 361.26 SQ.M 480.48
2. 2nd Floor
a. Installing vertical and horizontal bars 0.07 MH/Kg 1542.9 Kg 108.00
b. Laying of CHB and pouring of mortar 1.33 MH/SQ.M 367.445 SQ.M 488.70

3. 3rd Floor
a. Installing vertical and horizontal bars 0.07 MH/Kg 1542.9 Kg 108.00
b. Laying of CHB and pouring of mortar 1.33 MH/SQ.M 367.445 SQ.M 488.70

4. 4th Floor
a. Installing vertical and horizontal bars 0.07 MH/Kg 1542.9 Kg 108.00
b. Laying of CHB and pouring of mortar 1.33 MH/SQ.M 367.445 SQ.M 488.70

5. Parapet Wall
a. Installing vertical and horizontal bars 0.07 MH/Kg 358.9 Kg 25.12
b. Laying of CHB and pouring of mortar 1.33 MH/SQ.M 90.4 SQ.M 120.23

Beam
1. 2nd Floor

Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 2150.9 Kg 709.80
Installation of Bars, Ties, & Tire Wires 0.08 MH/Kg 2150.9 Kg 172.07
Fabrication of Formworks 1.08 MH/SQ.M 163.5 SQ.M 176.58
Installation of Formworks 3.08 MH/SQ.M 163.5 SQ.M 503.58
Mixing of Concrete 1.8 MH/C.M. 11.5 C.M. 20.70
Pouring of Concrete 5 MH/C.M. 11.5 C.M. 57.50
Removal of Formworks 0.85 MH/SQ.M 163.5 C.M. 138.98

2. 3rd Floor

Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 2150.9 Kg 709.80
Installation of Bars, Ties, & Tire Wires 0.08 MH/Kg 2150.9 Kg 172.07
Fabrication of Formworks 1.08 MH/SQ.M 163.5 SQ.M 176.58
Installation of Formworks 3.08 MH/SQ.M 163.5 SQ.M 503.58
Mixing of Concrete 1.8 MH/C.M. 11.5 C.M. 20.70
Pouring of Concrete 5 MH/C.M. 11.5 C.M. 57.50
Removal of Formworks 0.85 MH/SQ.M 163.5 C.M. 138.98

3. 4th Floor

Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 2150.9 Kg 709.80
Installation of Bars, Ties, & Tire Wires 0.08 MH/Kg 2150.9 Kg 172.07
Fabrication of Formworks 1.08 MH/SQ.M 163.5 SQ.M 176.58
Installation of Formworks 3.08 MH/SQ.M 163.5 SQ.M 503.58
Mixing of Concrete 1.8 MH/C.M. 11.5 C.M. 20.70
Pouring of Concrete 5 MH/C.M. 11.5 C.M. 57.50
Removal of Formworks 0.85 MH/SQ.M 163.5 C.M. 138.98

4. Roof Beam

Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 1797 Kg 593.01
Installation of Bars, Ties, & Tire Wires 0.08 MH/Kg 1797 Kg 143.76
Fabrication of Formworks 1.08 MH/SQ.M 163.5 SQ.M 176.58
Installation of Formworks 3.08 MH/SQ.M 163.5 SQ.M 503.58
Mixing of Concrete 1.8 MH/C.M. 11.5 C.M. 20.70
Pouring of Concrete 5 MH/C.M. 11.5 C.M. 57.50
Removal of Formworks 0.85 MH/SQ.M 163.5 C.M. 138.98

Slab
1. Slab on Fill

Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 162.8 Kg 53.72
Installation of Reinforcement Bars 0.08 MH/Kg 162.8 Kg 13.02
Mixing of Concrete 1.8 MH/C.M. 25.3 C.M. 45.54
Pouring of Concrete 5 MH/C.M. 25.3 C.M. 126.50

2. 2nd Floor Slab

Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 2416 Kg 797.28
Installation of Reinforcement Bars 0.08 MH/Kg 2416 Kg 193.28
Fabrication of Formworks 1.08 MH/SQ.M 74.6 SQ.M 80.57
Installation of Formworks 3.08 MH/SQ.M 74.6 SQ.M 229.77
Mixing of Concrete 1.8 MH/C.M. 25.3 C.M. 45.54
Pouring of Concrete 5 MH/C.M. 25.3 C.M. 126.50
Removal of Formworks 0.85 MH/SQ.M 74.6 SQ.M 63.41

3. 3rd Floor Slab

Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 2416 Kg 797.28
Installation of Reinforcement Bars 0.08 MH/Kg 2416 Kg 193.28
Fabrication of Formworks 1.08 MH/SQ.M 74.6 SQ.M 80.57
Installation of Formworks 3.08 MH/SQ.M 74.6 SQ.M 229.77
Mixing of Concrete 1.8 MH/C.M. 25.3 C.M. 45.54
Pouring of Concrete 5 MH/C.M. 25.3 C.M. 126.50
Removal of Formworks 0.85 MH/SQ.M 74.6 SQ.M 63.41
4. 4th Floor Slab

Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 2416 Kg 797.28
Installation of Reinforcement Bars 0.08 MH/Kg 2416 Kg 193.28
Fabrication of Formworks 1.08 MH/SQ.M 74.6 SQ.M 80.57
Installation of Formworks 3.08 MH/SQ.M 74.6 SQ.M 229.77
Mixing of Concrete 1.8 MH/C.M. 25.3 C.M. 45.54
Pouring of Concrete 5 MH/C.M. 25.3 C.M. 126.50
Removal of Formworks 0.85 MH/SQ.M 74.6 SQ.M 63.41

5. Roof Slab

Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 2975 Kg 981.75
Installation of Reinforcement Bars 0.08 MH/Kg 2975 Kg 238.00
Fabrication of Formworks 1.08 MH/SQ.M 104.38 SQ.M 112.73
Installation of Formworks 3.08 MH/SQ.M 104.38 SQ.M 321.49
Mixing of Concrete 1.8 MH/C.M. 25.3 C.M. 45.54
Pouring of Concrete 5 MH/C.M. 25.3 C.M. 126.50
Removal of Formworks 0.85 MH/SQ.M 104.38 SQ.M 88.72

Main Stairs

Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 421.1 Kg 138.96
Installation of Reinforcement Bars 0.08 MH/Kg 421.1 Kg 33.69
Fabrication of Formworks 1.08 MH/SQ.M 4.2 SQ.M 4.54
Installation of Formworks 3.08 MH/SQ.M 4.2 SQ.M 12.94
Mixing of Concrete 1.8 MH/C.M. 9.5 C.M. 17.10
Pouring of Concrete 5 MH/C.M. 9.5 C.M. 47.50
Removal of Formworks 0.85 MH/SQ.M 4.2 SQ.M 3.57
Hours/Day Man Days No. of Workers No. of Days Total No. of Days
8 8.0 4 2.0
8 6.0 3 2.0
8 30.0 10 3.0
8 0.5 15 0.03 7.0

8 126.6 20 6.3
8 2.2 10 0.2

8 111.7 20 5.6
8 111.7 20 5.6
8 179.4 20 9.0
8 17.4 10 1.7
8 48.4 10 4.8
8 144.5 20 7.2 40.5

8 88.3 20 4.4
8 18.7 20 0.9
8 10.1 10 1.0
8 22.0 10 2.2
8 1.1 10 0.1
8 3.0 10 0.3
8 7.9 10 0.8 9.8

8 63.5 20 3.2
8 13.5 20 0.7
8 10.1 10 1.0
8 22.0 10 2.2
8 2.9 10 0.3
8 7.9 10 0.8
8 7.9 10 0.8 8.9

8 63.5 20 3.2
8 13.5 20 0.7
8 10.1 10 1.0
8 22.0 10 2.2
8 2.9 10 0.3
8 7.9 10 0.8
8 7.9 10 0.8 8.9

8 63.5 20 3.2
8 13.5 20 0.7
8 10.1 10 1.0
8 22.0 10 2.2
8 2.9 10 0.3
8 7.9 10 0.8
8 7.9 10 0.8 8.9

8 16.5 20 0.8
8 1.2 10 0.1

8 81.1 20 4.1
8 81.1 20 4.1
8 17.8 10 1.8
8 38.8 10 3.9
8 2.1 10 0.2
8 5.9 10 0.6
8 14.0 10 1.4 16.9

8 28.0 20 1.4
8 0.6 10 0.1

8 12.5 15 0.8
8 12.5 15 0.8
8 20.1 15 1.3
8 0.8 10 0.1
8 2.3 10 0.2
8 14.0 20 0.7 5.5

8 13.2 15 0.9
8 60.1 10 6.0 6.9
8 13.5 15 0.9
8 61.1 10 6.1 7.0

8 13.5 15 0.9
8 61.1 10 6.1 7.0

8 13.5 15 0.9
8 61.1 10 6.1 7.0

8 3.1 15 0.2
8 15.0 10 1.5 1.7

8 88.7 15 5.9
8 21.5 15 1.4
8 22.1 10 2.2
8 62.9 10 6.3
8 2.6 10 0.3
8 7.2 10 0.7
8 17.4 10 1.7 18.6

8 88.7 15 5.9
8 21.5 15 1.4
8 22.1 10 2.2
8 62.9 10 6.3
8 2.6 10 0.3
8 7.2 10 0.7
8 17.4 10 1.7 18.6

8 88.7 15 5.9
8 21.5 15 1.4
8 22.1 10 2.2
8 62.9 10 6.3
8 2.6 10 0.3
8 7.2 10 0.7
8 17.4 10 1.7 18.6

8 74.1 15 4.9
8 18.0 15 1.2
8 22.1 10 2.2
8 62.9 10 6.3
8 2.6 10 0.3
8 7.2 10 0.7
8 17.4 10 1.7 17.4

8 6.7 15 0.4
8 1.6 15 0.1
8 5.7 15 0.4
8 15.8 15 1.1 2.0

8 99.7 15 6.6
8 24.2 15 1.6
8 10.1 10 1.0
8 28.7 10 2.9
8 5.7 15 0.4
8 15.8 15 1.1
8 7.9 10 0.8 14.4

8 99.7 15 6.6
8 24.2 15 1.6
8 10.1 10 1.0
8 28.7 10 2.9
8 5.7 15 0.4
8 15.8 15 1.1
8 7.9 10 0.8 14.4
8 99.7 15 6.6
8 24.2 15 1.6
8 10.1 10 1.0
8 28.7 10 2.9
8 5.7 15 0.4
8 15.8 15 1.1
8 7.9 10 0.8 14.4

8 122.7 15 8.2
8 29.8 15 2.0
8 14.1 10 1.4
8 40.2 10 4.0
8 5.7 15 0.4
8 15.8 15 1.1
8 11.1 10 1.1 18.1

8 17.4 15 1.2
8 4.2 15 0.3
8 0.6 10 0.1
8 1.6 10 0.2
8 2.1 10 0.2
8 5.9 10 0.6
8 0.4 10 0.04 2.5
Total No. of Weeks

1.17

6.75

1.63

1.49
1.49

1.49

2.82

0.91

1.15
1.17

1.17

1.17

0.29

3.09

3.09
3.09

2.89

0.33

2.39

2.39
2.39

3.02

0.42

You might also like