ESTIMATES AND MAN HOURS AutosaVED
ESTIMATES AND MAN HOURS AutosaVED
# of bars = 50 bars - 16 mm Φ
Total = 150 bars - 16 mm Φ
# of bars = 14 bars - 16 mm Φ
Total = 28 bars - 16 mm Φ
For C1:
(Rebars)
Total Height Ground Floor to 2nd Floor = 3.1 m
Bend = 0.2 m
Splice = 0.6 m
From footing to half of 1st flr.
(w/ splicing) 3.3 m
Half of 1st flr. to Half of 2nd flr.
(w/ splicing) 4.4 m
Half of 2nd flr. to 4th flr. (w/
splicing) 7.5 m
Columns:
(Stirrups)
For C2:
(Rebars)
Total Height 2nd Floor to Roof Deck = 2.9 m
Bend = 0.2 m
Splice = 0.6 m
From footing to half of 1st flr.
(w/ splicing) 3.3 m
Half of 1st flr. to Half of 2nd
flr. (w/ splicing) 4.4 m
Half of 2nd flr. to 4th flr. (w/
splicing) 7.5 m
Columns:
(Tie Wires)
Kg
ties
Kg
ties
Kg
ties
Kg
Estimate of Stair Columns
Stair Column
(Concreting)
Dimensions:
b= 250 mm 0.25 m
h= 250 mm 0.25 m
L= 3000 mm 3m
Vol. = 0.1875 cu.m
Total Volume = 1.5 cu.m
Stair Column
(Rebars)
Total Height Ground Floor to 4th Floor = 15.9 m
Bend = 0.2 m
Splice = footing to half of 1st flr. (w/ 0.6 m
From
Half of 1st flr.splicing)
to Half of 2nd flr. (w/ 4.2 m
splicing) 4.4 m
Half of 2nd flr. to 4th flr. (w/ splicing) 7.5 m
Stair Column
(Tie Wires)
L= 3000 mm
5 bars x 22 ties = 88 intersections x 8 columns =
2816 ties
22 Kg
Estimate of Beams
Column-Tie Beam
(Concreting)
b= 400 mm 0.4
h= 500 mm 0.5
Column-Tie Beam
(Rebars)
TB1-1, L = 4.48 m, 4 beams
Using 6m length of steel bar
Total (2F-4F) :
Cement: 765 Bags
Sand: 45 cu.m
Gravel: 87 cu.m
2nd Flr to 4th Flr
(Rebars)
G1, L = 1.6m, 8 beams
Using 6m length of steel bar
8 bars x 4 beams =
@ Support: 2 bars 32 bars - 16 mm Φ
@ Midspan: 2 bars
9 bars x 4 beams =
= 1.93 m
Using 6m length of steel bar
6/1.33 = 3.10880829015544 say
= 1.93 m
Using 6m length of steel bar
6/1.33 = 3.10880829015544 say
bars - 10 mm Φ
Therefore, 176 m
= 2 Stirrups
= 25 Stirrups
Total Kg of Tie Wires = 177
25
For G5: (6 Beams)
9 bars - 10 mm Φ
Length of Stirrups = (0.50-0.04-0.04)(2) + (0.4-0.04-0.04)(2) + (5x0.010
bars - 10 mm Φ (0.10x2) =
= 1.93 m
L= 1740 mm Using 6m length of steel bar
4-0.04)(2) + (5x0.010x5) +
2) =
6/1.33 = 3.10880829015544 say
(0.50-0.04-0.04)(2)
+ (0.4-0.04-0.04)(2)
+ (5x0.010x5) +
12 bars - 10 mm Φ Length of Stirrups = (0.10x2) =
bars - 10 mm Φ
= 1.93 m
Using 6m length of steel bar
bars - 10 mm Φ 6/1.33 = 3.10880829015544 say
bars - 10 mm Φ
bars - 10 mm Φ 1 @ 60mm rest @ 220mm
1-60mm x 2 = 120 mm
17220mm =
5000mm - 120mm 4880
28.7058823529412 say
Total # of Stirrups = 30 ties
# of Bars = 10 say
8 bars x 26 beams = 60
Column-Tie Beam
(Tie Wires)
Therefore, 211.2 m
= 2 Stirrups
= 8 Stirrups For G5: (4 Beams)
7 bars x 10 ties = 70
26
Therefore, 112 m
10 bars - 10 mm Φ
bars - 10 mm Φ Total Kg of Tie Wires = 25
L= 5000 mm
0.04-0.04)(2) + (5x0.010x5) + Length, m Number of Beams Volume, cu.m
0x2) = 1.6 8 2.56
4.48 4 3.584
1.74 4 1.392
3 5.79 4 4.632
5.4 6 6.48
4.6 4 3.68
= 2 Stirrups 5 6 6
= 8 Stirrups Total 28.328
28
10 bars - 10 mm Φ
bars - 10 mm Φ
= 15.69811 ≈ 16 Kg Therefore,
= 8.150943 ≈ 9 Kg Therefore,
L= 1740 mm
intersections x 5 beams = 330 ties
= 2.490566 ≈ 3 Kg
L= 5790 mm
intersections x 5 beams = 1050 ties
= 7.924528 ≈ 8 Kg
L= 5400 mm
intersections x 5 beams = 440 ties
= 3.320755 ≈ 4 Kg
Kg
L= 5400 mm
0.04-0.04)(2) + (5x0.010x5) +
0x2) =
= 2 Stirrups
= 31 Stirrups
31
11 bars - 10 mm Φ
bars - 10 mm Φ
L= 4600 mm
= 2 Stirrups
= 26 Stirrups
26
10 bars - 10 mm Φ
bars - 10 mm Φ
L= 5000 mm
= 2 Stirrups
= 28 Stirrups
28
10 bars - 10 mm Φ
bars - 10 mm Φ
L= 5000 mm
intersections x 6 beams = 540 ties
= 4.075472 ≈ 5 Kg
L= 4480 mm
intersections x 4 beams = 864 ties
= 6.520755 ≈ 7 Kg
L= 1740 mm
intersections x 5 beams = 352 ties
= 2.656604 ≈ 3 Kg
L= 5790 mm
intersections x 5 beams = 288 ties
= 2.173585 ≈ 3 Kg
L= 5400 mm
intersections x 5 beams = 528 ties
= 3.984906 ≈ 4 Kg
L= 4600 mm
intersections x 5 beams = 280 ties
= 2.113208 ≈ 3 Kg
Kg
G6: (4 Beams) L= 4600 mm
rs x 28 ties = 196 intersections x 5 beams = 980 ties
392 m = 7.396226 ≈ 8 Kg
540 m = 10.18868 ≈ 11 Kg
Estimate of Stair Beam
Stair Beam
(Concreting)
STB-1
b= 200 mm 0.2 m
h= 350 mm 0.35 m
Total 0.546
Stair Beam
(Rebars)
L = 2.6m, 4 beams
Using 6m length of steel bar
Intermediate Beam
(Concreting)
Intermediate Beam
b= 200 mm 0.2 m
h= 350 mm 0.35 m
Total 3.15
Intermediate Beam
(Rebars)
L = 2.3m, 6 beams
Using 6m length of steel bar
L = 2.8m, 4 beams
Using 6m length of steel bar
L = 5m, 4 beams
Using 6m length of steel bar
Stair Beam
(Stirrups)
L= 2600 mm
Length of Stirrups = (0.20-0.04-0.04)(2) + (0.35-0.04-0.04)(2) +
(5x0.010x5) + (0.10x2) =
= 1.23 m
Using 6m length of steel bar
6/1.23 = 4.87804878048781 say 4
e Beam
Intermediate Beam
(Stirrups)
L= 2300 mm
Length of Stirrups = (0.20-0.04-0.04)(2) + (0.40-0.04-0.04)(2) +
(5x0.010x5) + (0.10x2) =
= 1.33 m
Using 6m length of steel bar
6/1.33 = 4.51127819548872 say 4
Intermediate Beam
(Tie Wires)
L= 2300 mm
5 bars x 20 ties = 100 intersections x 3 beams = 300 ties
Table A-1. Legths and Areas to obtain the number of CHB and Volume of Mortars for Walls
1F & 3F EXT. Height Length Wall Area # of Doors Door Door Area # of Windows
1 3.1 6.39 19.7935 0 0 0
2 3.1 5.02 15.562 1 D4 3.78 0
3 3.1 2.68 8.3018 0 0 0
4 3.1 2.96 9.1698 0 0 0
5 3.1 3.48 10.788 0 0 1
6 3.1 5.32 16.4765 0 0 2
7 3.1 2.94 9.0985 0 0 1
8 3.1 3.40 10.5245 0 0 1
9 3.1 2.96 9.1698 0 0 1
10 3.1 2.68 8.3018 0 0 1
11 3.1 3.95 12.2543 1 D2 1.89 1
12 3.1 2.43 7.5392 0 0 1
13 3.1 3.40 10.5245 0 0 1
14 3.1 6.69 20.739 0 0 2
SUBTOTAL 54.272
Table A-2. Legths and Areas to obtain the number of CHB and Volume of Mortars for Walls
1F & 3F INT. Height Length Wall Area # of Doors Door Door Area # of Windows
1a 3.1 1.7 5.27 1 D3 1.47 0
1b 3.1 1.38 4.278 1 D3 1.47 0
2 3.1 8.66 26.846 2 D2 1.89 0
3a 3.1 1.7 5.27 0 0 0
3b 3.1 1.7 5.27 0 0 0
3c 3.1 2.25 6.975 0 0 0
3d 3.1 4.67 14.477 0 0 0
4a 3.1 1.26 3.906 1 D2 1.89 0
4b 3.1 2.68 8.308 1 D2 1.89 0
4c 3.1 2.25 6.975 0 0 0
4d 3.1 4.67 14.477 0 0 0
5a 3.1 1.7 5.27 1 D3 1.47 0
5b 3.1 1.4 4.34 1 D3 1.47 0
5c 3.1 2.25 6.975 0 0 0
6 3.1 16.14 50.034 0 0 0
7 3.1 15.46 47.926 0 0 0
8 3.1 11.67 36.177 3 D2 1.89 0
9 3.1 5.72 17.732 3 D3 1.47 0
SUBTOTAL 87.26
Table A-3. Legths and Areas to obtain the number of CHB and Volume of Mortars for Walls
2F EXT. Height Length Wall Area # of Doors Door Door Area # of Windows
1 2.9 12 34.8 0 0 0
2 2.9 2.9 8.41 0 0 1
3 2.9 3.52 10.208 1 D2 1.89 1
4 2.9 2.37 6.873 0 0 1
5 2.9 3.53 10.237 1 D2 1.89 1
6 2.9 2.8 8.12 0 0 1
7 2.9 2.82 8.178 0 0 0
8 2.9 4.56 13.224 1 D2 1.89 0
9 2.9 4.62 13.398 0 0 0
10 2.9 6.01 17.429 1 D2 1.89 1
11 2.9 3.2 9.28 0 0 2
12 2.9 5.9 17.11 1 D2 1.89 1
13
SUBTOTAL 54.23
Table A-4. Legths and Areas to obtain the number of CHB and Volume of Mortars for Walls
2F INT. Height Length Wall Area # of Doors Door Door Area # of Windows
1a 2.9 2.82 8.178 1 D2 1.89 0
1b 2.9 4.56 13.224 1 D2 1.89 0
1c 2.9 1.82 5.278 1 D2 1.89 0
1d 2.9 2.8 8.12 1 D2 1.89 0
2a 2.9 5.64 16.356 1 D3 1.47 0
2b 2.9 4.62 13.398 0 0 0
3a 2.9 5.64 16.356 1 D3 1.47 0
3b 2.9 2.43 7.047 0 0 0
4a 2.9 2.82 8.178 1 D2 1.89 0
4b 2.9 2.82 8.178 1 D2 1.89 0
4c 2.9 2.41 6.989 1 D2 1.89 0
4d 2.9 2.22 6.438 1 D2 1.89 0
5 2.9 10.86 31.494 1 D2 1.89 0
6 2.9 10.68 30.972 1 D2 1.89 0
7a 2.9 10.79 31.291 1 D2 1.89 0
7b 2.9 1.6 4.64 1 D3 1.47 0
8a 2.9 10.3 29.87 1 D2 1.89 0
8b 2.9 1.6 4.64 1 D3 1.47 0
SUBTOTAL 86.43
Table A-5. Legths and Areas to obtain the number of CHB and Volume of Mortars for Walls
ROOFDECK Height Length Wall Area # of Doors Door Door Area # of Windows
1 2.9 4.6 13.34 1 D2 1.89 0
2 2.9 4.6 13.34 0 0 0
3 2.9 5.79 16.791 0 0 0
4 2.9 5.79 16.791 0 0 0
SUBTOTAL 20.78
TOTAL NUMBER
OF HOLLOW 14458 pcs.
BLOCKS
Legend: 1F EXT - walls partly or entirely exposed to the surroundings on one face from ground line to to
1F INT - walls inside the structure from the ground line to the top of first floor
2F EXT - walls partly or entirely exposed to the surroundings on one face from top of 1st floor t
2F INT - walls inside the structure from the top of 1st floor to the top of 2nd floor
ROOFDECK - walls present on the roof deck
AREA OF THE WALL w/o doors & windows yet AREA OF CHB WALL
CHB Area = Wall Area - (n
Wall Area = Hwall x Lwall where:
*Since cut hollow blocks may be broken, thus Number of CHB layers
useless, it is safer to take the distance on the
centers of end columns on each side as the layers = Hwall/0.2
length of the wall. where:
Sample Solution:
Ad = area of door = L x h = 1.5 x 2.1 = 3.15 sq. m
Aw = area of window = L x h = 1 x 5 = 5.0 sq. m
Sample Solution for 1F EX
where: L = length of door or window Vm = no. of CHB x 4 x 0.2 x
h = height of door or window =
B and Reinforcements
TOTAL WIR
EA OF CHB WALL
B Area = Wall Area - (nd x Ad) - (nw x Aw)
nd = number of doors = direct counting
nw = number od windows = direct counting
rs = Hwall/0.2
Hwall = height of wall
0.2 = height of CHB in m
mber of CHB
ume of mortar, Vm
Table B-2. Tie Bars, Horizontal and Vertical Bars for the Wall
1F & 3F INT. Height Length Hor. Hor. RoundUp Vert. Vert. RoundUp
1a 3.1 1.7 5.167 6 2.8 3
1b 3.1 1.38 5.167 6 2.3 3
2 3.1 8.66 5.167 6 14.4 15
3a 3.1 1.7 5.167 6 2.8 3
3b 3.1 1.7 5.167 6 2.8 3
3c 3.1 2.25 5.167 6 3.8 4
3d 3.1 4.67 5.167 6 7.8 8
4a 3.1 1.26 5.167 6 2.1 3
4b 3.1 2.68 5.167 6 4.5 5
4c 3.1 2.25 5.167 6 3.8 4
4d 3.1 4.67 5.167 6 7.8 8
5a 3.1 1.7 5.167 6 2.8 3
5b 3.1 1.4 5.167 6 2.3 3
5c 3.1 2.25 5.17 6 3.8 4.0
6 3.1 16.14 5.17 6 26.9 27.0
7 3.1 15.46 5.17 6 25.8 26.0
8 3.1 11.67 5.167 6 19.5 20.0
9 3.1 5.72 5.167 6 9.5 10.0
SUBTOTAL 87.26
Table B-3. Tie Bars, Horizontal and Vertical Bars for the Wall
2F EXT. Height Length Hor. Hor. RoundUp Vert. Vert. RoundUp
1 2.9 12 4.833 5 20.0 20
2 2.9 2.9 4.833 5 4.8 5
3 2.9 3.52 4.833 5 5.9 6
4 2.9 2.37 4.833 5 4.0 4
5 2.9 3.53 4.833 5 5.9 6
6 2.9 2.8 4.833 5 4.7 5
7 2.9 2.82 4.833 5 4.7 5
8 2.9 4.56 4.833 5 7.6 8
9 2.9 4.62 4.833 5 7.7 8
10 2.9 6.01 4.833 5 10.0 11
11 2.9 3.2 4.833 5 5.3 6
12 2.9 5.9 4.833 5 9.8 10
SUBTOTAL 56.5
Table B-3. Tie Bars, Horizontal and Vertical Bars for the Wall
2F INT. Height Length Hor. Hor. RoundUp Vert. Vert. RoundUp
1a 2.9 2.82 4.833 5 4.7 5
1b 2.9 4.56 4.833 5 7.6 8
1c 2.9 1.82 4.833 5 3.0 4
1d 2.9 2.8 4.833 5 4.7 5
2a 2.9 5.64 4.833 5 9.4 10
2b 2.9 4.62 4.833 5 7.7 8
3a 2.9 5.64 4.833 5 9.4 10
3b 2.9 2.43 4.833 5 4.1 5
4a 2.9 2.82 4.833 5 4.7 5
4b 2.9 2.82 4.833 5 4.7 5
4c 2.9 2.41 4.833 5 4.0 5
4d 2.9 2.22 4.833 5 3.7 4
5 2.9 10.86 4.833 5 18.1 19
6 2.9 10.68 4.833 5 17.8 18
7a 2.9 10.79 4.833 5 18.0 18
7b 2.9 1.6 4.833 5 2.7 3
8a 2.9 10.3 4.833 5 17.2 18
8b 2.9 1.6 4.833 5 2.7 3
SUBTOTAL 86.43
Table B-3. Tie Bars, Horizontal and Vertical Bars for the Wall
ROOFDECK Height Length Hor. Hor. RoundUp Vert. Vert. RoundUp
1 2.9 4.6 4.833 5 7.7 8
2 2.9 4.6 4.833 5 7.7 8
3 2.9 5.79 4.833 5 9.7 10
4 2.9 5.79 4.833 5 9.7 10
SUBTOTAL 20.78
TOTAL NUMBER OF
1782 pcs.
10-MMΦ STEEL BARS
470 141.0 58 94
470 141.0 116 94
A. Column:
P = 2(a+b) + 0.20
Wood Frame:
Refer to Table 5-1 for 2x2 Frame (6mm thick)
2106.57 bd.ft
Provide, 71 pcs. 1.20 x 2.40 plywood, 2107 board feet 2x2 lumber
B. Beam: Girder 3:
P = 2(d) + b + 0.10 P = 2(d) + b + 0.10
Girder 1: Girder 1:
Dimension: 400 mm x 500 mm (8 beams) Dimension: 400 mm x 500 mm
Length = 1.6 m Length =
P= 1.55 m P=
A= 19.84 sq.m A=
# of Plywood 6.89 say 7 pcs. # of Plywood
Girder 2: Girder 4:
Dimension: 400mm x 500mm (4 beams) P = 2(d) + b + 0.10
Length = 5.79 m
P= 1.55 m Girder 1:
A= 35.898 sq.m Dimension: 400 mm x 500 mm
# of Plywood 12.46 say 13 pcs. Length =
P=
Wood Frame: A=
Refer to Table 5-1 for 2x2 Frame (6mm thick) # of Plywood
364 bd.ft
Provide, 13 pcs. 1.20 x 2.40 plywood, 364 board feet 2x2 lumber Wood Frame:
Refer to Table 5-1 for 2x2 Frame
C. Slab: 504
S1: (1 units) Provide, 18 pcs. 1.20 x 2.40 plywo
A= 24.192 sq.m
# of Plywood 8.40 say 9 pcs. S7: (1 units)
A=
Provide, 9 pcs. 4' x 8' Marine Plywood # of Plywood
TOTAL:
1.20 x 2.40 plywood 138
4' x 8' Marine Plywood 80
2x2 lumber 3982.57
Girder 5:
2(d) + b + 0.10 P = 2(d) + b + 0.10
Girder 1:
ension: 400 mm x 500 mm (4 beams) Dimension: 400 mm x 500 mm
4.48 m Length = 1.74 m
1.55 m P= 1.55 m
27.776 sq.m A= 10.788 sq.m
9.64 say 10 pcs. # of Plywood 3.75 say
Wood Frame:
er to Table 5-1 for 2x2 Frame (6mm thick) Refer to Table 5-1 for 2x2 Frame
bd.ft 112 bd.ft
vide, 10 pcs. 1.20 x 2.40 plywood, 280 board feet 2x2 lumber Provide,4 pcs. 1.20 x 2.40 plywood, 952 board feet 2x
Girder
2(d) + b + 0.10 P = 2(d) + b + 0.10
Girder 1:
ension: 400 mm x 500 mm (6 beams) Dimension: 400 mm x 500 mm
5.4 m Length = 4.6 m
1.55 m P= 1.55 m
50.22 sq.m A= 42.78 sq.m
17.44 say 18 pcs. # of Plywood 14.85 say
Wood Frame:
er to Table 5-1 for 2x2 Frame (6mm thick) Refer to Table 5-1 for 2x2 Frame
bd.ft 420 bd.ft
vide, 18 pcs. 1.20 x 2.40 plywood, 504 board feet 2x2 lumber Provide, 15 pcs. 1.20 x 2.40 plywood, 420 board feet
9.396 sq.m
3.26 say 4 pcs.
8.004 sq.m
2.78 say 3 pcs.
8.7 sq.m
3.02 say 4 pcs.
17.28 sq.m
6.00 say 6 pcs.
16 sq.m
5.56 say 6 pcs.
Girder 1:
(4 beams) Dimension: 400 mm x 500 mm (6 beams)
Length = 5m
P= 1.55 m
A= 46.5 sq.m
4 pcs. # of Plywood 16.15 say 17 pcs.
Wood Frame:
(6mm thick) Refer to Table 5-1 for 2x2 Frame (6mm thick)
476 bd.ft
0 plywood, 952 board feet 2x2 lumber Provide, 17 pcs. 1.20 x 2.40 plywood, 952 board feet 2x2 lumber
(6 beams)
15 pcs.
(6mm thick)
A. Column:
Total Length = 157.2 m
Refer to Table 5-3. Using 2" x 3" vertical support, 1100.4 bd.ft 2" x 3" x 14"
Refer to Table 5-3. Using 2" x 2" horizontal support, 3301.2 bd.ft 2" x 2" lumber
Refer to Table 5-3. Using 2" x 2" diagonal braces, 1839.24 bd.ft 2" x 2" lumber
B. Beam:
Total Length = 561.74 m
Refer to Table 5-3. Using 2" x 3" vertical support, 3370.44 bd.ft 2" x 3" x 14"
Refer to Table 5-3. Using 2" x 2" horizontal support, 2640.178 bd.ft 2" x 2" lumber
C. Slab:
S1: (7 units)
A= 891.084 sq.m
Refer to Table 5-3. Using 2" x 3" support, 8108.864 bd.ft 2" x 3" x 14"
Work Ave. Rate Unit Quantity Unit Man Hours
Temporary Fence 64.00
Warehouse 48.00
Clearing & Lay-Outing
Filling & Compaction 0.06 MH/C.M. 65.55 C.M. 3.93
Column Footing
Excavation 8 MH/C.M. 126.6 C.M. 1012.80
Gravel Bedding 2.07 MH/C.M. 8.5 C.M. 17.60
Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 2708.42 Kg 893.78
Matting of Bars & Tie Wires 0.33 MH/Kg 2708.42 Kg 893.78
Installation of Matt Bars 0.53 MH/Kg 2708.42 Kg 1435.46
Mixing of Concrete 1.8 MH/C.M. 77.4 C.M. 139.32
Pouring of Concrete 5 MH/C.M. 77.4 C.M. 387.00
Backfilling 12 MH/C.M. 96.32625 C.M. 1155.92
Column
1. 1st Floor
Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 2140.7 Kg 706.43
Installation of Reinforcement Bars 0.07 MH/Kg 2140.7 Kg 149.85
Fabrication of Formworks 1.08 MH/SQ.M 74.8 SQ.M 80.78
Installation of Formworks 2.35 MH/SQ.M 74.8 SQ.M 175.78
Mixing of Concrete 1.8 MH/C.M. 4.8 C.M. 8.64
Pouring of Concrete 5 MH/C.M. 4.8 C.M. 24.00
Removal of Formworks 0.85 MH/SQ.M 74.8 SQ.M 63.58
2. 2nd Floor
Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 1539.43 Kg 508.01
Installation of Reinforcement Bars 0.07 MH/Kg 1539.43 Kg 107.76
Fabrication of Formworks 1.08 MH/SQ.M 74.8 SQ.M 80.78
Installation of Formworks 2.35 MH/SQ.M 74.8 SQ.M 175.78
Mixing of Concrete 1.8 MH/C.M. 12.7 C.M. 22.86
Pouring of Concrete 5 MH/C.M. 12.7 C.M. 63.50
Removal of Formworks 0.85 MH/SQ.M 74.8 SQ.M 63.58
3. 3rd Floor
Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 1539.43 Kg 508.01
Installation of Reinforcement Bars 0.07 MH/Kg 1539.43 Kg 107.76
Fabrication of Formworks 1.08 MH/SQ.M 74.8 SQ.M 80.78
Installation of Formworks 2.35 MH/SQ.M 74.8 SQ.M 175.78
Mixing of Concrete 1.8 MH/C.M. 12.7 C.M. 22.86
Pouring of Concrete 5 MH/C.M. 12.7 C.M. 63.50
Removal of Formworks 0.85 MH/SQ.M 74.8 SQ.M 63.58
4. 4th Floor
Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 1539.43 Kg 508.01
Installation of Reinforcement Bars 0.07 MH/Kg 1539.43 Kg 107.76
Fabrication of Formworks 1.08 MH/SQ.M 74.8 SQ.M 80.78
Installation of Formworks 2.35 MH/SQ.M 74.8 SQ.M 175.78
Mixing of Concrete 1.8 MH/C.M. 12.7 C.M. 22.86
Pouring of Concrete 5 MH/C.M. 12.7 C.M. 63.50
Removal of Formworks 0.85 MH/SQ.M 74.8 SQ.M 63.58
Tie Beam
Excavation 8 MH/C.M. 16.5 C.M. 132.00
Gravel Bedding 2.07 MH/C.M. 4.65 C.M. 9.63
Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 1966.21 Kg 648.85
Installation of Bars 0.33 MH/Kg 1966.21 Kg 648.85
Fabrication of Formworks 1.08 MH/SQ.M 132 SQ.M. 142.56
Installation of Formworks 2.35 MH/SQ.M 132 SQ.M. 310.20
Mixing of Concrete 1.8 MH/C.M. 9.4 C.M. 16.92
Pouring of Concrete 5 MH/C.M. 9.4 C.M. 47.00
Removal of Formworks 0.85 MH/SQ.M 132 SQ.M. 112.20
Wall Footing
Excavation 8 MH/C.M. 28.01 C.M. 224.08
Gravel Bedding 2.07 MH/C.M. 2.33 C.M. 4.82
Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 302.88 Kg 99.95
Matting of Bars & Tie Wires 0.33 MH/Kg 302.88 Kg 99.95
Installation of Matt Bars 0.53 MH/Kg 302.88 Kg 160.53
Mixing of Concrete 1.8 MH/C.M. 3.7 C.M. 6.66
Pouring of Concrete 5 MH/C.M. 3.7 C.M. 18.50
Backfilling 12 MH/C.M. 9.34 C.M. 112.08
Wall
1. 1st Floor
a. Installing vertical and horizontal bars 0.07 MH/Kg 1509.6 Kg 105.67
b. Laying of CHB and pouring of mortar 1.33 MH/SQ.M 361.26 SQ.M 480.48
2. 2nd Floor
a. Installing vertical and horizontal bars 0.07 MH/Kg 1542.9 Kg 108.00
b. Laying of CHB and pouring of mortar 1.33 MH/SQ.M 367.445 SQ.M 488.70
3. 3rd Floor
a. Installing vertical and horizontal bars 0.07 MH/Kg 1542.9 Kg 108.00
b. Laying of CHB and pouring of mortar 1.33 MH/SQ.M 367.445 SQ.M 488.70
4. 4th Floor
a. Installing vertical and horizontal bars 0.07 MH/Kg 1542.9 Kg 108.00
b. Laying of CHB and pouring of mortar 1.33 MH/SQ.M 367.445 SQ.M 488.70
5. Parapet Wall
a. Installing vertical and horizontal bars 0.07 MH/Kg 358.9 Kg 25.12
b. Laying of CHB and pouring of mortar 1.33 MH/SQ.M 90.4 SQ.M 120.23
Beam
1. 2nd Floor
Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 2150.9 Kg 709.80
Installation of Bars, Ties, & Tire Wires 0.08 MH/Kg 2150.9 Kg 172.07
Fabrication of Formworks 1.08 MH/SQ.M 163.5 SQ.M 176.58
Installation of Formworks 3.08 MH/SQ.M 163.5 SQ.M 503.58
Mixing of Concrete 1.8 MH/C.M. 11.5 C.M. 20.70
Pouring of Concrete 5 MH/C.M. 11.5 C.M. 57.50
Removal of Formworks 0.85 MH/SQ.M 163.5 C.M. 138.98
2. 3rd Floor
Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 2150.9 Kg 709.80
Installation of Bars, Ties, & Tire Wires 0.08 MH/Kg 2150.9 Kg 172.07
Fabrication of Formworks 1.08 MH/SQ.M 163.5 SQ.M 176.58
Installation of Formworks 3.08 MH/SQ.M 163.5 SQ.M 503.58
Mixing of Concrete 1.8 MH/C.M. 11.5 C.M. 20.70
Pouring of Concrete 5 MH/C.M. 11.5 C.M. 57.50
Removal of Formworks 0.85 MH/SQ.M 163.5 C.M. 138.98
3. 4th Floor
Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 2150.9 Kg 709.80
Installation of Bars, Ties, & Tire Wires 0.08 MH/Kg 2150.9 Kg 172.07
Fabrication of Formworks 1.08 MH/SQ.M 163.5 SQ.M 176.58
Installation of Formworks 3.08 MH/SQ.M 163.5 SQ.M 503.58
Mixing of Concrete 1.8 MH/C.M. 11.5 C.M. 20.70
Pouring of Concrete 5 MH/C.M. 11.5 C.M. 57.50
Removal of Formworks 0.85 MH/SQ.M 163.5 C.M. 138.98
4. Roof Beam
Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 1797 Kg 593.01
Installation of Bars, Ties, & Tire Wires 0.08 MH/Kg 1797 Kg 143.76
Fabrication of Formworks 1.08 MH/SQ.M 163.5 SQ.M 176.58
Installation of Formworks 3.08 MH/SQ.M 163.5 SQ.M 503.58
Mixing of Concrete 1.8 MH/C.M. 11.5 C.M. 20.70
Pouring of Concrete 5 MH/C.M. 11.5 C.M. 57.50
Removal of Formworks 0.85 MH/SQ.M 163.5 C.M. 138.98
Slab
1. Slab on Fill
Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 162.8 Kg 53.72
Installation of Reinforcement Bars 0.08 MH/Kg 162.8 Kg 13.02
Mixing of Concrete 1.8 MH/C.M. 25.3 C.M. 45.54
Pouring of Concrete 5 MH/C.M. 25.3 C.M. 126.50
Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 2416 Kg 797.28
Installation of Reinforcement Bars 0.08 MH/Kg 2416 Kg 193.28
Fabrication of Formworks 1.08 MH/SQ.M 74.6 SQ.M 80.57
Installation of Formworks 3.08 MH/SQ.M 74.6 SQ.M 229.77
Mixing of Concrete 1.8 MH/C.M. 25.3 C.M. 45.54
Pouring of Concrete 5 MH/C.M. 25.3 C.M. 126.50
Removal of Formworks 0.85 MH/SQ.M 74.6 SQ.M 63.41
Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 2416 Kg 797.28
Installation of Reinforcement Bars 0.08 MH/Kg 2416 Kg 193.28
Fabrication of Formworks 1.08 MH/SQ.M 74.6 SQ.M 80.57
Installation of Formworks 3.08 MH/SQ.M 74.6 SQ.M 229.77
Mixing of Concrete 1.8 MH/C.M. 25.3 C.M. 45.54
Pouring of Concrete 5 MH/C.M. 25.3 C.M. 126.50
Removal of Formworks 0.85 MH/SQ.M 74.6 SQ.M 63.41
4. 4th Floor Slab
Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 2416 Kg 797.28
Installation of Reinforcement Bars 0.08 MH/Kg 2416 Kg 193.28
Fabrication of Formworks 1.08 MH/SQ.M 74.6 SQ.M 80.57
Installation of Formworks 3.08 MH/SQ.M 74.6 SQ.M 229.77
Mixing of Concrete 1.8 MH/C.M. 25.3 C.M. 45.54
Pouring of Concrete 5 MH/C.M. 25.3 C.M. 126.50
Removal of Formworks 0.85 MH/SQ.M 74.6 SQ.M 63.41
5. Roof Slab
Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 2975 Kg 981.75
Installation of Reinforcement Bars 0.08 MH/Kg 2975 Kg 238.00
Fabrication of Formworks 1.08 MH/SQ.M 104.38 SQ.M 112.73
Installation of Formworks 3.08 MH/SQ.M 104.38 SQ.M 321.49
Mixing of Concrete 1.8 MH/C.M. 25.3 C.M. 45.54
Pouring of Concrete 5 MH/C.M. 25.3 C.M. 126.50
Removal of Formworks 0.85 MH/SQ.M 104.38 SQ.M 88.72
Main Stairs
Bending & Cutting of Bars & Tie Wires 0.33 MH/Kg 421.1 Kg 138.96
Installation of Reinforcement Bars 0.08 MH/Kg 421.1 Kg 33.69
Fabrication of Formworks 1.08 MH/SQ.M 4.2 SQ.M 4.54
Installation of Formworks 3.08 MH/SQ.M 4.2 SQ.M 12.94
Mixing of Concrete 1.8 MH/C.M. 9.5 C.M. 17.10
Pouring of Concrete 5 MH/C.M. 9.5 C.M. 47.50
Removal of Formworks 0.85 MH/SQ.M 4.2 SQ.M 3.57
Hours/Day Man Days No. of Workers No. of Days Total No. of Days
8 8.0 4 2.0
8 6.0 3 2.0
8 30.0 10 3.0
8 0.5 15 0.03 7.0
8 126.6 20 6.3
8 2.2 10 0.2
8 111.7 20 5.6
8 111.7 20 5.6
8 179.4 20 9.0
8 17.4 10 1.7
8 48.4 10 4.8
8 144.5 20 7.2 40.5
8 88.3 20 4.4
8 18.7 20 0.9
8 10.1 10 1.0
8 22.0 10 2.2
8 1.1 10 0.1
8 3.0 10 0.3
8 7.9 10 0.8 9.8
8 63.5 20 3.2
8 13.5 20 0.7
8 10.1 10 1.0
8 22.0 10 2.2
8 2.9 10 0.3
8 7.9 10 0.8
8 7.9 10 0.8 8.9
8 63.5 20 3.2
8 13.5 20 0.7
8 10.1 10 1.0
8 22.0 10 2.2
8 2.9 10 0.3
8 7.9 10 0.8
8 7.9 10 0.8 8.9
8 63.5 20 3.2
8 13.5 20 0.7
8 10.1 10 1.0
8 22.0 10 2.2
8 2.9 10 0.3
8 7.9 10 0.8
8 7.9 10 0.8 8.9
8 16.5 20 0.8
8 1.2 10 0.1
8 81.1 20 4.1
8 81.1 20 4.1
8 17.8 10 1.8
8 38.8 10 3.9
8 2.1 10 0.2
8 5.9 10 0.6
8 14.0 10 1.4 16.9
8 28.0 20 1.4
8 0.6 10 0.1
8 12.5 15 0.8
8 12.5 15 0.8
8 20.1 15 1.3
8 0.8 10 0.1
8 2.3 10 0.2
8 14.0 20 0.7 5.5
8 13.2 15 0.9
8 60.1 10 6.0 6.9
8 13.5 15 0.9
8 61.1 10 6.1 7.0
8 13.5 15 0.9
8 61.1 10 6.1 7.0
8 13.5 15 0.9
8 61.1 10 6.1 7.0
8 3.1 15 0.2
8 15.0 10 1.5 1.7
8 88.7 15 5.9
8 21.5 15 1.4
8 22.1 10 2.2
8 62.9 10 6.3
8 2.6 10 0.3
8 7.2 10 0.7
8 17.4 10 1.7 18.6
8 88.7 15 5.9
8 21.5 15 1.4
8 22.1 10 2.2
8 62.9 10 6.3
8 2.6 10 0.3
8 7.2 10 0.7
8 17.4 10 1.7 18.6
8 88.7 15 5.9
8 21.5 15 1.4
8 22.1 10 2.2
8 62.9 10 6.3
8 2.6 10 0.3
8 7.2 10 0.7
8 17.4 10 1.7 18.6
8 74.1 15 4.9
8 18.0 15 1.2
8 22.1 10 2.2
8 62.9 10 6.3
8 2.6 10 0.3
8 7.2 10 0.7
8 17.4 10 1.7 17.4
8 6.7 15 0.4
8 1.6 15 0.1
8 5.7 15 0.4
8 15.8 15 1.1 2.0
8 99.7 15 6.6
8 24.2 15 1.6
8 10.1 10 1.0
8 28.7 10 2.9
8 5.7 15 0.4
8 15.8 15 1.1
8 7.9 10 0.8 14.4
8 99.7 15 6.6
8 24.2 15 1.6
8 10.1 10 1.0
8 28.7 10 2.9
8 5.7 15 0.4
8 15.8 15 1.1
8 7.9 10 0.8 14.4
8 99.7 15 6.6
8 24.2 15 1.6
8 10.1 10 1.0
8 28.7 10 2.9
8 5.7 15 0.4
8 15.8 15 1.1
8 7.9 10 0.8 14.4
8 122.7 15 8.2
8 29.8 15 2.0
8 14.1 10 1.4
8 40.2 10 4.0
8 5.7 15 0.4
8 15.8 15 1.1
8 11.1 10 1.1 18.1
8 17.4 15 1.2
8 4.2 15 0.3
8 0.6 10 0.1
8 1.6 10 0.2
8 2.1 10 0.2
8 5.9 10 0.6
8 0.4 10 0.04 2.5
Total No. of Weeks
1.17
6.75
1.63
1.49
1.49
1.49
2.82
0.91
1.15
1.17
1.17
1.17
0.29
3.09
3.09
3.09
2.89
0.33
2.39
2.39
2.39
3.02
0.42