QUIZ #1 CMPM 3F PART 1
Choose the correct answer from the options. Submit in MSform and turn-in your answer sheet pdf
copy in MSTeam.
1. These are used in high-rise building construction for lifting and moving heavy
objects from one place to another. (2 Points)
derrick
tower crane
chute
conveyor
2. Itis a method used for repair works, thin layering, or for fiber-reinforced layer
wherein the mortar or concrete is conveyed through a hose and pneumatically
projected at high velocity onto the surface. (2 Points)
pumperete
mortacrete
shoterete
pneumacrete
3. It is one of the steps in project management which ensures that the project is
progressing as planned. (2 Points)Project cope
Prec Pacing
Project Seeding
D Prec wating
4:Itis a heavy metal weight thats lited by a hoist ne then released and allowed to
{all onto the tap of the pile (2 Point)
pile diver
rp hare
cuter
5. A buried plate, ual or block attached at some distance from and forming an
anchorage for retaining structures. 2 Points)
ube
burtte
5. A watertight enclosure from which water is pumped to expose the bottom of a
body of water and permit construction. 2 Points)
cafeloa
bored pile
7, These walls are constructed by driving steel sheets into a slope or excavation,
(2 Points)
shotcree val
@ stecepie wa
ing wat
4. tis a temporary structure of wooden/steel pole and planks providing platform for
‘workmen to stand on while erecting the building. (2 Points)
foro
soeng
‘9, according tothe NSCP, construction joint in beams should be placed on what
part ofthe span? (2 Points)
rtspanuarerlegth
face of support
10. is used primarily for handing loose materials such as sand, gravel, crushed
stone, coal etc and for removing materia from cofferdams, pier foundations,
sewer manholes, etc. (2 Ponts)
paeader
bucket
@ ctr
ope