QUIZ #1 CMPM 3F PART 1 Choose the correct answer from the options. Submit in MSform and turn-in your answer sheet pdf copy in MSTeam. 1. These are used in high-rise building construction for lifting and moving heavy objects from one place to another. (2 Points) derrick tower crane chute conveyor 2. Itis a method used for repair works, thin layering, or for fiber-reinforced layer wherein the mortar or concrete is conveyed through a hose and pneumatically projected at high velocity onto the surface. (2 Points) pumperete mortacrete shoterete pneumacrete 3. It is one of the steps in project management which ensures that the project is progressing as planned. (2 Points) Project cope Prec Pacing Project Seeding D Prec wating 4:Itis a heavy metal weight thats lited by a hoist ne then released and allowed to {all onto the tap of the pile (2 Point) pile diver rp hare cuter 5. A buried plate, ual or block attached at some distance from and forming an anchorage for retaining structures. 2 Points) ube burtte 5. A watertight enclosure from which water is pumped to expose the bottom of a body of water and permit construction. 2 Points) cafe loa bored pile 7, These walls are constructed by driving steel sheets into a slope or excavation, (2 Points) shotcree val @ stecepie wa ing wat 4. tis a temporary structure of wooden/steel pole and planks providing platform for ‘workmen to stand on while erecting the building. (2 Points) foro soeng ‘9, according tothe NSCP, construction joint in beams should be placed on what part ofthe span? (2 Points) rtspan uarerlegth face of support 10. is used primarily for handing loose materials such as sand, gravel, crushed stone, coal etc and for removing materia from cofferdams, pier foundations, sewer manholes, etc. (2 Ponts) paeader bucket @ ctr ope ‘isco yt oe ft om Th yous i be ser he oman Mose eek {orn osc pce ts sgn oer hr et Pome Mart Fre icy cei em ne

You might also like