Sinoma International
Engineering Co.,Ltd. Equipment & Material List Design No. F -02,22,02E-EP-EM
Engineering Design Certificate No.:A132008760
Project Name Al Diyar Cement Plant 5000TPD Clinker Project Compile Check Verify
Item Limestone & Clay crushing & conveying ,Limestone & Clay preblending stroage & E.R.
Weight(t) power(kW)
Equipment No. Designation Type & Spec. Unit Q’ty Remarks
Unit Total single gross
38 Lighting distribution box SB-XRG-15/10 pcs 1 02AL
照明配电箱 SB-XRG-10/6 pcs 1 02EAL
SB-XRG-15/8 pcs 1 22AL
39 Factory lamp 工厂灯 GXTG64 ZJD70 Set 120 Poling installed 51 sets
GXTG64 ZJD150 Set 10
GXTG64 ZJD250 Set 16
40 ROOF LAMP 吸顶灯 GC31 60W Set 5
Page 6/ 8
Sinoma International
Engineering Co.,Ltd. Equipment & Material List Design No. F -02,22,02E-EP-EM
Engineering Design Certificate No.:A132008760
Project Name Al Diyar Cement Plant 5000TPD Clinker Project Compile Check Verify
Item Limestone & Clay crushing & conveying ,Limestone & Clay preblending stroage & E.R.
Weight(t) power(kW)
Equipment No. Designation Type & Spec. Unit Q’ty Remarks
Unit Total single gross
47 Zinc flat Steel 50*5mm m 1000
25*4mm m 100
Angle steel 角钢 L50x50x5 2.5m pcs 6
Instrument
1 02FCS Set 1 supplied with DCS
现场站
2 UPS POWER 6kVA, Input(输入):380V,3PH, Set 1
UPS电源 Output(输出):220V,1PH
3 Radar level indicator 24VDC, 2Wire pcs 2
雷达料位仪 Range: 0~15m
4 Thermal resistance with equipment设备自带 pcs 16
热电阻 Pt100
Page 7/ 8
Sinoma International
Engineering Co.,Ltd. Equipment & Material List Design No. F -02,22,02E-EP-EM
Engineering Design Certificate No.:A132008760
Project Name Al Diyar Cement Plant 5000TPD Clinker Project Compile Check Verify
Item Limestone & Clay crushing & conveying ,Limestone & Clay preblending stroage & E.R.
Weight(t) power(kW)
Equipment No. Designation Type & Spec. Unit Q’ty Remarks
Unit Total single gross
5 Vibration Measurment with equipment设备自带 pcs 2
测振仪
Page 8/ 8