Professional Documents
Culture Documents
3"
56-K4 S2
3
56-15L-2"
3"
3"
56-14L-3"
56-14L-3"
56-15L-2"
TO 56-V-201
DWG. D-56-1225-201-B
SECT. : 7-8
DELETED
56-IA8005-MS02-3"
3"
2"
DELETED
2"
2"
3"
TI 56 - 01 FD FAN FD FAN
1" @
40 52B-2 52B-3
13V2
10-IA-90503-L-1" 1
1"
@
11-K401A/B
D RAWN
REV D ATE R EV IS ION DE SC RIPTION APPD
NO C HECKED
15 OCT EKO
1 ADDED TIE IN 40 & ISSUED A. F. D. HPU
02 R TM
16 FEB T IS
2 AS BUILT DWG
07
4" x 3" PENGGANTIAN KOMPRESSOR 56K-4, BD
31 DES
3 PEMASANGAN NEW AIR RECEIVER VESSEL
2008
56K-4 S1 DAN 56 PSV-039
D RAWN BY ANT
D ATE 30/9-02 UTILITY SYSTEM FLOW DIAGRAM
D ESIGNE D BY R TM
D ATE 30/9-02
INSTRUMENT AIR
C HECK ED BY ANS
SIEMENS DAELIM
D ATE 30/9-02 CILA CAP RE FINERY
A PPROV ED BY HPU
D ATE 1/10-02
LPG AND SULFUR RECOVERY PROJECT - CILACAP REFINERY
P ROJ ECT Z EN P ERTA MINA CILACAP , JA VA , INDONESIA
C LIENT
NONE A21000-R-56-030 3
D ATE 16/10-02
APPROVED FOR
DESIGN AS - BUILT
DATE : 16 - 10 - 02
DESIGNED BY :
REV. DRAWN
DATE REVISION DESCRIPTION APPD
NO. CHECKED
6
DRAWN
DATE REVISION DESCRIPTION APP
CHECK
REV. DRAWN
DATE REVISION DESCRIPTION APPD
NOTI CE : THI S DRAW I NG HAS NOT BEEN PUBLISHED AND IS THE NO. CHECKED
SOLE PROPERTY OF FLUOR CORPORATION AND IS LENT TO THE
BORROWER FOR HIS CONFIDENTI AL USE ONLY; AND IN CONSI DERA- OCT
TI ON OF THE LOAN OF THI S DRAW ING, THE BORROWER PROMISES 1 6, 94
AND AGREES TO RETURN I T UPON REQUEST AND AGREES THAT AUG
I T SHALL NOT BE REPRODUCED, COPIED, LENT OR OTHERWISE 2 31, 94
DISPOSED OF DI RECTLY OR INDI RECTLY, NOR USED FOR ANY PUR-
MAR
POSE OTHER THAN THAT FOR WHICH IT IS FURNISHED.
3 21, 96
DRAW N BY JU LY
4 10, 96
MAY
CH ECK EDBY 5 30, 97
DRAWN BY
n/a
S UPE RVI SING I NI TI ALS / DATE
PRO J ECT ENGR APP. DATE SCALE DRAWING NUMBER REVISION n/a CILA CAP DE BOTTLE NECKING P ROJECT CONTRACT:429400
P ROJE CT E NG. A PP D. / DATE S CALE DRA WI NG NUMBER REV.
CL IENT APP. DATE
FLUOR DANIEL CLI ENT A PP D. / DATE
6
None
15 14 13 12 11 10 9 8 7 6 5 4 3 2 1