You are on page 1of 1

Unravel outer strands 2" to 3" (50-76mm) to expose central core

Unravel outer strands 2" to 3" (50-76mm) to expose central core TIP: Use a screwdriver to prise initial strands out of position.
2"- 3"

5
STEP 3
TIP: Use a screwdriver to prise initial strands out of position.
2"- 3"
2"- 3" 2"- 3"
2"-3"
3"

EASY STEPS
2"- 3" 2"-
2"- 3"
2"-
2"- 3"
3"
2"- 3"
STEP 3 2"- 3" STEP 3 2"- 3"
2"- 3" Slide wedge component over central core of wire rope 50mm-76mm
50mm-76mm
QUALITY RIGGING HARDWARE To Instant Rigging Repair
50mm-76mm
50mm-76mm
50mm-76mm
1/8"
FIVE EASY STEPS TO INSTANT RIGGING REPAIR
50mm-76mm QUALITY // "" 50mm-76mm
RIGGING HARDWARE
Slide wedge component over central core of wire rope
50mm-76mm
50mm-76mm
18
11 88
50mm-76mm
STEP 4
Slide wedge component over central core of wire rope
50mm-76mm 50mm-76mm 50mm-76mm
50mm-76mm 1/8"
50mm-76mm
1/8"
1/8"
50mm-76mm FIVE EASY STEPS TO
11/8" INSTANT RIGGING REPAIR
1/8"
11 /8/88"" 50mm-76mm
STEP14
STEP 11/88" 50mm-76mm STEP 4
1/8"
1 /8"
1/8" STEP 1 1/8"
3mm
3mm
3mm
12" - 300 mm 3mm
12" - 300 mm
12" mm
12" -- 300
300 mm Reposition outer strands 3mm
12" - 300 mm 3mm
Turn outer strands either clockwise or anti-clockwise, depending on the lay of the wire, around the wedge. Ensure approx 1/8" (2-3mm) of the central
Slide
Slide socket
socket component
component over wire over wire 3mm 3mm
3mm12" - 300 mm
core protrudes from the end of the wedge. Outer strands should be evenly situated around the wedge. Care should be taken to ensure that a strand
3mm
TIP:Wind
TIP: Wind tape wire
tape around around wire
approx 12" approx
(300mm) 12”This
from end. (300mm) 3mm from
will prevent the end.
socket This down
from sliding will the
prevent
wire. the socket from does not slip into the slit of the wedge.
3mm 12" - 300 mm
12" mm
sliding down the wire. 3mm
3mm 12" - 300 mm firmly, as indicated to hold wires in position. 12" -- 300 300 mm
TIP: Push the socket towards end of wire, while repositioning the outer strands, this will help control. When wire strands are in position, push socket

Reposition outer strands


Reposition outer strands
Turn outer strands either clockwisedepending 3mm
or anti-clockwise, depending on the layapprox
of the wire, around the
Reposition outer strands 3mm Slide
Turn
wedge.
core
socket
outer
TIP: protrudes
Wind tape
component
strands
Ensure
from theapprox
around
over
either clockwise
end of
wire
wire
approx
or anti-clockwise,
the 1/8”
wedge. (2-3mm)
Outer strands
12" (300mm) of the
should
from end. This
on the lay
be evenly
12"
of the -
willcentral
situated
prevent the
300
wire,
core
aroundmm
protrudes
around
socket
the wedge.
thesliding
from wedge. from
Ensure
Carethe
down the
wire.beend
should
1/8" (2-3mm)
takenof
of the central
the wedge.
to ensure that a strand
Turn outer strands either clockwise or anti-clockwise, depending on the lay of the wire, around the wedge. Ensure approx 1/8" (2-3mm) of the central
does not slip into the slit of the wedge.
Outer strands should be evenly situated around 3mm the this
wedge. Care
core protrudes from the end of the wedge. Outer strands should be evenly situated around the wedge. Care should be taken to ensure that a strand
3mm 12"
TIP: Push the socket towards end of wire, while repositioning the outer strands, - will
300 mmshould
help control.
be taken to ensure that a
When wire strands are in position, push socket

STEP 2
does not slip into the slit of the wedge.
TIP: Push the socket towards end of wire, while repositioning the outer strands, this will help control. When wire strands are in position, push socket strand does not slip into the slit of the wedge.
firmly, as indicated to hold wires in position.

STEP 5
firmly, as indicated to hold wires in position. TIP: Push the socket towards end of wire, while repositioning the outer strands, this will help
control. When wire strands are in position, push socket firmly, as indicated to hold wires in position.

STEP 2
STEP 5 STEP 5

Unravel
Unravel outer outer
strands strands 2" toto3"
2" to 3" (50-76mm) (50-76mm)
expose central core to expose central core
TIP: Use
TIP: Use a screwdriver
a screwdriver tostrands
to prise initial priseoutinitial strands out of position.
of position.

2"- 3"
2"- 3"
2"-
2"- 3"
3" Unravel outer strands 2" to 3" (50-76mm) to expose central core
TIP: Use a screwdriver to prise initial strands out of position.

2"- 3" 2"- 3"


STEP 3 2"- 3" Final Assembly
2"- 3"
2"-
2"- 3"
3"
Ensure former component sits in bottom of end fitting. Screw socket assembly into end fitting and tighten with spanners. The assembly is now
complete.
2"- 3"
STEP 3
TIP: Undue force is not required to terminate the wire.

2"- 3"
Fitting instructions are supplied with each Terminal.

Final Assembly
Final Assembly A-LOK
ST
Final
Slide
Slide Assembly
wedge
wedge componentcomponent over
over central core central
of wire rope 50mm-76mm
core of wire rope
Ensure former component sits in bottom of end fitting. Screw socket assembly into end fitting and tighten with spanners. The assembly is now
Ensure
complete. former component sits in bottom of end fitting. Screw socket assembly into end fitting and
50mm-76mm
Ensure former component sits in bottom of end fitting. Screw socket assembly into end fitting and tighten with spanners. The assembly is now
50mm-76mm tighten withis not
TIP: Undue force spanners. The assembly
required to terminate the wire. is now complete. Fitting instructions are supplied with each Terminal.
complete.
TIP: Undue force is not required to terminate the wire. 50mm-76mm Fitting instructions are supplied with each Terminal. TIP: Undue force is not required to terminate the wire. ES T
Fitting instructions are supplied with each Terminal. . 1973 D

Q
U

50mm-76mm 50mm-76mm
A N
Manufactured in UK over central core of wire rope
1/8"
L I A
B R
A-LOK
T Y
Slide wedge component
ST
50mm-76mm

www.stalok.com
1/8" A-LOK 50mm-76mm
11/88" 50mm-76mm ST 50mm-76mm
STEP 4 1/8" 1/8" 50mm-76mm ES T
. 1973 D
ES T

Q
U

1/8"
A N
. 1973 D Manufactured in UK L I
T Y B R
A

11/88"
Q

50mm-76mm
A N
Manufactured in UK
1/8"
STEP 4
L I A
T Y B R

1/8"

You might also like