PROJECT NAME : APPLICATION OF ALPHATEC 561 PROTECTIVE COATING ON THE UNIT 3 CWP MARINE PIPELINE PROJECT

LOCATION: CALACA, BATANGAS

POWER TOOLS LOADING

DURATION
MATERIALS QTY SPECIFICATION
WEEK 1 WEEK 2 WEEK 3

LED Lights 10 pcs 220V / 30W


Submersible Water Pump 12 units 220V / 2HP / 14A
Air Ventilator with Ducting Hose 8 units 220V / 520W
Sand Blasting Equipments with Air Compressor Diesel Engine
Makita Grinder 30 units 220V / 3.8A / 840W
Makita Blower 3 units 220V / 2.7A / 600W
Vacuum (Rigid) 3 units 220V / 60A

PREPARED BY: CONFORMED BY:


   
ALDRIN CLYDE D.C. FLORMATA  _______________________________
PROJECT ENGINEER SLPGC REPRESENTATIVE
ALPHATEC CHEMICAL CORP.
PROJECT NAME : APPLICATION OF ALPHATEC 561 PROTECTIVE COATING ON THE UNIT 3 CWP MARINE PIPELINE PROJECT
LOCATION: CALACA, BATANGAS
MANPOWER SCHEDULE

Manpower Requirements
Work Description QA/QC Safety Skilled
Prj. Mgr. Prj. Engr. First Aider Tech. Spvr. worker
Helper Scaffolder Driver
Mgr. Officer

SANDBLASTING 1 1 1 15 10 N/A 1

APPLICATION OF ALPHATEC 561 LINING SYSTEM 1 1 1 1 1 15 15 N/A 1

General Notes : PROPOSED TIME SCHEDULE AT SITE (24-HOURS SCHEDULE)


1st Shift (7:00 AM to 6:00 PM)
9:00 AM ~ 9:15AM (Coffee Break)
12:00 NN ~ 1:00 PM (Lunch Break)
3:00 PM ~ 3:15PM (Noon Break)

2nd Shift (6:00 PM to 6:00 AM)


9:00 PM ~ 9:15 PM (Coffee Break)
12:00 MN ~ 1:00 PM (Midnight Break)
3:00 AM ~ 3:15 AM (Morning Break)