You are on page 1of 1

80

+
0

5
+

00
80+100

PLA
N
00

80
1470700.000

+
80

300
+4
00

80+ 600
1470800.000

0 8
+70

8
0

80
+8

+
1470900.000

00

900

8 1+ 000
◄ AJIRE 330100.000 330000.000 329900.000 329800.000 329700.000 329600.000 329500.000 329400.000 329300.000 329200.000
K/NIGUS
2145 2137 2154
2144 2136 2153

BVC CH=80+207.123
2143 PVI STA=80+250.796 2135 2152
2142 PVI ELEV=2135.657 2134 2151

EVC CH=80+294.469
2141 K=9.73 2133 2150

ELV=2135.154

EVC CH=80+545.605
BVC CH=80+385.101
2140 LVC=87.35 2132 2149

ELV=2132.238
2139 2131 2148

EVC CH=80+439.891

BVC CH=80+489.535
2138 2130 2147

ELV=2125.244
ELV=2125.144
2137 2129 2146

ELV=2123.000

ELV=2123.000
2136 2128 2145
2135 2127 2144
2134 2126 2143
2133 2125 2142
2132 2124 2141
% 5
2131 2123 0.00% 2140 00 .14
8.
80
2130 2122 TL=49.644 2139 =3

PVI STA=80+517.570
PVI ELEV=2123.000
T 7.
- TL

PVI STA=80+412.496
2129 2121 2138

PVI ELEV=2123.000
L 83
2128 = 9 % 2120 2137

LVC=56.07
0.
63

K=7.00
LVC=54.79
2127 3 2119 2136

K=7.00
2126 2118 2135
2125 2117 2134
2124 2116 2133
2123 2115 2132
2122 2114 2131
2121 2113 2130
2120 2112 2129
2119 2111 2128
2118 2110 2127

80+140

80+200

80+300

80+400

80+500

80+600

80+700

80+800

80+859
80+160

80+180

80+220

80+240

80+260

80+280

80+320

80+340

80+360

80+380

80+420

80+440

80+460

80+480

80+520

80+540

80+560

80+620

80+640

80+660

80+680

80+720

80+740

80+760

80+780

80+820

80+840
CHAINAGE
HORIZONTAL L=35.413m
R=67.261m
L=62.049m
R=40.000m
L=32.280m
R=35.000m
L=57.215m
R=42.794m
L=56.653m
R=80.000m
L=84.046m
R=210.406m
L=52.134m
L=236.66 L=87.35 L=90.63 L=54.79 L=49.64 L=56.07 L=380.14
VERTICAL GEOMETRY G=1.15% K=9.729 G=-7.83% K=7.000 G=0.00% K=7.004 G=8.00%
LEFT OFFSET

2133.141
2134.612

2134.842

2135.217

2134.977

2134.326

2133.263

2130.240

2128.674

2127.109

2125.544

2123.283

2123.000

2123.000

2123.000

2123.663

2124.818

2126.396

2128.338

2129.939

2131.540

2136.342

2137.943

2139.544

2141.145

2144.347

2145.948
2134.741
2134.382

2135.072

2131.805

2124.137

2123.078

2126.737

2142.746

2147.478
DESIGN ELEVATION
RIGHT OFFSET

2135.701

2129.881

2134.921
2136.247

2137.874

2139.784

2136.466

2140.709

2142.944

2142.716

2141.240

2140.826

2117.162

2113.714

2118.122

2129.965

2131.286

2130.839

2131.454

2132.698

2136.328

2135.013

2138.295

2142.220

2145.973

2151.494

2150.019
2135.241

2149.111
2134.180

2137.135

2142.280

2139.242

2125.342

2130.786

2149.913
GROUND ELEVATION

-14.131
-10.474

-12.704

-14.042

-15.283

-15.105
-2.141

-4.071
-3.032

-6.302

-3.382

-0.352
-1.636

-2.063

-4.567

-0.724

-7.446

-6.598

-2.263

-6.468

-4.443
-4.050

-3.116

-2.759

-3.188

-0.499

-2.676

-4.828

-6.365

-7.147

-2.435
0.201
CUT AND FILL

4.878
5.838

9.286

1.330
PROJECT : DRAWING TITLE : DRAWING NUMBER
POWER CON JV WITH TLC Consultant: CLIENT PROJECT DWG NUMBER & TYPE STATUS REVISION
DRAWN: Markos FEDERAL DEMOCRATIC REPUBLIC OF Ajire-Keraker- Ketema Nigus ERA AKK PP - 01 F 0
ETHIOPIA PLAN AND PROFILE DRAWING
DESIGNED: Mesfin. ROAD PROJECT DRAWING STATUS CODES: SCALE SHEET SIZE
REV REVDATE REVTITLE
ETHIOPIAN ROADS AUTHORITY(ERA) FROM KM 80+140 TO KM 80+860 FS = FEASIBILITY STUDY T = TENDER D = DRAFT
C = CONSTRUCTIONP = PRELIMINARY A = AS BUILT
NTS
A3
No. DATE REVISION CHECKED SIGNED CHECKED: Merawi T. COPYRIGHT RESERVED

You might also like