Professional Documents
Culture Documents
+
0
5
+
00
80+100
PLA
N
00
80
1470700.000
+
80
300
+4
00
80+ 600
1470800.000
0 8
+70
8
0
80
+8
+
1470900.000
00
900
8 1+ 000
◄ AJIRE 330100.000 330000.000 329900.000 329800.000 329700.000 329600.000 329500.000 329400.000 329300.000 329200.000
K/NIGUS
2145 2137 2154
2144 2136 2153
BVC CH=80+207.123
2143 PVI STA=80+250.796 2135 2152
2142 PVI ELEV=2135.657 2134 2151
EVC CH=80+294.469
2141 K=9.73 2133 2150
ELV=2135.154
EVC CH=80+545.605
BVC CH=80+385.101
2140 LVC=87.35 2132 2149
ELV=2132.238
2139 2131 2148
EVC CH=80+439.891
BVC CH=80+489.535
2138 2130 2147
ELV=2125.244
ELV=2125.144
2137 2129 2146
ELV=2123.000
ELV=2123.000
2136 2128 2145
2135 2127 2144
2134 2126 2143
2133 2125 2142
2132 2124 2141
% 5
2131 2123 0.00% 2140 00 .14
8.
80
2130 2122 TL=49.644 2139 =3
PVI STA=80+517.570
PVI ELEV=2123.000
T 7.
- TL
PVI STA=80+412.496
2129 2121 2138
PVI ELEV=2123.000
L 83
2128 = 9 % 2120 2137
LVC=56.07
0.
63
K=7.00
LVC=54.79
2127 3 2119 2136
K=7.00
2126 2118 2135
2125 2117 2134
2124 2116 2133
2123 2115 2132
2122 2114 2131
2121 2113 2130
2120 2112 2129
2119 2111 2128
2118 2110 2127
80+140
80+200
80+300
80+400
80+500
80+600
80+700
80+800
80+859
80+160
80+180
80+220
80+240
80+260
80+280
80+320
80+340
80+360
80+380
80+420
80+440
80+460
80+480
80+520
80+540
80+560
80+620
80+640
80+660
80+680
80+720
80+740
80+760
80+780
80+820
80+840
CHAINAGE
HORIZONTAL L=35.413m
R=67.261m
L=62.049m
R=40.000m
L=32.280m
R=35.000m
L=57.215m
R=42.794m
L=56.653m
R=80.000m
L=84.046m
R=210.406m
L=52.134m
L=236.66 L=87.35 L=90.63 L=54.79 L=49.64 L=56.07 L=380.14
VERTICAL GEOMETRY G=1.15% K=9.729 G=-7.83% K=7.000 G=0.00% K=7.004 G=8.00%
LEFT OFFSET
2133.141
2134.612
2134.842
2135.217
2134.977
2134.326
2133.263
2130.240
2128.674
2127.109
2125.544
2123.283
2123.000
2123.000
2123.000
2123.663
2124.818
2126.396
2128.338
2129.939
2131.540
2136.342
2137.943
2139.544
2141.145
2144.347
2145.948
2134.741
2134.382
2135.072
2131.805
2124.137
2123.078
2126.737
2142.746
2147.478
DESIGN ELEVATION
RIGHT OFFSET
2135.701
2129.881
2134.921
2136.247
2137.874
2139.784
2136.466
2140.709
2142.944
2142.716
2141.240
2140.826
2117.162
2113.714
2118.122
2129.965
2131.286
2130.839
2131.454
2132.698
2136.328
2135.013
2138.295
2142.220
2145.973
2151.494
2150.019
2135.241
2149.111
2134.180
2137.135
2142.280
2139.242
2125.342
2130.786
2149.913
GROUND ELEVATION
-14.131
-10.474
-12.704
-14.042
-15.283
-15.105
-2.141
-4.071
-3.032
-6.302
-3.382
-0.352
-1.636
-2.063
-4.567
-0.724
-7.446
-6.598
-2.263
-6.468
-4.443
-4.050
-3.116
-2.759
-3.188
-0.499
-2.676
-4.828
-6.365
-7.147
-2.435
0.201
CUT AND FILL
4.878
5.838
9.286
1.330
PROJECT : DRAWING TITLE : DRAWING NUMBER
POWER CON JV WITH TLC Consultant: CLIENT PROJECT DWG NUMBER & TYPE STATUS REVISION
DRAWN: Markos FEDERAL DEMOCRATIC REPUBLIC OF Ajire-Keraker- Ketema Nigus ERA AKK PP - 01 F 0
ETHIOPIA PLAN AND PROFILE DRAWING
DESIGNED: Mesfin. ROAD PROJECT DRAWING STATUS CODES: SCALE SHEET SIZE
REV REVDATE REVTITLE
ETHIOPIAN ROADS AUTHORITY(ERA) FROM KM 80+140 TO KM 80+860 FS = FEASIBILITY STUDY T = TENDER D = DRAFT
C = CONSTRUCTIONP = PRELIMINARY A = AS BUILT
NTS
A3
No. DATE REVISION CHECKED SIGNED CHECKED: Merawi T. COPYRIGHT RESERVED