You are on page 1of 52

INSPECTION AND TESTING PLAN

( ITP )
3/52

ITP FOR FABRICATION OF MISCELLANEOUS STRUCTURAL STEEL WORKS

CONTRACTOR'S VERIFICATION STAMP

PURSUANT TO SPECIAL CONDITION 6, WE SKY ORYX JOINT VENTURE, VERIFY THAT THIS SUBMITTAL SATISFIES
ALL REQUIREMENTS OF THE CONTRACT, WITH THE EXCEPTION OF THE FOLLOWING CLARIFICATIONS/
PROPOSALS ACCEPTED BY THE ENGINEER;

CONTRACTOR'S PROJECT MANAGER;

M. HORIKAWA
PRINT NAME SIGNATURE DATE

DOCUMENT REVIEW STATUS

STATUS 1: WORK MAY PROCEED.

STATUS 2: REVISE & RESUBMIT.WORK MAY PROCEED SUBJECT TO INCORPORATION OF COMMENTS


INDICATED .

STATUS 3: REVISE & RESUBMIT. WORK MAY PROCEED.

STATUS 4: REVIEW NOT REQUIRED. WORK MAY PROCEED.

PERMISSION TO PROCEED SHALL NOT CONSTITUTE ACCEPTANCE OR APPROVAL OF DESIGN DETAILS,


CALCULATIONS, ANALYSES, TEST METHODS, OR MATERIALS DEVELOPED OR SELECTED BY CONTRACTOR AND
SHALL NOT RELIEVE CONTRACTOR FROM FULL COMPLIANCE WITH THE CONTRACT TECHNICAL SPECIFICATIONS
AND DRAWINGS.

Overseas Bechtel, Inc. Date

Document No:25045-A1126-18-ITP-S-027

Prepared Checked Approved


Rev.No Project
Date Description QA/QC
02 QA/QC Struct Engg Cond.Mgr. FET Mgr.
Mgr. Manager
Syed Kausar
4/52
5/52

NDIA
New Doha International Airpoet Project

INSPECTION AND TEST PLAN

FOR FABRICATION OF MISCELLANEOUS STRUCTURAL STEEL WORKS

Contract No.: Contract Title: ITP No. Issue date:09-02-2009 Rev. no : 2


25045-000FC1-maht-00018 Passenger Terminal Complex CCP-18 25045-A1126-18-ITP-S-027
Discipline: Reference Procedure/Method Statements/Specs. : QAP No.25145-A1000-18-GQA-S-001 Rev.2,
Page: 1 of 6
Structural Steel Spec. 05120, 05060.
Activity Controlling Verifying Inspection*
Activity Description Frequency Acceptance Criteria TPIA TPIA
No.: Document Documents SSI/C (NDT) SOJV OBI
(BOI)

1.0 Document Review


1.1 • Project Quality Assurance Plan (PQP) • Project Specifications Before Work As oer OBI Status code 1, SOJV-QP-10-02/X-01
• Method Statement • Exhibit-F Commencement 2 and 4
• Inspection and TestMethod Statement Plan (ITP) • Exhibit-B
• Shop drawings H H H R
• Material Submittals
• WPS, PQR&WQT
• NDT (TPIA) Procedures

1.2 • Fabrication Drawings • Project Specifications Before Work Fabrication Drawing SOJV-QP-10-02/X-01
Commencement acceptance to SOJV H H H R

2 Meterials-Steel Framing (ASTM A572, ASTM A36) • Spec-05120/Clause 2.1 ASTM, drawings, 05120 MRR, Drawings H H R R
2.1 Paint Material Inspection • Spec-05120 Each D.O. (SOJV-
• Primer Paint • Supplier submittal Delivery MRR-014-01 rev 1 & x-004)
• Manufacturer H H R SR
product data, Safety
Data & application
procedure

Inspection
H-Hold Point : Written notification required. Contractor may not W - Witness : Written notification required S - Surveillance : No notification required but R - Review : Record/
proceed beyond this point without written confirmation of the but Contractor may not proceed if OBI do activity may be subjected to OBI Surveillance/ Document review
6/52

Engineer not attend Monitoring


7/52

NDIA
New Doha International Airpoet Project

INSPECTION AND TEST PLAN

FOR FABRICATION OF MISCELLANEOUS STRUCTURAL STEEL WORKS

Contract No.: Contract Title: ITP No. Issue date ; Rev. no : 2


25045-000FC1-maht-00018 Passenger Terminal Complex CCP-18 25045-A1126-18-ITP-S-027
Discipline: Reference Procedure/Method Statements/Specs. : QAP No.25145-A1000-18-GQA-S-001 Rev.0,
Page: 2 of 6
Structural Spec 05120, 05060.
Activity Controlling Verifying Inspection*
Activity Description Frequency Acceptance Criteria TPIA TPIA
No.: Document Documents SSI/C
(NDT)
SOJV OBI
(BOI)

2.2 Welding Consumables • Spec-05120 Each ASME Section ll, Part C/ D.O & Batch
• SMAN Part2.1, Delivery AWS D 1.1, Section 5.3 Certificate /
• FCAW • 05060, part 2.1 Electrode log H H R SR
• SAW • Supplier submittal Register
3 Calibration
3.1 • Equipments Calibration • Calibration Procedure As per manufacturer/ • ISO10012-1:1992, • Calibration certificates
• Measuring Instrument calibration agency Part 1 - Metrological • Equipments
• NDT Testing Equipments recommendations. conformation system for Calibrationlog H H H S/R W
measuring equipment.
• For NDT Awa D1.1 &
ASME BPVC Section V
4 Fabrication
4.1 Marking and Cutting • Spec-05120 100% Dimensions tolerance Material
Part2.1,2.5c, 2.5.A.2, shall be as per identification and
2.5 I • AISC Specification for tracesbility /
• Approved shop Structural steel Inspection Request H W S SR
Drawings Building Part (25045-A1000-18-ITR-
16, Chapter M,M2,2 S-002& 001)
• Fabrication Tolerances
± 6 mm. for AESS.
• Fabrication Tolerances
are as per AISC for
Non- AESS.
Inspection
H-Hold Point : Written notification required. Contractor may not W - Witness : Written notification required S - Surveillance : No notification required but R - Review : Record/
proceed beyond this point without written confirmation of the but Contractor may not proceed if OBI do activity may be subjected to OBI Surveillance/ Document review
Engineer not attend Monitoring
8/52

NDIA
New Doha International Airpoet Project

INSPECTION AND TEST PLAN

FOR FABRICATION OF MISCELLANEOUS STRUCTURAL STEEL WORKS

Contract No.: Contract Title: ITP No. Issue date ; Rev. no : 2


25045-000FC1-maht-00018 Passenger Terminal Complex CCP-18 25045-A1126-18-ITP-S-027
Discipline: Reference Procedure/Method Statements/Specs. : QAP No.25145-A1000-18-GQA-S-001 Rev.0,
Page: 3 of 6
Structural Spec 05120, 05060.
Activity Controlling Verifying Inspection*
Activity Description Frequency Acceptance Criteria TPIA TPIA
No.: Document Documents SSI/C (NDT)
SOJV OBI
(BOI)

• AWS code for Weld


joint preparation
• Marking the high
strength steel as per
ASTM A/A6 M.
• Camber if requied by IFC
4.2 Fit-up • Spec -05120, Part 2.6.B 100% • AWS D1.1 Weld Visual Inspection
• Approved shop Drawings • Complicance to Report / Inspection
production Drawing Request H H S SR
(25045-A1000-18-
ITR-S-003&001)
4.3 Welding Process • Spec-05120, Part 100% • Approved WPS & PQR Weld Visual
2.6 & 05060 Part 3.5 • AWS D1.1 Inspection
• Production Drawings • APProved TPIA to Report / Inspection H H S SR
review and certify weld Request
procedures and all (25045-A1000-18-ITR-
welder qualifications S-003&001)
4.4 Welding Repair • Production Drawings • By grinding to smooth Report/ Inspection
• Repairs local surface contour with a Report
imperfection depth below curvature of less than 1/2 (25045-A1000-18-
1/16 inch or less inch (13 mm) in either ITR-S-003&001)
• Repair by welding where required direction. (NDT TPIA- Reports) H H W S SR
• Test on repair portion • To ensure that defects
have been temoved
prior to depositing any
weld metal, examine
prepared areas by
DPT.
Inspection
H-Hold Point : Written notification required. Contractor may not W - Witness : Written notification required S - Surveillance : No notification required but R - Review : Record/
9/52
proceed beyond this point without written confirmation of the but Contractor may not proceed if OBI do activity may be subjected to OBI Surveillance/ Document review
Engineer not attend Monitoring
10/52

NDIA
New Doha International Airpoet Project

INSPECTION AND TEST PLAN

FOR FABRICATION OF MISCELLANEOUS STRUCTURAL STEEL WORKS

Contract No.: Contract Title: ITP No. Issue date ; Rev. no : 2


25045-000FC1-maht-00018 Passenger Terminal Complex CCP-18 25045-A1126-18-ITP-S-027
Discipline: Reference Procedure/Method Statements/Specs. : QAP No.25145-A1000-18-GQA-S-001 Rev.0,
Page: 4 of 6
Structural Spec 05120, 05060.
Activity Controlling Verifying Inspection*
Activity Description Frequency Acceptance Criteria TPIA TPIA
No.: Document Documents SSI/C (NDT)
SOJV OBI
(BOI)

5 WELDING TESTING
5.1 Visual inspection of Welding • Spec -05060 Part 3.2 C 100% Weld Visual for Surface Weld Visual H W W S SR
• Drawings holes, cracks, Undercut, Inspection Report
Confirming to AWS D 1.1 (25045-A1000-18-
2004 Section (6.9), Table ITR-S-004)
6.1 (ITPA Endorsement
on Report)

5.2 Liquid Penetration test for Back gauging of Spec -05120, Part 2.9 As needed • AWS D1.1 - 2004 Visual
CP Welds Section (6.10) H H W S SR

5.3 • UT on CP Welds • Spec-05060, Part 100% • AWS D1.1 - 2004 UT Report


• UT on 38 mm and thicker 3.2,3.5 & 05120 part 2.9 • Section (6.13) (TPIA -Report)
plate subject throung • Drawings • ASTM E 164 & Weld map H H W S SR
thickness weld shrinkage
strain.
5.4 • MPI on Fillet Welds • Spec-05060, Part 3.5J • Web- Flange • AWS D1.1 - 2004 MPI Report
• MPI on Partial penetration • Drawings connection 10%,ii) 10% Section (6.10) (TPIA-Report)
Welds Beam and Girder • ASTM E 709 & Weld map H H W S SR
connection
where they connection
using a clip angle,
otherwise 100%
• All other connection
s-100%
Inspection
H-Hold Point : Written notification required. Contractor W - Witness : Written notification required S - Surveillance : No notification required but R - Review : Record/
may not proceed beyond this point without written but Contractor may not proceed if OBI do activity may be subjected to OBI Surveillance/ Document review
confirmation of the Engineer not attend Monitoring
11/52

NDIA
New Doha International Airpoet Project

INSPECTION AND TEST PLAN

FOR FABRICATION OF MISCELLANEOUS STRUCTURAL STEEL WORKS

Contract No.: Contract Title: ITP No. Issue date ; Rev. no : 2


25045-000FC1-maht-00018 Passenger Terminal Complex CCP-18 25045-A1126-18-ITP-S-027
Discipline: Reference Procedure/Method Statements/Specs. : QAP No.25145-A1000-18-GQA-S-001 Rev.0,
Page: 5 of 6
Structural Spec 05120, 05060.
Activity Controlling Verifying Inspection*
Activity Description Frequency Acceptance Criteria TPIA TPIA
No.: Document Documents SSI/C (NDT)
SOJV OBI
(BOI)

5.5 • RT on CP Welds • Spec-05120 part 2.9 E 25% Rt Re[prt


• Drawings (TPIA-Report & Weld) map H H W S SR
• NDT Procedure
6.0 Final Inspection (Fabrication)
6.1 • Final Inspection • Spec-05060 Part 3.2 Before Painting Check for dimension, Dimension
• Visual Inspection & 3.2, 05120 Part tolerance, orientation, Reports
• Dimensional check 2.5, 2.6.B depth, camber, holes (25045-A1000-18-
• Approved shop positions, distortion, ITR-S-005)
Drawings straightness, Erection (TPIA Endorsement
marks, etc & confirming on all fabrication
to AISC "Code of Records) H H S SR
Standards Practice for
steel Buildings Section
6,6.4.
Weld visual for surface
holes, cracks, Undercut,
Confirming to AWS D 1.1-
2004 Section 6.9, Table
6.1
7.0 Sand blasting and Primer Painting
7.1 Surface Preparation by Shot / Grit Blasting • Spec-05120, part 2.7 Each Fabricated • As per SSpc-sp 14/ Paint Report
• For AESS-Spec-09805 component NACE No.8 (25045-A1000-18-
part 3.2.A.1 inspection • For AESS confirming ITR-S-006) H W S SR
with SSPC SP-6

Inspection
H-Hold Point : Written notification required. Contractor may not W - Witness : Written notification required S - Surveillance : No notification required but R - Review : Record/
proceed beyond this point without written confirmation of the but Contractor may not proceed if OBI do activity may be subjected to OBI Surveillance/ Document review
Engineer not attend Monitoring
12/52

NDIA
New Doha International Airpoet Project

INSPECTION AND TEST PLAN


FOR FABRICATION OF MISCELLANEOUS STRUCTURAL STEEL WORKS

Contract No.: Contract Title: ITP No. Issue date ; Rev. no : 2


25045-000FC1-maht-00018 Passenger Terminal Complex CCP-18 25045-A1126-18-ITP-S-027
Discipline: Reference Procedure/Method Statements/Specs. : QAP No.25145-A1000-18-GQA-S-001 Rev.0,
Page: 6 of 6
Structural Spec 05120, 05060.
Activity Controlling Verifying Inspection*
Activity Description Frequency Acceptance Criteria TPIA TPIA
No.: Document Documents SSI/C
(NDT)
SOJV OBI
(BOI)

7.2 Primer Paint Application & Inspection • Spec-05120, part 2.3,2.7 Each Batch Check for Surface Paint report
• For AESS-Spec-09805 random inspection cleaning, Atmosphere (DFT)
part 2.3 conditions (25045-A1000-18-
(Temperatures & Humidity), ITR-S-006)
recommended maerials,
Dry Film Thickness
(DFT not less than 38μ) and
confirming with H W S SR
Manufacturer's
recommendations.
• For AESS primer DFT
(76μ ± 12.7 μ)
• Keep steel members
off ground and spaced
using pallets,
dunnage, or other
supports and spacers.
8.0 Final Inspection (Before Packing )

Inspection
H-Hold Point : Written notification required. Contractor may not W - Witness : Written notification required S - Surveillance : No notification required but R - Review : Record/
proceed beyond this point without written confirmation of the but Contractor may not proceed if OBI do activity may be subjected to OBI Surveillance/ Document review
13/52

Engineer not attend Monitoring


14/52

INSPECTION REQUEST

INSPECTION REQUEST NUMBER: DATE:

CONTRACT NO: CONTRACTOR NAME: REPORT NO:

DRAWING NO:

AREA / LOCATION / SUBJECT :

TYPE OF INSPECTION

MATERIAL FIT UP WELDING NDT

PAINTING SURVEY FINAL INSPECTION OTHER

DATE & TIME INSPECTION REQUIRED:

CONTRATOR : DATE & TIME :

RECEVIED BY : DATE & TIME :

REPLY Approved Approved as noted Not Approved

SUB CON QC REP: DATE:


( PRINT NAME AND SIGN )

SUB CONTRACTOR QC REP: DATE:


( PRINT NAME AND SIGN )

OBI REP: DATE:


WITNESS & REVIEW ONLY REVIEW
( PRINT NAME AND SIGN )
15/52

Document No: 25045-A1126-18-ITR-S-001


16/52

Material Receiving Report


17/52
18/52

MATERIAL RECEIVING REPORT


(RAW STEEL MATERIALS)
CONTRACT NO. CP - 18 CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC. DATE :
PROJECT : NEW DOHA INTERNATIONAL AIRPORT AREA : REPORT NO. :
LOCATION : SIAM STEEL BANGNA FACTORY STORAGE AREA : SIAM STEEL BANGNA FACTORY YARD SHEET NO. :
Weight Material Mill Test Date Delivery
Item No. Qty. Manufacturer Heat No.
Description (kgs.) Specification Certificate No. Received Order No.

REMARKS :

CONTRACTOR QC REPRESENTATIVE : DATE :


________________________________________________________________
(PRINT NAME AND SIGN)
SOJV QC REPRESENTATIVE : DATE :
________________________________________________________________
(PRINT NAME AND SIGN)
OBI REPRESENTATIVE : DATE :
__________________________________________________
WITHNESS & REVIEW ONLY REVIEW
19/52

(PRINT NAME AND SIGN) WITHNESS & REVIEW ONLY REVIEW


Document No. : 25045-A1126-18-ITR-S-001,ForM a
20/52

Marking, Cutting and Drilling (Material Identification and Traceability)


21/52
22/52

MATERIAL IDENTIFICATION AND TRACEABILITY REPORT


INSPECTION REQUEST NO.: DATE : REPORT NO. :
CONTRACT NO. CP - 18 CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC. SHEET NO. :
PROJECT : NEW DOHA INTERNATIONAL AIRPORT AREA : LOCATION : SIAM STEEL BANGNA FACTORY
PIECE MARK : STRUCTURE TYPE : DRAWING NO.:
Item Material Marking/
Part No./Mark Description Qty. Heat No. Mill Test Certificate No.
No. Specification Cutting

CONTRACTOR QC REPRESENTATIVE : DATE :


_________________________________________________________________________
(PRINT NAME AND SIGN)
SOJV QC REPRESENTATIVE : DATE :
_________________________________________________________________________
(PRINT NAME AND SIGN)
OBI REPRESENTATIVE : DATE :
_________________________________________________________
(PRINT NAME AND SIGN) WITHNESS & REVIEW ONLY REVIEW
23/52

Document No. : 25045-18-ITR-S-002


24/52

Fit-Up Inspection
25/52
26/52

FIT- UP INSPECTION REPORT


(WELD GROOVE)
INSPECTION REQUESTNO.: DATE :
CONTRACT NO. CP - 18 REPORT NO. :
CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC. SHEET NO. :
PROJECT : NEW DOHA INTERNATIONAL AIRPORT AREA :
PIECE MARK : LOCATION : SIAM STEEL BANGNA FACTORY
STRUCTURE TYPE : DRAWING NO. :
WELD JOINT KEYPLAN :

(SEE ATTACHED SHEETS)

LEGEND: F = FILLTE WELD P = PARTIAL PENETRATION WELD C = COMPLETE PENETRATION WELD

Groove Groove
Joint No. Root Gap Root Face Remark Joint No. Root Gap Root Face Remark
Angle Angle

CONTRACTOR QC REPRESENTATIVE : DATE :


__________________________________________________________
(PRINT NAME AND SIGN)
SOJV QC REPRESENTATIVE : DATE :
__________________________________________________________
(PRINT NAME AND SIGN)
OBI REPRESENTATIVE : DATE :
______________________________
(PRINT NAME AND SIGN) WITNESS &REVIEW ONLY REVIEW
27/52

Document No. :25045-A1126-18-ITR-S-003


28/52

FIT- UP INSPECTION REPORT


(WELD GROOVE)
INSPECTION REQUESTNO.: DATE :
CONTRACT NO. CP - 18 REPORT NO. :
CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC. SHEET NO. :
PROJECT : NEW DOHA INTERNATIONAL AIRPORT AREA :
PIECE MARK : LOCATION : SIAM STEEL BANGNA FACTORY
STRUCTURE TYPE : DRAWING NO.
WELD JOINT KEYPLAN :

(SEE ATTACHED SHEETS)

LEGEND: F = FILLTE WELD P = PARTIAL PENETRATION WELD C = COMPLETE PENETRATION WELD

Groove
PIECE MARK DRAWING NO. REV. Joint No. Root Gap Root Face Remark
Angle

CONTRACTOR QC REPRESENTATIVE : DATE :


__________________________________________________________
(PRINT NAME AND SIGN)
SOJV QC REPRESENTATIVE : DATE :
__________________________________________________________
(PRINT NAME AND SIGN)
OBI REPRESENTATIVE : DATE :
______________________________
WITNESS &REVIEW ONLY REVIEW
29/52

(PRINT NAME AND SIGN) WITNESS &REVIEW ONLY REVIEW


Document No. :25045-A1126-18-ITR-S-003,Form b
30/52

Weld Visual Inspection (VT)


31/52
32/52

E
33/52

WELD VISUAL INSPECTION REPORT

INSPECTION REQUESTNO.: DATE :


CONTRACT NO. CP - 18 REPORT NO. :
CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC. SHEET NO. :
PROJECT : NEW DOHA INTERNATIONAL AIRPORT AREA :
PIECE MARK : LOCATION : SIAM STEEL BANGNA FACTORY
STRUCTURE TYPE : MATERIAL SPECIFICATION:
DRAWING NO. :
Joint Welding Welder Id Marking / Cutting Report
WPS No. Fit-Up Report No. Visual
No. Process No. No.

VASUAL INSPECTION SUMMARY (As per AWS D1.1/D1.1M:2006 Sectuib 6.9, Tavle 6.1):

Item No. Inspection Category Result Item No. Inspection Category Result

OTHER REMARKS (IF ANY):


Refer to attached weld joint keyplan

CONTRACTOR QC REPRESENTATIVE : DATE :


__________________________________________________________
(PRINT NAME AND SIGN)
SOJV QC REPRESENTATIVE : DATE :
__________________________________________________________
(PRINT NAME AND SIGN)
OBI REPRESENTATIVE : DATE :
______________________________
(PRINT NAME AND SIGN) WITNESS &REVIEW ONLY REVIEW
34/52

Document No. : 25045-A1126-18-ITR-S-004


35/52
36/52

Final Inspection
37/52
38/52

FINAL INSPECTION REPORT


(VISUAL INSPECTION & SUMMARY OF INSPECTION REPORTS)
INSPECTION REQUEST NO.: DATE :
CONTRACT NO.: CP-18 REPORT NO. :
CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC. SHEET NO. :
PROJECT : NEW DOHA INTERNATIONAL AIRPORT AREA :
PIECE MARK : LOCATION : SIAM STEEL BANGNA FACTORY
STRUCTURE TYPE: DRAWING No.:
MATERIAL SPECIFICATION: ASTM A572 Grade 50

INSPECTION REPORTS SUMMARY

Inspection Report
Description ITP Activity No.
No.

INSPECTION RESULT:

OTHER REMARKS (IF ANY):

CONTRACTOR QC REPRESENTATIVE : DATE :


__________________________________________________________
(PRINT NAME AND SIGN)
TPIA REPRESENTATIVE DATE :
__________________________________________________________
(PRINT NAME AND SIGN)
SOJV QC REPRESENTATIVE : DATE :
__________________________________________________________
(PRINT NAME AND SIGN)
OBI REPRESENTATIVE : DATE :
______________________________
(PRINT NAME AND SIGN) WITNESS &REVIEW ONLY REVIEW
39/52

Document No. : 25045-A1126-18-ITR-S-005


40/52

FINAL INSPECTION REPORT


(VISUAL INSPECTION & SUMMARY OF INSPECTION REPORTS)
INSPECTION REQUEST NO.: DATE :
CONTRACT NO.: CP-18 REPORT NO. :
CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC. SHEET NO. :
PROJECT : NEW DOHA INTERNATIONAL AIRPORT AREA :
PIECE MARK : LOCATION : SIAM STEEL BANGNA FACTORY
STRUCTURE TYPE: DRAWING No.:
MATERIAL SPECIFICATION: ASTM A572 Grade 50

Non-Destructive Examination (NDE) Report Summary

Ultrasonic Testing (UT) Radiographic Testing (RT) Magnetic Particle Testing (MT)
41/52

Document No. : 25045-A1126-18-ITR-S-005, form b


42/52

Document No. : 25045-A1126-18-ITR-S-005, form b


43/52

Dimensional Inspection (Pre-Fit up)


44/52
45/52

DIMENSIONAL INSPECTION REPORT


(SINGLE PRODUCT)
INSPECTION REQUEST NO.: DATE :
CONTRACT NO. CP - 18 CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC. REPORT NO. :
PROJECT : NEW DOHA INTERNATIONAL AIRPORT AREA : SHEET NO. :
STRUCTURE TYPE: DRAWING NO.: LOCATION : SIAM STEEL BANGNA FACTORY
L1 L2 L3 L4 L5 H1 H2 H3 H4 e1
PIEXE MARK DD E DD E DD E DD E DD E DD E DD E DD E DD E DD E
(mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm)

e2 B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11
DD E DD E DD E DD E DD E DD E DD E DD E DD E DD E DD E DD E
(mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm)

4-6ARCH1 B12 B13 B14 B15 B16 B17 B18 B19 B20 B21 B22 B23
DD E DD E DD E DD E DD E DD E DD E DD E DD E DD E DD E DD E
(mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm)

B24 B25 B26 B27 B28 B29 B30 B31 B32 B33 B34 B35
DD E DD E DD E DD E DD E DD E DD E DD E DD E DD E DD E DD E
(mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm)

LEGEND:

SUBCONTRACTOR QC REPRESENTATIVE DATE :


_________________________________________________________________________
(PRINT NAME AND SIGN)
SOJV QC REPRESENTATIVE : DATE :
_________________________________________________________________________
(PRINT NAME AND SIGN)
OBI REPRESENTATIVE : DATE :
________________________________________________________________
(PRINT NAME AND SIGN) WITHNESS & REVIEW ONLY REVIEW
46/52

Document No. : 25045-A1126-18-ITR-S-005,Form C


47/52

Painting Inspection
48/52
49/52

PAINTING INSPECTION REPORT


INSPECTION REQUEST NO.: DATE : REPORT NO.:
CONTRACT NO. CP - 18 CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC. SHEET NO.:
PROJECT : NEW DOHA INTERNATIONAL AIRPORT AREA : LOCATION : SIAM STEEL BANGNA FACTORY
PIECE MARK : STRUCTURE TYPE : DRAWING NO.:
Surface Preparation: Sa 2.5 No. of Coats: Blasting & Painting Date: Weather :
Paint Specification: 25045-a1100-18-ssd-s-xxxx Required DFT: 76 microns Ambient Te,perature (๐C) Steel Temperature (๐C)
Paint Material: Relative Humidity (%): Dew Point (๐C)
Primer Coat DFT (microns) Primer Coat DFT (microns) Primer Coat DFT (microns)
Spot No. Gage Readings Spot No. Gage Readings Spot No. Gage Readings
Average Average Average
1st 2nd 3rd 1st 2nd 3rd 1st 2nd 3rd

OTHER REMARKS (IF ANY):


Note: Refer to Sheet 3 of 3 for DFT Spot Measuring Keyplan.

CONTRACTOR QC REPRESENTATIVE : DATE :


____________________________________________________________________________
(PRINT NAME AND SIGN)
SOJV QC REPRESENTATIVE : DATE :
_____________________________________________________________________________
(PRINT NAME AND SIGN)
OBI REPRESENTATIVE : DATE :
________________________________________________________ WITHNESS &
REVIEW ONLY REVIEW
50/52
WITHNESS &
(PRINT NAME AND SIGN) REVIEW ONLY REVIEW
Document No. : 25045-A1126-18-ITR-S-006
51/52

PAINTING INSPECTION REPORT


INSPECTION REQUEST NO.: DATE : REPORT NO.:
CONTRACT NO. CP - 18 CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC. SHEET NO.:
PROJECT : NEW DOHA INTERNATIONAL AIRPORT AREA : LOCATION : SIAM STEEL BANGNA FACTORY
PIECE MARK : STRUCTURE TYPE : DRAWING NO.:
Surface Preparation: Sa 2.5 No. of Coats: One (1) Blasting & Painting Date: Weather :
Paint Specification: 25045-a1100-18-ssd-s-xxx Required DFT: 76 microns Ambient Te,perature (๐C) Steel Temperature (๐C)
Paint Material: Relative Humidity (%): Dew Point (๐C)
Primer Coat DFT (microns)
Average DFT
Item No. Piece Mark Drawing No. Rev. Spot No. Gage Readings
(microns)
Inspection Result
Average
1st 2nd 3rd

CONTRACTOR QC REPRESENTATIVE : DATE :


____________________________________________________________________________
(PRINT NAME AND SIGN)
SOJV QC REPRESENTATIVE : DATE :
_____________________________________________________________________________
(PRINT NAME AND SIGN)
OBI REPRESENTATIVE : DATE :
____________________________________________________________
(PRINT NAME AND SIGN) WITHNESS & REVIEW ONLY REVIEW
52/52

Document No. : 25045-A1126-18-ITR-S-006,form b

You might also like