Powerline
HELICOPTERS
Powerline
003
_
1
p06
THE HELICOPTER
ADVANTAGE
_
2
p10
POWERLINE
INSPECTION
_
3
p16
PYLON ASSEMBLY
& CABLE LAYING
_
4
p16
MAINTENANCE
& REPAIR
_
5
p06
EMERGENCY
SITUATION
_
6
p10
OPERATIONAL
TRAINING
A HELICOPTER
7 FOR EVERY
_
p16 MISSION
005
THE HELICOPTER
ADVANTAGE
007
POWERLINE
INSPECTION
011
PYLON ASSEMBLY
& CABLE LAYING
013
EMERGENCY
SITUATION
_
019
A
HELICOPTER
H125 FOR ALL
_ MISSIONS
_
MAXIMUM TAKE OFF WEIGHT WITH
EXTERNAL LOAD: 2,800KG
MAXIMUM CARGO
SLING LOAD:
1,400KG
MAIN MISSION:
Power line inspection.
Stringing of conductors Medium voltage pylon
grid. Building of medium pylon grid.
025
H135
_
MAXIMUM TAKE OFF WEIGHT WITH EXTERNAL LOAD: 2,980KG
MAXIMUM CARGO
SLING LOAD:
1,200KG
MAIN MISSION:
Power line inspection. Power line maintenance. Building medium pylon grid.
027
H145
_
MAXIMUM TAKE OFF WEIGHT WITH EXTERNAL LOAD: 3,800KG
MAXIMUM CARGO
SLING LOAD:
1,600KG
MAIN MISSION:
Power line maintenance. Building medium pylon grid.
029
_
H215 - H225
MAXIMUM CARGO
SLING LOAD:
H215: 4,500KG
H225: 4,750KG MAIN MISSION:
Power line buiding.
Cable Stringin.
Power line maintenance.