Professional Documents
Culture Documents
3)
GUARANTEED TECHNICAL
PARTICULAR (GTP)
OF
220(245)kV 50kA
27 April, 2017
a General Data………………………………………………………………..
……..………….3
2 Configuration…………………………………………………………………………
……..………….3
3 Service Conditions…………………………………………………………….
……..………….3
4 Design Conditions…………………………………………………….
……..………….4
4.A Enclosure……………………………………………………………………….
……..………….4
5 System Parameters……………………………………………….……..………….5
6 Delivery conditions……………………………………………….
……..………….6
9 Pressure ……...………………………………………………………….
……..………….7
10 Circuit Breaker…………………………………………………………..
……..………….9
11 Disconnectors…………………………………………………………
……..…………12
12 Grounding Switch
13 Current Transformers…………………………………………………..…………16
14 Voltage Transformers…………………………………………………
……..………..20
20 Maintenance………………………………………………………..
……..………..24
Page 3 .
1 GIS
a General Data
i Name of manufacturer (OEM) Hyosung T&D India General Detail
3 Service Conditions
Chapter 21 , Cl. 21.4.36.a ,Page 290,
i Ambient Air Temp range. in Deg. C 50 deg C
Part 3 of CA
ii Max Temp. in Deg. C 50 deg C As per IEC 62271-230 ,Table 1,Page 10
iii Min Temp. in Deg. C -5 deg C As per IEC 62271-230 ,Table 1,Page 10
Guaranteed Technical Particulars_220kV WDFC Phase-II EMP-16 Project (Makarpura JNPT Section)
Page 4 .
4 Design Conditions
4.A Enclosure
Datasheet-A1, Sl.No. 3.3 A , Page 376,
i Material Aluminum Alloy
Part 3 of CA
RAL:7032
Other detail as per the submitted
a External As per Manufacturer's Standard Practice
document of " Standard Painting Sysytem"
(Doc.No. HI-16-0024-F_R0)
RAL:7032
Other detail as per the submitted
b Internal As per Manufacturer's Standard Practice
document of " Standard Painting Sysytem"
(Doc.No. HI-16-0024-F_R0)
xv Barrier
Chapter 21 , Cl. 21.4.3 ,Page 286,
a Material Epoxy resin
Part 3 of CA
b Dielectric strength Same as GIS N/A
Guaranteed Technical Particulars_220kV WDFC Phase-II EMP-16 Project (Makarpura JNPT Section)
Page 5 .
ii Minimum thickness of galvanizing 80µm and above As per Standard Painting System
iii Foundation Channels/ Anchor bolts Anchor bolts As per Manufacturer's Standard Practice
4.C Grounding
5 System Parameters
Datasheet-A1, Sl.No. 1.2 , Page 376,
i Highest System voltage in kV 245 kV
Part 3 of CA
Datasheet-A1, Sl.No 1.1 , Page 376,
ii Rated voltage of System in kV 220 kV
Part 3 of CA
iii Rated voltage of Equipment in kV 300 kV As per Manufacturer's Type test Report
One Min Power Frequency withstand voltage As per IEC 62271-203, Table 2 ,
a 460 kV
KVrms Page 14
- Phase to Earth NA NA
- Between Phases NA NA
Internal Fault withstand time without burn through As per IEC 62271-203, Table 4,
x As per table 4 (IEC 62271-203)
in ms Page 22
Guaranteed Technical Particulars_220kV WDFC Phase-II EMP-16 Project (Makarpura JNPT Section)
Page 6 .
a Bays fully assembled at works CB module & Bus bar with bus DS As per Manufacturer's Standard Practice
d Pressure of N2 gas during transportation 0.03 Mpa.G (Minimum) As per Manufacturer's Standard Practice
7 Bus Bar - -
i Configuration (Single / Double) Double Bus (As per Single Line Diagram) As per Bidder's SLD
ii No of Phases 1x3phase (As per Single Line Diagram) As per Bidder's SLD
Guaranteed Technical Particulars_220kV WDFC Phase-II EMP-16 Project (Makarpura JNPT Section)
Page 7 .
iv Nos of Gas compartments As per GIS Gas System Diagram As per GIS Gas System Diagram
Quantity of SF6 Gas of individual compartment
As per GIS Gas System Diagram As per GIS Gas System Diagram
v GIS
at filling pressrue, in kg
vi Maximum permissible dew point, in Deg.C -5 ℃ Manufacturer's Intellectual data
9 Pressure
i Design pressure
Manufacturer's Intellectual data
a Circuit breaker (Mpa.G) 0.90 (As per Manufacturer's Type Test)
Guaranteed Technical Particulars_220kV WDFC Phase-II EMP-16 Project (Makarpura JNPT Section)
Page 8 .
vi Alarm Pressure
a Circuit breaker (Mpa.G) (As per Gas System Diagram) (As per Gas System Diagram)
i First Stage Alarm 0.69 Mpa.G (As per Gas System Diagram)
ii Second Stage Alarm 0.67 Mpa.G (As per Gas System Diagram)
iii Third Stage Alarm 0.65 Mpa.G (As per Gas System Diagram)
b Other compartments (Mpa.G) (As per Gas System Diagram) (As per Gas System Diagram)
i First Stage Alarm 0.52 Mpa.G (As per Gas System Diagram)
ii Second Stage Alarm 0.50 Mpa.G (As per Gas System Diagram)
CB lock out Pressure (Mpa.G)
c {SF6 gas pressure at which CB operate 0.65 (As per Gas System Diagram)
satisfactorily}
d Overpressure signaling N/A N/A
Chapter 21 , Cl. 21.4.10 ,Page 287,
vii Maximum SF6 Gas leakage rate, in % per year Less than 0.5%
Part 3 of CA
Guaranteed Technical Particulars_220kV WDFC Phase-II EMP-16 Project (Makarpura JNPT Section)
Page 9 .
10 Circuit Breaker
i Applicable standard IEC 62271-100 IEC 62271-100
iii Operating Mechanism type Single phase ,Spring charged by motor As per Manufacturer's Standard Design
Transient Recovery Voltage for Terminal Faults As per IEC 62271-100, Table-5,
xviii 446kV
(Table-5, Page 59 IEC 62271-100) Page 59
xxiii Material of main contact Copper and Arc metal As per Manufacturer's Standard Design
xxiv Material of Arcing contacts Copper and Arc metal As per Manufacturer's Standard Design
Guaranteed Technical Particulars_220kV WDFC Phase-II EMP-16 Project (Makarpura JNPT Section)
Page 10 .
xxxii Spring charging time at rated Aux supply Less than 10 s Manufacturer's Intellectual data
xxxiii Spring charging time at min Aux supply Less than 10 s Manufacturer's Intellectual data
No of operations after switching off of motor Aux. Chapter 21 , Cl. 21.10.6.3.3,Page 297,
f O-C-O
supply Part 3 of CA
Guaranteed Technical Particulars_220kV WDFC Phase-II EMP-16 Project (Makarpura JNPT Section)
Page 11 .
Guaranteed Technical Particulars_220kV WDFC Phase-II EMP-16 Project (Makarpura JNPT Section)
Page 12 .
11 DISCONNECTORS
i Applicable standard IEC 62271-102 IEC 62271-102
ix Material of contacts Copper with silver plated As per Manufacturer's Standard Design
Rated lightning impulse withstand voltage across As per IEC 62271-203, Table 2 ,
xi 1050(+170) kVp
the open gap, kVp Page 14
Rated Power Freq withstand voltage across the As per IEC 62271-203, Table 3 ,
xiii 595 kV
open gap, kVrms Page 14
xv Type of Operating Mechanism Motor drive and manual As per Manufacturer's Standard Design
Guaranteed Technical Particulars_220kV WDFC Phase-II EMP-16 Project (Makarpura JNPT Section)
Page 13 .
Guaranteed Technical Particulars_220kV WDFC Phase-II EMP-16 Project (Makarpura JNPT Section)
Page 14 .
12 Grounding Switch
12.a Maintenance Grounding Switch
i Applicable standard IEC 62271-102 IEC 62271-102
Rated lightning impulse withstand voltage across As per IEC 62271-203, Table 2 ,
v 1050(+170) kVp
the open gap, kVp Page 14
vii Type of Operating Mechanism Motor drive and manual As per Manufacturer's Standard Design
ix Operating Time
a - Closing Less than 3 s Manufacturer's Intellectual data
Rated lightning impulse withstand voltage across As per IEC 62271-203, Table 2 ,
vi 1050(+170) kVp
the open gap, kVp Page 14
ix Type of Operating Mechanism Motor drive spring charged and manual As per Manufacturer's Standard Design
Guaranteed Technical Particulars_220kV WDFC Phase-II EMP-16 Project (Makarpura JNPT Section)
Page 15 .
xi Operating Time
Less than 5 s
a - Closing Manufacturer's Intellectual data
(including spring charging time)
Less than 5 s
b - Opening Manufacturer's Intellectual data
(including spring charging time)
Guaranteed Technical Particulars_220kV WDFC Phase-II EMP-16 Project (Makarpura JNPT Section)
Page 16 .
13 Current Transformers
i Type Ring Type As per Manufacturer's Standard Design
a Metering core
i -Ratio 1600-800/1 A As per Bidder's SLD
iii -Accuracy class 0.2S (For All Taps) As per Bidder's SLD
b Protection core
a Metering core
i -Ratio 1600-800/1 A As per Bidder's SLD
20 VA For 800/1A Tap
ii -Output Burden As per Bidder's SLD
40VA For 1600/1A Tap
iii -Accuracy class 0.2S (For All Taps) As per Bidder's SLD
Guaranteed Technical Particulars_220kV WDFC Phase-II EMP-16 Project (Makarpura JNPT Section)
Page 17 .
b Protection core
i -Ratio 1600-800/1 A As per Bidder's SLD
a Metering core
i -Ratio 500-250/1 A As per Bidder's SLD
20 VA For 250/1A Tap
ii -Output Burden As per Bidder's SLD
40VA For 500/1A Tap
iii -Accuracy class 0.2S (For All Taps) As per Bidder's SLD
iii -Accuracy class 5P20 (For All Taps) As per Bidder's SLD
Guaranteed Technical Particulars_220kV WDFC Phase-II EMP-16 Project (Makarpura JNPT Section)
Page 18 .
a Metering core
i -Ratio 500-250/1 A As per Bidder's SLD
20 VA For 250/1A Tap
ii -Output Burden As per Bidder's SLD
40VA For 500/1A Tap
iii -Accuracy class 0.2S (For All Taps) As per Bidder's SLD
iii -Accuracy class 5P20 (For All Taps) As per Bidder's SLD
Guaranteed Technical Particulars_220kV WDFC Phase-II EMP-16 Project (Makarpura JNPT Section)
Page 19 .
Guaranteed Technical Particulars_220kV WDFC Phase-II EMP-16 Project (Makarpura JNPT Section)
Page 20 .
14 Voltage Transformers
Chapter 21 , Cl. 21.14.1.4.5,Page 306,
i Type Inductive type
Part 3 of CA
ii Position of Voltage Transformer Main bus , Line bay & Traction TRF bay As per Bidder's SLD
Guaranteed Technical Particulars_220kV WDFC Phase-II EMP-16 Project (Makarpura JNPT Section)
Page 21 .
Nominal Discharge Current (kA) with 8/20 Micro Chapter 21 , Cl. 21.16.5.d.Page 312,
x 10 kA
second wave Part 3 of CA
a Lightning impulse withstand voltage 1050 kVp As per Manufacturer's Standard Design
xvi Scale range of current leakage meter 0-30 mA As per Manufacturer's Standard Design
xvii Disconnecting link for GIS High Voltage Test No As per Manufacturer's Standard Design
xviii Rated SF6 gas pressure 0.61 Mpa.G As per Manufacturer's Standard Design
xix Min. (Guaranteed) SF6 gas pressure 0.55 Mpa.G As per Manufacturer's Standard Design
xx Design (Max.) SF6 gas pressure 0.7 Mpa.G As per Manufacturer's Standard Design
Guaranteed Technical Particulars_220kV WDFC Phase-II EMP-16 Project (Makarpura JNPT Section)
Page 22 .
xxi SF6 gas leakage 0.5% per year As per Manufacturer's Standard Design
xxii Protection level of enclosure Same as GIS As per Manufacturer's Standard Design
Guaranteed Technical Particulars_220kV WDFC Phase-II EMP-16 Project (Makarpura JNPT Section)
Page 23 .
Indoor
ii Location in GIS As per Bidder's Layout
(Stand alone in front of GIS)
iii Material Cold rolled sheet steel As per Manufacturer's Standard Design
Guaranteed Technical Particulars_220kV WDFC Phase-II EMP-16 Project (Makarpura JNPT Section)
Page 24 .
20 Maintenance
Maximum down time for degassing and refilling As per OEM manual
ii N/A
the biggest compartment (Will be provided before dispatch)
Not yet
v Operation and Maintenance manual attached N/A
(Will be provided before dispatch)
vii Minimum time of availabiliity of local service Within 2~3 Days N/A
viii Availability of spares at local service centre Yes N/A
Yes
ix List of Special tools attached (Doc. No.HI-16-0024-G-Special Tools N/A
List_R1)
Yes
x List of Spare parts attached (Doc. No.HI-16-2024-S-Special Tools N/A
List_R4)
Guaranteed Technical Particulars_220kV WDFC Phase-II EMP-16 Project (Makarpura JNPT Section)