Professional Documents
Culture Documents
Change point
Pre-change picture
Change picture
Impact on functionality
Potential failure effect
(process)
Potential failure effects
(lower process)
Potential failure impact
(customer)
Potential failure impact
(user)
PFM recommended
measures
Pre-change requirements
Switching time
Close date
Engineer confirmation
Project manager
confirmation
FM-C0902-05-02 Retention Period: 20 years