You are on page 1of 1

Project

Kuat Tekan Beton (fc'): 8,3 MPa


Tulangan (fy): 300 MPa
Selimut Beton: 30 mm
Faktor reduksi ɸ / Berdasarkan ACI 318-14

Perkuatan Balok
b h d Kap.eksist Kap. Perlu
No. Material Tul Eksisting
mm mm mm ɸMn (kN.m) Mu (kN.m)
10 D16 0,65 247,01 160,555 268,00
Tump Ki
5 D16 0,90 144,99 130,492 99,00
5 D16 0,90 144,99 130,492 47,68
1 Balok B1 300 600 552 Lap
10 D16 0,65 247,01 160,555 233,67
10 D16
Tump Ka
5 D16
7 D16 0,71 234,70 167,763 153,88
Tump Ki
4 D16 0,90 134,11 120,703 45,81
4 D16 0,90 95,30 85,773 9,67
2 Balok B2 300 500 452 Lap
7 D16 0,71 148,73 106,313 148,37
7 D16
Tump Ka
4 D16
7 D16 0,65 140,31 91,200 145,69
Tump Ki
4 D16 0,90 92,55 83,298 38,25
4 D16 0,90 92,55 83,298 9,67
3 Balok B3 250 500 452 Lap
7 D16 0,90 92,55 83,298 14,90
7 D16
Tump Ka
4 D16
5 D16 0,67 80,38 53,913 79,00
Tump Ki
3 D16 0,90 54,41 48,972 12,70
3 D16 0,90 54,41 48,972 9,67
4 Balok B4 250 400 352 Lap
5 D16 0,67 80,38 53,913 61,60
5 D16
Tump Ka
3 D16
3 D16 0,86 45,73 39,462 41,89
Tump Ki
2 D16 0,90 32,55 29,293 16,10
2 D16 0,90 32,55 29,293 4,20
5 Balok B5 250 350 304 Lap
3 D16 0,86 45,73 39,462 31,40
3 D16
Tump Ka
2 D16
2 D13 0,90 18,10 16,290 1,57
Tump Ki
2 D13 0,90 18,10 16,290 3,70
2 D13 0,90 18,10 16,290 1,00
6 Balok B6 200 300 255,5 Lap
2 D13 0,90 18,10 16,290 6,55
2 D13
Tump Ka
2 D13
4 D13 0,88 60,56 53,081 45,00
Tump Ki
2 D13 0,90 33,28 29,951 10,70
2 D13 0,90 33,28 29,951 4,20
7 Balok B7 150 500 455,5 Lap
4 D13 0,88 60,56 53,081 45,40
4 D13
Tump Ka
2 D13