Manufacturing Record Book

Table of Contents
ABBREVIATIONS.........................................................................................................................................................4
1. MRB INDEX.........................................................................................................................................................5
1.1 Appendix.........................................................................................................................................................5
MRB Index

Part A – GENERAL DOCUMENTS


Section Description
1 MASTER DOCUMENT REGISTER (MDR)
2 PROJECT EXECUTION PLAN
3 PROJECT QUALITY PLAN
4 PROJECT AUDIT PLAN
5 NCR PROCEDURE
6 METHOD STATEMENT FOR PAINTING & TOUCH -UP PAINTING
7 MATERIAL RECEIVING, STORAGE, HANDLING AND ISSUANCE PROCEDURE
8 WELDING PROCEDURE REGISTER
9 WELDERS QUALIFICATION REGISTER
10 WELDING PAINTING AND NDT PERSONNEL QUALIFICATIONS AND THEIR ADNOC APPROVALS
11 NDT PROCEDURE- UT
12 NDT PROCEDURE- RT
13 NDT PROCEDURE- MPI
14 ITP FOR ANCHOR PILE FABRICATION
15 ELECTRODES HANDLING AND BAKING CONTROL PROCEDURE
16 DIMENSIONAL CONTROL PROCEDURE
17 MATERIAL TRACEABLITY REPORT
18 PWHT PROCEDURE
19 CALIBRATION CERTIFICATES REGISTER (WELDING MACHINES AND INSPECTION TOOLS)
20 MANUFACTURER RECORD BOOK (MRB OR DOSSIER)
21 HSE MANAGEMENT SYSTEM MANUAL
22 EMERGENCY RESPONSE PROCEDURE (ERP)
23 PLANNING FOR HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL PROCEDURE
24 ENVIORNMENT / WASTE MANAGEMENT PLAN
25 HSE AUDIT AND INSPECTION PROCEDURE
26 HSE MANAGEMENT FOR SUB CONTRACTOR
27 BEHAVIOUR BASED SAFETY MANAGEMENT
28 HSE PERFORMANCE MONITORING
29 OCCUPATIONAL HEALTH PROCEDURE
30 HSE CRITICAL EQUIPMENT AND SYSTEM
31 PERSONAL PROTECTIVE EQUIPMENT POLICY
32 HSE TRAINING REGULATIONS
33 WELFARE MANAGEMENT AND ASSURANCE
34 INCEDENT REPORTING & INVESTIGATION
35 SAFE OPERATING PROCEDURES, HOTWORK, PAINTING, SCAFOLDING / WORK AT HEIGHT
36 HSE STATISTICS FOR THE PAST 5 YEARS
37 HSE PLAN FOR FABRICATION ACTIVITIES
38 RISK ASSESSMENT FOR FABRICATION ACTIVITIES
Part B – Inspection and Test Records
Section Description
1 Weld Traceability
2 Material Traceability
3 Visual Inspection Reports
4 Radiographic Examination Reports
5 Ultrasonic Examination Reports
6 Magnetic Particle Examination Reports
7 PWHT Reports
8 Dimension Control Reports
9 Paint Reports
10 Material Teat Certificates
11 As-built Drawings