You are on page 1of 2

INSTRUCTION FOR RECLOSER & CONTROLLER EATON’S COOPER

Test date: ............................................................................................................................................

Controller serial number: ...................................................................................................................

Controller firmware:. .........................................................................................................................

Please check step-by-step:

Step 1: Active GND Trip Blocked function on Controller (press GND Trip Blocked, then press
Enter – GND Trip Blocked LED illuminated).

Step 2: Pull out 19-pin control cable below Controller.

Step Item Pass Fail Note

When using AC power


(MCB ON), measure the DC
voltage between pin T(+) –
1
N(-) of 19 pin receptacle on
Controller if the voltage is
between 50 - 54Vdc or not.

When using AC power


(MCB ON), check if PWR
2
LED on power supply board
is illuminated or not.

3 When using DC power


(MCB OFF), measure the DC
voltage between pin T(+) &
N(-) if the voltage is between
50 - 54Vdc or not.
When using DC power
(MCB OFF), check if PWR
4
LED on power supply board
is illuminated or not.

You might also like