File No. Tender(P)-06/17 Letter No. 2/3, Di
Additional Chief Engineers, All RWS&S Circles
Superintending Engineers! Executive Engineers, All RWS&S Divisions
Sub: Codal/Contractual provisions regarding Price Adjustment in Works Contract.
Refi Letter No. 22786 dated 27.12.2021 of Govt. in PR&DW Department and OM.
No. 15847/W dated 19.11.2019 & O.M. No. 8189/W dated 07.06.2021 of Works
Department
Sir.
Please find enclosed herewith Govt. in PR&DW Department Letter No. 22786
dated 27.12.2021 and O.M. No. 15847/W dated 19.11.2019 & O.M. No. 8189/W
dated 07.06.2021 of GoO works Department. As such, you are requested to follow
O.M. No. 15847/W dated 19.11.2019 of GoO Works Department retrospectively from
07.07.2012 in respect of all ongoing Rural Piped Water Supply Projects.
All the stipulations made in Letter No. 22786 dated 27.12.2021 of Govt. in
PR&DW Department and O.M. No. 15847/W dated 19.11.2019 & O.M. No. 8189/W
dated 07.06.2021 of Works Department are to be followed strictly and the following
percentage breakup shall be followed towards price adjustment.
| Item _
Component Water Supply Works —
Pipeline work Structural works
Labour (PL) %e — 6
‘Cement (PC) Nil 20%
Steel (PS) Nil 20%
Bitumen (PB) ___Nil
Pipe (PP) 0% - Nil
Fuel and lubricants (PF) 3% 3%
Other Materials (PM) 20% 30%
ing machinery and spares. a 20%
Total 100% 100% }
You are, therefore, requested to take necessary action regarding price
‘Adjustment in works contract as per the above provisions prescribed by the Works
Department.Enel:
e 1. Letter No. 22786 dated 27.12.2021 of Govt. in PR&DW Department
2. O.M. No. 15847/W dated 19.11.2019 of Works Department and
3. O.M. No. 8189/W dated 07.06.2021 of Works Department.
cai
1. Chief Engineer-I/ Chief Engineer-II for kind information.
2. Copy to file No. WSSO-WQ-01(Part-1)2010-19.Fai Gal AAGIA ce reas ae
= = abooa nd george -28teoe
aaINS aie 6 ainia ee Faia
Odisha Lokseva Bhawan
7 - GOVERNMENT OF ODISHA ‘Sachibalaya Marg, Bhubaneswar-751 001
\ PANCHAYATI RAJ & DRINKING WATER. a
DEPARTMENT
27 12 /rdoa!
Shri B.Parameswaran,IAS,
Director, DW&S-cum-Additional Secretary to Govt.
To
The Engineer-in-Chief, RWS&S,
Odisha, Bhubaneswar.
Sub: Codal/ Contractual provisions regarding Price Adjustment in Works Contract-
clarification on applicability of Works Department 0.M. No.15847/W, dated
19.11.2019 in place of the conditions agreed upon by the agencies in the clause
No.19.10 (DA) of the existing agreement.
Sir,
In inviting a reference to your letter No.8140 dated 29.09.2021 on the subject
cited above, | am directed to say that the Price Adjustment clause due to increase or
decrease in rate and price of Labour, Materials, Fuels & Lubricants and Plant and
Machineries, Spare Components issued vide Works Department 0.M.No.15847/W,
dated 19.11.2019 will be effective for the period retrospectively from 07.07.2012 to
18.11.2019 in respect of all ongoing Rural Piped Water Supply Projects as per Works
Department 0.M.No. 8189/W, dated 07.06.2021 subject to following stipulations:
1. Administrative Department will have complete proof _ (including
documentary proof) for cost escalation in terms of actual work done.
Il. Acertificate has to be signed by competent authority, if delay is not due to the
actions of contractor concerned
IIL If there are avoidable administrative delays, responsibility has to be fixed on
Government Servants concerned for cost escalation and a consolidated Action
‘Taken Report in this matter be submitted to Finance Department.
You are, therefore, requested to take necessary action regarding Price
‘Adjustment in Works Contract as per the above provisions prescribed by the Works
Department.
Yours faithfully,
|
Director, DW&S-cum-Addl SecretaryGOVERNMENT OF ODISHA
WORKS DEPARTMENT
OFFICE MEMORANDUM
No.07556900242019-_ SB \ Sey M., dated “J. L- a\
Sub:- Codal /Contractual provisions regarding Price Adjustment in Works
Contract.
Codal / Contractual provisions regarding Price Adjustment in Works Contract
was under active consideration of Government for some time past. After careful
consideration, Government was pleased to make the codal /contractual provisions:
regarding Price Adjustment Clause due to increase or decrease in rate and price of
Labour, Materials, Fuels & Lubricants and Plant and Machineries, Spare
Components vide Works Department Office Memorandum No.15847/W dated
19.11.2019, which was effective from the date of issue of the said Office
Memorandum.
2. Now, in continuation of this, Government have been pleased to order that
the Price Adjustment clause due to increase or decrease in rate and price of Labour
Materials, Fuels & Lubricants and Plant and Machineries, Spare Components issued
Vide Works Department O.M. No.15847/W dated 19.11.2019 will be effective for the
period retrospectively from 07.07.2012 to 18.11.2019 subject to the following
stipulations;
i Administrative Department will have complete proof (including
documentary proof) for cost escalation in terms of actual work done.
ii. A certificate has to be signed by competent authority, if delay is not due to
the actions of contractor concerned.
iii, If there are avoidable administrative delays, responsibility has to be fixed
on Government Servants concemed for cost escalation and a
consolidated Action Taken Report in this matter be submitted to Finance
Department.
3. This has been concurred in by Finance Department vide their OSWAS File
No. FIN-WF1-MISC-0031-2019.
By “ of Governor
(Or. Krishan Kumary 7:
Commissioner-cum-Secretary to Govt.wemone_ “So VAS _M, dated “AG: 24
Copy forwarded to Private Secretary to Hon'ble Chief Minister, Odisha for Kind
information.
Ss 272)
FA-cum-Additional Secratary folGovt
Memo No.__&1\' Mv, dated “G24
Copy forwarded to Private Secretary to Hon'ble Minister, Works, Steel &
Mines, Odisha/ Private Secretary to Hon'ble Minister, Finance, Odisha for kind
information.
FA-cum-Additional Secretary td Govt
Memo No__3 \ V2 WW, dated A> Gy
Copy forwarded to OSD to Chief Secretary, Odisha/ Sr. P'S. to Development
Commissioner-cum-Additional Chief Secretary, Odishal Sr P.S. to. Principal
Secretary, Finance Department for kind information of Chief Secretary, Odisha
Development Commissioner-cum-Additional Chief Secretary, Odisha and Principal
a.
FA-cum-Additional Secretary Bebe
Memo No__&\ AS M., dated. “+ >
Copy forwarded to the Principal Accountant General (A&E), Odisha.
Secretary, Finance Department
ar|
Bhubaneswar/ Principal Accountant General (E & RSA), Odisha, Puri Branch, Puri
for information and necessary action.
FA-cum-Additional Secretary fo Govt
Memo No._ S\AY MW. dated“ & Dy
Copy forwarded to All Departments of Government! Managing Director.
OB&CC Ltd., Bhubaneswar! Managing Director. OCC Ltd, Bhubaneswar/Chief
Architect, Odisha, Bhubaneswar for information and necessary action
Sel a ghana
FA-cum-Additional Secretary to|Govt.
Memo No._&\AS IW., dated » Ee Sy
Copy forwarded to EIC (Civil), Odisha/All Chief Engineers, Odisha/All
Superintending Engineers/All Executive Engineers (under Works Department) for
information and wide circulation among subordinate offices.
E
om
FA-cum-Additional cecal abe3
Memo No._& Vek W., dated. 4&6 2)
Copy forwarded to OSWAS Control Room with a request to upload it in the
web-site of Works Department. met oho
FA-cum-Additional Secretanyld Govt |
Memo No. %& \ St MW, dated “y+ & 24
Copy forwarded to the Director, Printing, Stationary & Publication, Odisha
Cuttack by e-mail (deputydirectorpp@redifmail.com) for publication of this Office
Memorandum in the next issue of Odisha Gazette and supply 20 (Twenty) copies to
this Department for official use. mpg k ‘
FA-cum-Additional Secretary to’ ad) :
Memo No.__S \A% _W., dated. “A-_& + >)
Copy forwarded to Accounts-| Section/Accounts-II Section/Road Section/Plan
Section/Building Section/Budget _Section/NHs_Section/FC&AA —Section/EAP.
Cell/Legal Cell, Works Department for information and necessary action.
ae)
FA-cum-Additional Secretary fo bowe
GOVERNMENT OF ODISHA
WORKS DEPARTMENT
OFFICE MEMORANDUM
File No. -07556900242019- [BEY ~, a. 19-/) fF)
‘Sub:- Codal / contractual provisions regarding Price Adjustment in works contract
Codal / contractual provisions regarding Price Adjustment in works contract
was under active consideration of Goverment. After careful consideration,
Government have been pleased to make the codal/ contractual provisions regarding
Price Adjustment clause due to increase or decrease in rate and price of labour,
‘materials, fuels & lubricants and plant & machineries spare component to be
incorporated in DTCN / condition of Contract as per Annexure-“A’.
1- This Office Memorandum shall be a part of the relevant clauses of DTCN
and Agreement and shall take effect from the date of issue.
2. This has been concurred in by Finance Department vide their File No.
FIN-WF1-MISC-0031-2019 (OSWAS) dt.23.10.2019 and Law Department
vide their UOR No.2218/L dt-29,10.2019.
ral
Commissioner - cum- Set Government
Memo No. / SY ux MM, dated, —// alG
Copy with copy of enclosure forwarded to Principal Secretary to Hon'ble Chief
Minister, Odisha for information and necessary action.
Sewer yar
FA- cum- Addl. Secretary to Government
Memo No. / 5 eug Ww, dates, 2) -/)-19
Copy with copy of enclosure forwarded to P. S. to Hon't
Odisha / P. S. to Hon'ble Minister, Finance, Odisha for inform:
action.
‘ble Minister, Works,
ration and necessary
Crea 1a MAG
FA- cum. Addl. Secretary to Government
(P74)
Scanned with CamScanners - ates, 11 Ne-l4 -
memono. 5 X50 mw ae ‘sp to Chief Secretary, Oaisha /
Ceny with copy of enlnure forded 12 OSD aha Se:
ecessary
. a conmmsener
PS. to Principal Secretary, Finance Department
* action eyettett
FA-cum- Aedi. Secretary to Government
wanons. [FES | mda, 14-1) “19
Copy with copy of enclosure forwarded to the Principal Accountant ‘General
(ABE), Odisha, Bhubaneswar / Principal Accountant General (E & S R Audit)
‘Odisha, Puri Branch, Puri for information and necessary action.
perry etd
FA-cum- Addi, Secretary to Government
Memo No. JB ESS 2 m, dated, /9) -/1 JF
Copy with copy of enclosure forwarded to All Departments / Managing
Director, OB & CC Ltd., Bhubaneswar / Managing Director, OCC: Ltd., Bhubaneswar
1 Chief Architect, Odisha, Bhubaneswar for information and necessary action.
eas
FA-cum- Addl. Secretary to Government
Meme No, /FS 5S , dated, 19 —/} -/G
Copy with copy of enclosure forwarded to EIC (Civil), Odisha / Ali Chief
Engineers, Odisha / All Superintending Engineers / All Executive Engineers (under
Works Department) for information and wide circulation among subordinate offices,
yet
FA-cum- Addl. Secrdtary to Government
memo wo. SS Y MW, dated, 19) — |] “19
Copy with copy of enclosure forwarded to OSWAS Control Room with a
request to upload it in the web-site of Works Department,
es tee | 4.
FA-cum- Addl. Secratary to Government
(P To)
Scanned with CamScanner*
memo no. SSSI 1m, dated, [9] - J “19
Copy with copy of enclosure forwarded to the Director, Printing, Stationary &
Publication, Odisha, Cuttack by e-mail (deputydirectorpp@redifmail com) for
Publication of this Office Memorandum in the next issue of Odisha Gazette and
‘supply 20 (Twenty) copies to this Department for official use.
perry aiess
FA-cum- Addl. Secretary to Government
memoNo. JISAES mM, dates, 19 —/) 9
Copy with copy of enclosure forwarded to AIC-| Section / AIC-II Section /
Road Section / Plan Section / Building Section / Budget Section / N.H5. Section / FC
& AA Section / EAP Cell / Legal Cel, Works Department for information and
Sheet 9
FA-cum- Addl. Secretary to Government
Scanned with CamScannerClause 31 ;- Price Adjustment
31.1: Contract price shall be adjusted for in
price wit
of labour, materials, fuels and lubricants in accordance
mula given in following Paras.
crease or decrease in rates and
th the following
principles and procedures and as per fo reid
(2) The price agjustment shall apply for the work dane rom the start date give
contract data up to end ofthe intial intended compltion date or extensions granted
by the Engineer and shall not apply to the work cerried out beyond the stipulated time
{or reasons attributable to the contractor.
(®) The price adjustment shall be determined during each month from J
given in folowing Paras
(6) Following expressions and meanings are assigned to the work done during each
month:
the formula
Re Total value of work done during the month, It would include the amount
of secured advance granted, if any, during the month, less the amount
of secured advance recovered, if any during the month. It will exclude
value for works executed for extra items under variations.
31.2: To the extent that full compensation for any rise or fall in costs to
the contractor is not covered by the provisions of this or other
clauses in the contract, the unit rates and prices included in the
contract shall be deemed to include amounts to cover the
contingency of such other rise or fall in costs
The formula (e) for adjustment of prices are:
Vinw
Vu =
Mo=
Me
Pm
1stment of Other Materials Component
Price adjustment for increase or decrease in cost of local
materials other than cement, steel, bitumen , pipe and POL
procured by the contractor shall be paid in accordance with the
following formula:
0.85 x Pr 100 x Rx (My- Ma)/Mg
Increase or decrease in the cost of work during the month under
consideration due to changes in rates for local materials other
x
than cement, steel, bitumen and POL. e
‘The all India wholesale price index(all commodities) on 28 days
preceding the date of opening of Bids, as published by the
Ministry of Commerce and Industry Government of India, New
Delhi.
The all India wholesale price index (all commodities) for the
month under consideration as published by the Ministry of
Commerce and Industry , Government of India, New Delhi
Percentage of local material component (other than cement,
steel, bitumen and POL) of the work.
=(e-T
lean y
Scanned with CamScannerAifa}lii): Adjustment for Cement Component
Price adjustment for increase or decrease ir the cost of cement
procured by the contractor shall be paid in siccordance with the
following formula:
Vex 0,85 x Pe100 x Rx (Cr+ Colo
Ve = Increase or decrease in the cost of work dur ng the month under
consideration due to changes in the rates fo" cement
Co= ‘The all India wholesale price index for Ordinary Portland
Cement (OPC) on 28 days preceding the date of opening of
Bids as published by the Ministry of Commierce and Industry ,
‘Government of India, New Delhi
Cy The all India wholesaie price index for Ordinary Portland
‘Cement (OPC) for the month under considaration as published
ay the Ministry of Commerce and Industry, Government of
India, New Delhi
Po= Percentage of Cement Component of the wark
34(a)iii); Adjustment for Steel Component
«iy Price adjustment for increase or decrease in the cost of steel
procured by the contractor shall be paid in accordance with the
following formula:
Vee 0.85 x Px/100 x R x (St- So)/So
Vs = Increase or decrease in the cost of work during the month under
consideration due to changes in the rates for steel
So: The ail India wholesale price index for steel (Mild Stee! long
Products) on 28 days preceding the date of opening of Bids as
published by the Ministry of Commerce and Industry
Government of India, New Delhi.
‘Si. The all India wholesale price index for steel (Mild Stee! long
Products) for the month under consideration as published by the
Ministry of Commerce and Industry, Government of India, New
Dethi.
P,= Percentage of steel component of the work
‘Note: For the application of this clause, index of (Mile Steel long products)
has been chosen to represent steel group
Scanned with CamScanner34(a)(iv): Adjustment of Bitumen Component
Price adjustment for increase or decrease in the cast of bitut
shall be paid in accordance with the following formula:
Vex 0.85 x Py/100 x R x (B1- Bol/Bo
p= Increase or decrease in the cost of work during the month under
consideration due to changes in the rate for bitumen.
Bo. The official retail price of bulk bitumen at the 1OC / BPCL depot at
nearest center on the day 28 days prior to date of opening of Bids.
B, = The official retail price of bulk bitumen at IOC / BPCL depot at
nearest center for the 15th day of the month under consideration.
men
Py = Percentage of bitumen component of the work
ost of Pipe:
31(a\v): Adjustment towards diffore
Price adjustment for increase or decrease in the cost of pipe shall
be paid in accordance with the following formula:
Vpix 0.85 x Pp/100 x R x (Pi1- Pa)/Pio
Ve = Differential cost of pipe ie. amount of increase or decrease in
rupees to be paid or recovered during the month under
consideration.
Pp= Percentage of pipe component of the work
Pi = All India Whole sale price index of pipe for the period under
consideration as published by the Ministry of Commerce and
Industry , Government of India, New Delhi. e
Po» All India Whole sale price index of pipe on 28 days preceding the
date of opening of Bids as published by the Ministry of Commerce
and Industry , Government of India, New Dethi
“heen
(eu. cg
Scanned with CamScannersemen 6 Qposemnmes uses vomits
‘3Alb): Adjustment of Labour Component
Price adjustment for increase or decrease: in the cost due to
labour shall be paid in accordance withthe ‘ollowing formula
Vex 0.85% P/100 x R x (Lim Laie
Increase or decrease in the cost of work during the month under
consideration due to changes in rates for loval labour.
Lo. The minimum wages for unskilled labour as Notified by
Government of Odisha as prevailed on the last stipulated date
of receipt of tender including extension, if any.
Ly = The minimum wages for unskilled labour as Notified by
Government of Odisha as prevailed on the last date of the
Month previous to the one under considerat;on
P,.. Percentage of labour component of the work.
31(c): Adjustment of POL(fuel and lubricant) Component
“ Price adjustment for increase or decrease in cost POL(fuel and
lubricant) shall be paid in accordance with the following formula
Vex 0.85 x P10 x R x (Fi- Fo)/Fo
Vi Increase or decrease in the cost of work during the month under
consideration due to changes in the rales for fuel and
lubricants.
Fo= The official retail price of High Speed Diesel (HSD) at the
‘existing consumer pumps of IOC | BPCL/ HPCL at nearest
center on the day 28 days prior to the date cf opening of Bids.
The official retail price of HSD at the existing consumer pumps
of IOC / BPCL/ HPCL at nearest center for the 15th day of the
month under consideration,
P= Percentage of fuel and lubricants component of the work
Note For the application of this clause, the price of High Speed Diese!
11 has been chosen to represent fuel and lutricants group.
Sheer
sgh
8
Scanned with CamScanner= 1(6); Adjustment for Plant and Machinory Spares Component
Note
the cost of plant
i ri 1: decrease in t
w Price adjustment for increase 0 ra bs aed
and machinery spares procured by the Contract
in accordance with the following formula
Vor 0.85 x Pp/100 x R x (P3- Pol/Po
Vr Increase or decrease in the cost of work
tunder consideration due to changes in the ral
machinery spares
Po. The all India wholesale price index for manufacture
machinery for mining, quarrying and construction on 28 days
preceding the date of opening of Bids as published by the
Ministry of Commerce and Industry , Government of India, New
Dotti
P,. The all India wholesale price index for manufacture of
machinery for mining, quarrying anid construction for the month
under consideration as published by the Ministry of Commerce
and Industry , Government of India, New Dethi
Pye Percentage of plant and machinery spares component of the
work
For the application of this clause, index of manufacturing of machinery for
mining, quarrying and construction.has been chosen (o represent the Plant
and machinery Spares group.
during the month
ites for plant and
of
Regarding wholesale price Index (WPI) for appropriate commodity for
payment of price adjustment, due to change of base year of WP! from 1993-
94 to 2004-05 & 2011-12, it is observed that, the commodity “Bars and Rod’,
‘Cement’, ‘Heavy machinery and parts’ included in the list of WPI 1993-94
seties are not mentioned as such in the WPI 2004-05 & 2011-12 series.
Therefore, the following items in the WPI 2004-05 & 2011-12 series shall be
considered corresponding to items in WPI 1993-94 series
SL] am in WPT 1993-94 | Item in WPI 2004-08 | Item in WPI 2011-12 |
No, series series series
7 Cement Grey Cement ‘Ordinary Portland
cement
z Bars & rods Rebars Mild steel tong
products
3] Heavy Machinery & | Construction Machinery [~~ Manufacture of |
parts machinery for mining,
quarrying &
‘construction.
Stene
Yaa,
—al
Scanned with CamScannersa ree
31(e): APPLICATION OF ESCALATION CLAUSE;
of differential
‘The contractor shall for the purpose of availing rei nbursemenvrefund
Cost of steel, bitumen, cement, pipe, POL and wages, Keep such books
OF account and other documents as are neces
sary to show that the amount of
'norease claimed or reduction available and shail allow inspection of the same by a
duly authorized representative of Government and further. shall atthe request of the
Engineer-n-Charge, furnish documents to be verified in such a manner as the
Engineer-in-Charge may require any document and information kept. The contractor
shall within a reasonable time of 15 days of his becoming aware of any alteration in
the price of such material, wages of labour and /or price of P.O.L. give notice thereof
{to the Engineer-in-Charge stating that the same is given pursuant to this condition
along with information relating to there to which he may be in a position to supply,
Percentage Table
‘SINo. | Category of works % Component (cost wise)
Tabour [POL | Steet (P+ Cement
(Pi) (Pd (P.)+* Bitumen (P,)
+Pipes (Pq) + Plant &
Machinery Spare
&Component(P,) +
‘Other Materials
: Road Works 5 & 90
= & [Bridge wons = 5 30
#85 § dq Buena wore 5 5 3
z | Structural work 5 5 Ca
se b
Ze & [Earth Cane S715 o
BS _E | Embancment work ve -
Efs8q .
3 P.H. Work | Structural work 5 s ‘90
[Pipeline Werk aa) Pipe 70% 7
= | “Machinery + Other
= L |__material -20%
| Sewer Line Ss 5 T Pipe- 70%
“Machinery + Other
material -20%
“Note:- Further break up may be worked
Cement, Steel, Bitumen, pipe and Plant &
‘ut considering the consumption of
Machinery Spare Component in the
Concerned works and shall be provided in the bid document ir shape of “Schedule
of Adjustment Data” as an “Appendix to Bid”
"(enclosed herewith)
Veneta
Scanned with CamScanner- Appendix to Bid
‘Schedule of Adjustment Data
[For all works, adjustment factor for Labour and POL shall be considered @ 5% e
each. Steel, Cement, Pipes, other Materials and Machinery shall contribute to 90%
of Price Adjustment and shall be calculated for each work separately during
preparation of estimate, shall be approved by the authority during technical sanction
asa "Schedule of Adjustment Data" and shall form part of the Bid Document]
( CiNo- > index Source of index Base Base (Weighta
31 of | descripti | j value* - Date” \ge of
ryp1{| on | | ‘items
| contrac '
[ssn | | | |
No { | _
AI india Whole sale price index (all| 1
ter [eommodities) as published by the) |
131 (a0 | yoinetig [Economic Advisor to the Govt. of] |
| {indi
Ministry of Commerce and |
i L Industry. |
{37 Ta)G [Cement | Woie sale price index for Cement —
| (Orcinary Portland Cement) 25 | !
' | published by the office the Economic
} | Advisor to the Govt. of India, Ministry | |
| of Commerce and Industry. ree
31 [Steet [Whole sale price index for Stee! (id | |
canis | Steel-Long Products) as published by i |
the office of the Economic Advisor to
i the Govt. of India, Ministry of
| Commerce and Industry.
31 ‘Bitumen — | Official retail price of bulk bitumen at
(2)()_{(VG-30) _jthe nearest |OC/ HPCL depot___ |
ice index for the ype of
31 (a)(v)|Pipes | Whole sale
Pipe under consideration, as!
published by the office the Economic |
‘Advisor to the Govt. of india, Ministry | j
‘of Commerce and Industry. i
31 (6) [Labour {Minimum Wage notified by the
i Labour and Employee's State!
| Insurance Department of Government |
lof Odisha, India 1
34 (e) [POL (Official retail price of HSD at nearest |
1OCU HPCL BPCL Consumer pump |
depot.
| 31(@) [Plant and|Wnole sale price index — for
|Machinery | Manufacture of Machinery for Mining,
}Quarrying and Construction as |
‘published by the office the Economic i
Advisor to the Govt. of India, Ministry
_____of Commerce and industry.
3%
+
|
|
1.
|
i
|
T00%
= Values to be filled up at the time of drawl of contract
“*Values to be filled up in the bid document.