Merged - 2023-01-27 00 - 24 - 20 +0000 - Compressed
Merged - 2023-01-27 00 - 24 - 20 +0000 - Compressed
Dega: Arkitekture
Viti III
DETYRE KURSI
Lenda: Teknik Kantieri
Analizes
NR /Man Pershkrimi i punimeve Njesia Sasia Çmimi Vlera
A. PUNIME PRISHJE
1 2.426 Prishje mur tulle pa pastrim m3 32 620 19,840
Shuma A Leke 19,840
B. PUNIME NDERTIMI
1. PUNIME DHEU
Shuma 1 Leke 0
2. PUNIME BETON ARME
Shuma 2 0
3. PUNIME MURATURE
1 2.70/2 Mure tulle I lehtesuar t=25 cm m3 35 7950 278,250
Mur me tulle me 6 vrima, t=12cm, h~3m, llaç perzier
2 2.86 m3 16 9017 144,272
M15
Shuma 3 Leke 422,522
4. PUNIME HIDROIZOLIMI (mbulese)
2.197 Hidroizolim me emulsion bitumi dhe 2 shtrese k katrama m2 116 1232 142,879
PERSHKRIMI I PUNIMEVE 1 2 3 4 5 6 7 8 9 10 11 12