You are on page 1of 3

Non-configured print.

Valid only on 2023-05-23


AP 1018-5301-5G
Edition1
EDDYCURRENT No 25
TECHNIQUE

THISTECHNIQUE
MUSTBE CARRIED
OUTBY A NDTTECHNICIAN.

1 Technique.SENTRY/EDD/2S

2 to be examined.Frame6OOK(Fig1).
Component

3 Areato be examined.Leftand rightmainplaneattachment


fittings(Fig1).

4 Pumoseof examination.Conductivity
check.

5 Equipment
required.

HockingAutoSigma3000DLtestset 4XE2139O44

6 Preparation.

6.1 Ensureaircraftis preparedin accordance instructions.


with relevantmaintenance

6.2 Ensurethatthe lowerleadingedgepanelsare removedfor access.

6.3 Ensurethe examination andfreefrom


areahasbeenthoroughlycleaned,degreased
jointingcompound, PRCandflakingpaint(seeAdditional
lnformation
11.1).

6.4 of the AutoSigma3000DLtestset (Operators


Carryout a beforeuseexamination Manual
refers).

Examination
orocedure.

7.1 InstrumentCalibration.

7.1.1 Connectthe probeandleadto the testset,sryitchon andallowsetto stabilise


(seeAdditionalInformation
11.2).

7.1.2 Press'MENU'keyandensurethe frequencyis setto 60 kHzand unitsareset


to IACS.Press'MENU'keyto exitthe parameters
menu.Pressthe'SET'keyto initiate
probesetting.

7.1.3 Withthe probein air,pressthe 'SET'key andwaitfor the sounderto 'beep'.

7.1.4 Placethe probeon the metalstandardSTD 1 and pressthe 'SET'key,waitfor


thesounderto 'beep'.

7.1.5 Placethe probeon the metalstandardSTD2 and pressthe 'SET'key,waitfor


the sounderto 'beep'.Thetestset calibration
sequenceis nowcompleteandwill
automaticallyreturnto the thicknessmeasurementmode.

7.2 Procedure.

7.2.1 Placethe probesquarelyon the forwardfaceof the UH fittingandnotethe


reading.

7.2.2 Repeat7.2.1overseveraldifferentareas,at 50 mm intervals,notingthe


readings.

7.2.3 Repeat7.2.1to7.2.2on the rearfaceof the UH fittingas muchas accesswill


permit.

Section4
Feb 08 (Amdt 6) Page1 of3
Non-configured print. Valid only on 2023-05-23
AP 1018-5301-5G SENTRY/EDD/25
Edition,l

7.2.4 Repeat7.2.1.1o
7.2.2on the outboardedgeof the UH fitting.

7.2.5 Repeat7.2.11o7.2.4
onthe R/Hfitting.

NOTE
The conductivity STD1andSTD2areto be re-checked
of the metalstandards
every15 minutesto ensurecorrectinstrument
calibration.

Examination
standard.

8.1 All readingsareto be reported.

8.2 Ensurethe percentage


IAGSis in the range38%to 42.5o/o
lor 7075-T73
material.

9 Reportinqprocedure.ln accordance instructions.


withcunentmaintenance

1 0 Estimatedman-hours.t hour,examination
only.

1 1 Additionalinformation.

11.1 All conductivity measurements areto be takenthroughthe paintcoatingunlessremovalis


specifiedin the maintenance Any readingsobtainedthat are notwithinthe specified
instruction.
limitsshouldbe re-measured withthe paintcoatingremoved.Measurements canbe madethrough
layersof paintor othernon-conductivecoatingsup to a thicknessof 0.5 mm.

1'1.2 lt is importantthatthe referencestandadsandthe probeare at the sametemperature as


the itemundertest. lt is alsoadvisableto allowthe setto warmup for a periodof 5 minutes
beforeuse.

12 Validation.ThistechniqueformalisesWADDINGTON/SENTRY/INFUEDD|9I4
whichwas
aevei6iE,IiiGircraftzH1os.

Section4
Page2 of 3 Feb 08 (Amdt6)
Non-configured print. Valid only on 2023-05-23
SENTRY/EDD/25 AP 1018-5301-5G
Edition1

AREAOF INTEREST

Fig 1 Areaof interest,left andright600Kmainplaneattachment


fittings

Section4
Feb 08 (Amdt 6) Page3 of 3

You might also like