You are on page 1of 1

Necessay Propping for Cantilever Slab

Slab Thickness Design Live Load Finishing Load Porpping Qty.


Layer Location 2
mm kpa kpa Nos/mm
Concourse Hotel Tower 350 2.5 1.8 1
Concourse Office Tower 300 2.5 1.8 1
P1 Level Hotel Tower 350 2.5 1.8 1
P1 Level Office Tower 300 2.5 1.8 1
P2 Level Hotel Tower 300 2.5 1.8 1
P2 Level Office Tower 300 2.5 1.8 1
P3 Level Hotel Tower 400 2.5 1.8 1
P3 Level Office Tower 300 2.5 1.8 1

Note :
(1) Cantilever slab shall provide propping within 1.5m from edge after removed formworks.
(2) Propping area refer to enclosed sketch.

You might also like