QUALITY INSPECTION REPORT

PROJECT TITLE Laptop Bag out from coffee PROJECT Angelika Macasero
sachets MANAGER
PROJECT SPONSOR Eng. Ace Mari Simbajon PROJECT TEAM Group 2 BSIE 2-F
NUMBER OF UNITS 20 Laptop bags QC INSPECTOR Ma. Erica Amahan
PRODUCT DESCRIPTION
Laptop bags are made out of 80% of recycled coffee sachets that are weaved and enfold with plastic-wrap.
To attain comfort and safety for the device, foam board are inset and secured with slider. The laptop bag has
the average dimension of 15 x 3 x 12.

DIMENSIONAL/ SIZES INSPECTION

Dimensions (inch)
Product REMARKS
Ref. Length Depth Height

LB1 12.5 2.7 12


LB2 15 2.7 12.5 LB with larger sizes are designed
for sizable laptops
LB3 14.7 2.5 13
LB4 14.5 2.6 12.7
LB5 15 2.5 12.9
LB6 15 2.5 13
LB7 14.8 2.7 13.1
LB8 14.6 2.8 12.7
LB9 15.1 2.5 12.5
LB10 13.9 2 11 LB with smaller dimensions are
intended for compacted laptops
LB11 13.7 2 10
LB12 13.4 2 10.6
LB13 13.6 1.9 10.5
LB14 14 2.1 10.2
LB15 13.7 2 10.2
LB16 13.5 2.2 10.8
LB17 13.9 2 10.5
LB18 14 2 9.8
LB19 13.7 2.3 10.2
LB20 13.9 2.6 10
LB21 14 2.4 9.5
ON-SITE TEST

Product APPEARANCE STRENGTH TESTS


Ref. Remarks Remarks Water Remarks
Neatness Texture (1-4) No. lifted Handle Proof
kg repetition firmness test
LB1 The surface The Weaved strips
was full of handle are detached,
× × adhesive’s 4 kg 10 × loosens × and an aperture
excess and after half has formed,
the texture of the resulting to
was jagged repetition water leakage
LB2   4 kg 10  
LB3   4 kg 10  
LB4   4 kg 10  
LB5   4 kg 10  
LB6   4 kg 10  
LB7   4 kg 10  
LB8   4 kg 10  
LB9   4 kg 10  
LB10   4kg 10  
LB11   3 kg 10  
LB12   3 kg 10  
LB13   3 kg 10  
LB14   3 kg 10  
LB15   3 kg 10  
LB16   3 kg 10  
LB17   3 kg 10  
LB18 ×  Adhesive’s 3 kg 10  
residue
wasn’t
removed
LB19   3 kg 10  
LB20 ×  Smudge 3 kg 10  
from the
adhesive
was not
remove
LB21   3 kg 10  

PRODUCT STATUS
Product Ref. PASSED DEFECT REMARKS
LB1  Product LB1 failed essential on-site
assessments, particularly the water
proof test and appearance inspection,
in which even an alteration is
ineffective; therefore, the project team
considered it a defect item.

LB2 
LB3 
LB4 
LB5 
LB6 
LB7 
LB8 
LB9 
LB10 
LB11 
LB12 
LB13 
LB14 
LB15 
LB16 
LB17 
LB18 
LB19 
LB20 
LB21 

You might also like