1 July 26, 2021 Batu Palu 10 Bucket, 2 Rit DT

2 July 26, 2021 Backcharge Heavy Equipment (SMP EX-25)

3 July 26, 2021 Fuel Backcharge

Grand Total ( Inc. VAT 10%)

Note :
Total Harga diatas akan dideduction di invoice PT. BDE Periode 21 Agustus- 20 September 2021.
Harga diatas akan dideduction dengan menggunakan debit note (harga Include VAT)
Spec Satuan Ukuran Qty Price Sub Total
(termasuk VAT
10%)

m3 20-30 mm 20.00 IDR 269,500.00 IDR 5,390,000

EX PC 210 Hour 0.90 IDR 225,000.00 IDR 202,500

16.8 Ltr/Jam Liter 15.12 IDR 9,137.97 IDR 138,166

IDR 5,730,666