Lapangan Volley Classic Schedule Layout 26-Jun-22 19:34

Activity ID Predecessors Successors Activity Name Original Start Finish Budgeted Material Budgeted Nonlabor Budgeted Labor Budgeted Total Cost Remaining Schedule % Total Float Q Qtr 3, 2022
Duration Cost Cost Cost Duration Complete
Jul
EC00001 La
Lapangan Volley
Vo 21 21-Jul-22 18-Aug-22 IDR2,950,000.00 IDR900,000.00 IDR3,295,000.00 IDR7,145,000.00 21 0% -21

EC00001.1 Land Clearing


Clea 13 21-Jul-22 08-Aug-22 IDR1,800,000.00 IDR900,000.00 IDR1,920,000.00 IDR4,620,000.00 13 0% -21
A1000 A1010 ratakan tanah 3 21-Jul-22 25-Jul-22 IDR0.00 IDR900,000.00 IDR720,000.00 IDR1,620,000.00 3 0% -21 ratakan
A1010 A1000 A1020 pasang rebar 2 26-Jul-22 27-Jul-22 IDR750,000.00 IDR0.00 IDR480,000.00 IDR1,230,000.00 2 0% -21 pas
A1020 A1010 A1030 pengecoran 3 28-Jul-22 01-Aug-22 IDR1,050,000.00 IDR0.00 IDR720,000.00 IDR1,770,000.00 3 0% -21
A1030 A1020 A1040 pengeringan 5 02-Aug-22 08-Aug-22 IDR0.00 IDR0.00 IDR0.00 IDR0.00 5 0% -21
EC00001.2 Pengacian
Pengacia & Pengecatan
Penge 5 09-Aug-22 15-Aug-22 IDR700,000.00 IDR0.00 IDR1,080,000.00 IDR1,780,000.00 5 0% -21
A1040 A1030 A1050 pengacian 2 09-Aug-22 10-Aug-22 IDR200,000.00 IDR0.00 IDR480,000.00 IDR680,000.00 2 0% -21
A1050 A1040 A1060 pengecatan 3 11-Aug-22 15-Aug-22 IDR500,000.00 IDR0.00 IDR600,000.00 IDR1,100,000.00 3 0% -21
EC00001.3 Finisihing 3 16-Aug-22 18-Aug-22 IDR450,000.00 IDR0.00 IDR295,000.00 IDR745,000.00 3 0% -21
A1060 A1050 A1070 pasang tiang net 1 16-Aug-22 16-Aug-22 IDR200,000.00 IDR0.00 IDR160,000.00 IDR360,000.00 1 0% -21
A1070 A1060 A1080 pasang tiang lampu 1 17-Aug-22 17-Aug-22 IDR150,000.00 IDR0.00 IDR120,000.00 IDR270,000.00 1 0% -21
A1080 A1070 pasang lampu 1 18-Aug-22 18-Aug-22 IDR100,000.00 IDR0.00 IDR15,000.00 IDR115,000.00 1 0% -21

Actual Level of Effort Remaining Work Milestone Page 1 of 2 TASK filter: All Activities
Actual Work Critical Remaining Work summary © Oracle Corporation
Lapangan Volley Classic Schedule Layout 26-Jun-22 19:34
Qtr 3, 2022 Qtr 4, 2022 Qtr 1, 2023
Aug Sep Oct Nov Dec Jan Feb
18-Aug-22, EC00001 Lapangan Volley

08-Aug-22, EC00001.1 Land Clearing


n tanah
sang rebar
pengecoran
pengeringan
15-Aug-22, EC00001.2 Pengacian & Pengecatan
pengacian
pengecatan
18-Aug-22, EC00001.3 Finisihing
pasang tiang net
pasang tiang lampu
pasang lampu

Actual Level of Effort Remaining Work Milestone Page 2 of 2 TASK filter: All Activities
Actual Work Critical Remaining Work summary © Oracle Corporation
Lapangan Volley All Resources 26-Jun-22 19:31
Resource ID Resource Name Resource Type Unit of Measure Primary Role Default Units / Time Price / Unit
Lapangan Volley Lapangan Volley Labor 8/d IDR0.00/h
L3 Boy Labor 8/d IDR0.00/h
M3 semen Material sak 8/d IDR0.00/sak
L1 Doni Labor 8/d IDR5,000.00/h
L2 Anto Labor 8/d IDR10,000.00/h
M1 besi Material square metre 8/d IDR10,000.00/m2
M2 pasir Material cubic metre 8/d IDR10,000.00/m3
M4 kerikil Material cubic metre 8/d IDR15,000.00/m3
M10 stamper Nonlabor 8/d IDR37,500.00/h
M5 Cat Hijau Material kaleng 8/d IDR100,000.00/kaleng
M6 Cat Putih Material kaleng 8/d IDR100,000.00/kaleng
M9 Lampu Material Each 8/d IDR100,000.00/ea
M8 Tiang Lampu Material Each 8/d IDR150,000.00/ea
M7 Besi Tiang Material Each 8/d IDR200,000.00/ea

© Oracle Corporation Page 1 of 1