You are on page 1of 4

BILL OF QUANTITY

PR NO 056/Gam/Site-Pro/IV/2023

ESTIMATE PRICE
NO DESCRIPTION SPECIFICATION / PN UOM QTY REMARKS (BASED ON PR)
UNIT PRICE AMOUNT
1 Taspen Listrik Masko Masko Ea 10 IDR 15,000 IDR 150,000 - Buat Maintenance Team Electrical Stone Crusher

2 Volt Meter Listrik TAB TAB Ea 10 IDR 100,000 IDR 1,000,000 - Maintenance Electrical dan Stock Spare Partch

3 Ampere Meter Listrik TAB TAB Ea 10 IDR 100,000 IDR 1,000,000 - Maintenance Electrical dan Stock Spare Partch

4 Mesin Steam H&L HLC 208 Mesin Cuci AC HLC 208 Unit 2 IDR 3,200,000 IDR 6,400,000 - Maintenance Electrical Pencucian AC

5 Thermometer Pengukur Suhu Ruangan - Ea 5 IDR 215,000 IDR 1,075,000 - Ruang Power House dan Area MCC

6 Sircover COS 100 A 4P Change Over Switch Sircover Ea 3 IDR 4,225,000 IDR 12,675,000 - Pemasangan Cos Office 32 dan Office 22

7 Sircover COS 630 A 4P Change Over Switch Sircover Ea 1 IDR 10,350,000 IDR 10,350,000 - Maintenance Panel COS Power House Crusher

8 Gunting Rumput Prohex 3 Posisi - Ea 2 IDR 192,700 IDR 385,400 - Perapihan Taman Office RCF

9 Gunting Rumput Pagar - Ea 2 IDR 125,500 IDR 251,000 - Perapihan Taman Office RCF

10 Photo Cell Sensor Cahaya AC 220 Volt/10 A - Ea 20 IDR 215,000 IDR 4,300,000 - Maintenance dan Stock Spare Partch

11 Busbar Sisir MCB 1 Phase dan MCB 3 Phase - Mtr 10 IDR 140,000 IDR 1,400,000 - Maintenance dan Stock Spare Partch

12 Busbar Tembaga Uk. 10 x 100 x 1000 mm - Mtr 3 IDR 2,150,000 IDR 6,450,000 - Maintenance dan Stock Spare Partch

13 Busbar Tembaga Uk. 3 x 50 x 1000 mm - Mtr 5 IDR 375,000 IDR 1,875,000 - Maintenance dan Stock Spare Partch

14 Bolt Baja Hitam 8.8 M20 X 250 mm Full Drat Baja Hitam 8.8 Ea 30 IDR 36,175 IDR 1,085,250 - Maintenance Crusher Jaw dan Stock Partch

15 Bolt Baja Hitam 8.8 M24 X 250 mm Full Drat Baja Hitam 8.8 Ea 20 IDR 48,900 IDR 978,000 - Maintenance Crusher Jaw dan Stock Partch

16 Mesin Bor DC Krisbow Ea 1 IDR 910,000 IDR 910,000 - Maintenance Team Electirical
BILL OF QUANTITY

PR NO 056/Gam/Site-Pro/IV/2023

ESTIMATE PRICE
NO DESCRIPTION SPECIFICATION / PN UOM QTY REMARKS (BASED ON PR)
UNIT PRICE AMOUNT
17 Mesin Gerinda Tangan Makita Ea 2 IDR 875,000 IDR 1,750,000 - Maintenance Team Mechanical dan Electrical

18 Pompa Air Shimizu PS 135 BIT Shimizu Ea 2 IDR 950,000 IDR 1,900,000 - Pemasangan Spray Crusher dan Tandon MCC

TOTAL IDR 53,934,650

REASON OF
USER:

Sempayau, 05 May 2023

Desi Mugito Lee hankyul Park Jeong Joon Hong Hyeong Ki


Admin Production SPV/SI Manager/GM Chief Operating Officer (COO) President Director (CEO)
BILL OF QUANTITY

PR NO 057/Gam/Site-Pro/IV/2023

ESTIMATE PRICE
NO DESCRIPTION SPECIFICATION / PN UOM QTY REMARKS (BASED ON PR)
UNIT PRICE AMOUNT
1 Panel Solar Cell 100 WP Poly / Solar Panel Polycrystalline Shinyoku Ea 10 IDR 879,000 IDR 8,790,000 - Pemasangan Water Fill STA 33, STA 20 dan
Stock Spare Partch
2 Controller Rr Electric Series SC - 60DD SC - 60DD Ea 5 IDR 3,250,000 IDR 16,250,000 - Pemasangan Water Fill STA 33, STA 20 dan
Stock Spare Partch
3 Battari ACCU Basah N 100 12V 100AH Yuasa Ea 6 IDR 2,175,000 IDR 13,050,000 - Pemasangan Water Fill STA 33, STA 20 dan
Stock Spare Partch
4 Air Accu / Air Aki Yuasa Yuasa Btl 50 IDR 13,000 IDR 650,000 - Pemasangan Water Fill STA 33, STA 20 dan
Stock Spare Partch
5 Kabel Surya 10 mm x 2 @ Warna Merah - Roll 3 IDR 4,200,000 IDR 12,600,000 - Pemasangan Water Fill STA 33, STA 20 dan
Stock Spare Partch
6 Kabel Surya 10 mm x 2 @ Warna Hitam - Roll 3 IDR 4,200,000 IDR 12,600,000 - Pemasangan Water Fill STA 33, STA 20 dan
Stock Spare Partch
7 Lampu LED Seri SA 7001 Fatro PJU Patro SA 7001 Ea 6 IDR 725,000 IDR 4,350,000 - Pemasangan Water Fill STA 33, STA 20 dan
Stock Spare Partch
8 Box Panel Out Door,2 Lantai Uk.70 x 50 x 30 cm - Ea 5 IDR 1,750,000 IDR 8,750,000 - Pemasangan Water Fill STA 33, STA 20 dan
Stock Spare Partch
9 Photo Cell AC/DC 12 V 10A - Ea 10 IDR 50,000 IDR 500,000 - Pemasangan Water Fill STA 33, STA 20 dan
Stock Spare Partch
10 Clam Accu N 100 Kuningan - Ea 20 IDR 13,500 IDR 270,000 - Pemasangan Water Fill STA 33, STA 20 dan
Stock Spare Partch
11 Connector Cable Tenaga Surya - Ea 20 IDR 9,000 IDR 180,000 - Pemasangan Water Fill STA 33, STA 20 dan
Stock Spare Partch
12 Tangga Lipat Krisbow 8/2.4 Meter Green Fiberglass Krisbow Ea 1 IDR 3,555,000 IDR 3,555,000 - Support Maintenance Electrical

13 Tangga Sorong PLN Fiberglass Sliding 3 Meter Krisbow Krisbow Ea 1 IDR 8,790,000 IDR 8,790,000 - Support Maintenance Electrical

14 Tangga Lipat Alumunium Uk. 1,2 Meter Alumunium Ea 1 IDR 485,000 IDR 485,000 - Support Maintenance Electrical

15 Silicon Red Siealant Red 650 Ea 30 IDR 17,500 IDR 525,000 - Maintenance Motor Crusher dan Stock Spare
Partch
16 Masker Carbon Filter Biasa Masker 3M Ea 50 IDR 23,000 IDR 1,150,000 - Support Team Operation dan Stock

17 Masker Carbon Filter Long Masker 3M Ea 50 IDR 27,500 IDR 1,375,000 - Support Team Operation dan Stock

18 Penggaris Besi Uk. 1.000 mm Joyko Ea 5 IDR 60,000 IDR 300,000 - Maitenence Welding

19 Ban Dalam Artco Uk. 3.50 / 3.25 / 3.00-8, 13x3 Artco Ea 10 IDR 30,000 IDR 300,000 - Maintenance dan Stock

20 Pengukur Tekanan Angin Compresor Tekiro Ea 2 IDR 125,000 IDR 250,000 - Maintenance dan Stock

21 Kaca Las Hitam No.11 Shade Ea 50 IDR 2,500 IDR 125,000 - Pemakaian Welding dan Stock Parcth

22 Torch Tip Cleaner Wire - O Cleaner Ea 15 IDR 33,000 IDR 495,000 - Pemakaian Welding dan Stock Parcth
BILL OF QUANTITY

PR NO 057/Gam/Site-Pro/IV/2023

ESTIMATE PRICE
NO DESCRIPTION SPECIFICATION / PN UOM QTY REMARKS (BASED ON PR)
UNIT PRICE AMOUNT
23 Body Harness Double Lanyard Eco Ea 5 IDR 306,000 IDR 1,530,000 - Maitenence Team Electrical dan Mechanical

24 House Pompa Grease Tekiro Ea 5 IDR 22,000 IDR 110,000 - Maintenance Motor dan Pulley Crusher

25 Sarung Tangan Las Kulit 15 Ich Deko Ea 15 IDR 67,500 IDR 1,012,500 - Pemakaian Welding dan Stock Parcth

26 Ear Plug Ultrafit Plug M3 Ea 50 IDR 23,000 IDR 1,150,000 - Support Team Operation dan Stock

TOTAL IDR 99,142,500

REASON OF
USER:

Sempayau, 05 May 2023

Desi Mugito Lee hankyul Park Jeong Joon Hong Hyeong Ki


Admin Production SPV/SI Manager/GM Chief Operating Officer (COO) President Director (CEO)

You might also like