The Costain Way Technical Query

DATE:
27-04-2023
Technical Query Form REF NUMBER:
TQ-103

Contract: M62 J25-30 DHS-ALR No.: 4090004 HE Pin: HE608073


TITLE: CCTV MAST ARM AND DOOR ORIENTATION

ANSWER REQUIRED BY: 02-05-2023

PREPARED BY: Carl Scrivens Agent/Senior Engineer

QUERY: The CCTV mast arm orientation is positioned to the verge to have the maintenance door downstream
so when the maintenance team are working on the camera, they are facing the traffic.

Does this impair the view of the CCTV when installed?

If the orientation of the mast has to change the maintenance hardstanding/paving will also have to be
changed to suit.

REVIEWED BY: P Snook Senior Agent/ Design Manager

RESPONSE / COMMENTS:

Approved Reviewed
× Issue to DED for information  DED approval required  Rejected

 RFI × TQ Class 1  TQ Class 2

DATE: 27/04/2023

SIGNED:

DESIGNER’S RESPONSE / COMMENTS (WHERE APPLICABLE):

Please refer to TQs 100 and 101. Extra slabs are to be provided.

 Approved  Approved with comments  Rejected

NAME: Mike Pearson POSITION: Design Manager, DED

DATE: 04/05/23
SIGNED:
DISTRIBUTION: Design Manager, Technology Manager, Senior Agents, Agents

HE608073-COS-GEN-WHL_AL_SCHME-TE-ZM-0001 Rev 4
The Costain Way Technical Query
CLOSEOUT (OSAP Design Manager/Senior Agent)

NAME: POSITION:

SIGNED: DATE:

HE608073-COS-GEN-WHL_AL_SCHME-TE-ZM-0001 Rev 4