YEAR 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00
2020-21
2019-20
27+300
Nandur vithal temple rd 27+400
27+900
28+200
28+400
30+000
ASHTI TALUKA
ASHTI CONSTITUENCY
SURFACE
6 V 1200 W=10.00
Wagluj bus stop
2 V 600 W=12.50
1 V 900 W=11.0
Sabale wasti
37+00 RUB
30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00
10.00
7.00
5.50
3.75
30+300
31+300
31+400
32+400
32+500
32+700
35+100
35+700
36+100
36+400
37+500
38+00
38+900
39+00
2) Strengthening
3) P.R.
1 V 1200 W=10.00
1 V 1200 W=10.00
Jain college
48+600
40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00
9.50
7.00
5.50
3.75
Baramati road
41+300
42+200
42+900
43+200
43+400
43+500
43+600
46+300
46+900
48+400
49+400
49+900
Present Condition Bad
Nature of Soil B.C. B.C. B.C. B.C. B.C. B.C. B.C. B.C. B.C. B.C.
Terrain Plain Plain Plain Plain Plain Plain Plain Plain Plain Plain
Existing BT Crust 50 mm
Existing WBM Crust 300 mm
2020 - 2021
2021 - 2022
2022 - 2023
2023 - 2024
2) Strengthening
3) P.R.
5 V 900 W=9.50
Chincholi road
HP pump
BP pump
50+00 51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00
9.50
7.00
5.50
3.75
50+500
51+500
52+900
53+200
54+00
54+600
54+900
56+100
57+00
58+200
59+400
59+500
59+600
60+00
Present Condition Bad Good
Nature of Soil B.C. B.C. B.C. B.C. B.C. B.C. B.C. B.C. B.C. B.C.
Terrain Plain Plain Plain Plain Plain Plain Plain Plain Plain Plain
Existing BT Crust 50 mm
Existing WBM Crust 300 mm
2) Strengthening
3) P.R.
YEAR 60+00 61+00 62+00 63+00 64+00 65+00 66+00 67+00 68+00 69+00 70+00
2020-21
2019-20
Sawargaon road
1 V 600 W=10.00
1 V 600 W=10.00
2 V 900 W=10.00
1 V 900 W=9.50
Pokhari road
60+00 61+00 62+00 63+00 64+00 65+00 66+00 67+00 68+00 69+00 70+00
10.00
7.00
5.50
3.75
60+100
60+200
60+700
60+900
62+900
63+100
63+800
64+500
67+400
67+700
68+100
68+900
69+200
70+00
ASHTI TALUKA
ASHTI CONSTITUENCY
SURFACE
Himalaya BP pump
71+300 BP pump
Sai HP pump
Rest house
IOL pump
BP pump
70+00 71+00 72+00 73+00 74+00 75+00 76+00 77+00 78+00 79+00 80+00
10.00
7.00
5.50
3.75
70+300
71+200
71+700
BP pump 72+500
73+300
73+500
75+500
75+600
75+800
78+400
2020 - 2021
2021 - 2022
2022 - 2023
2023 - 2024
2) Strengthening
3) P.R.
Sautada college
Dist. border
Rest house
80+00 81+00 82+00 83+00 84+00 85+00 86+00 87+00 88+00 89+00 90+00
10.00
7.00
5.50
3.75
80+700
81+900
Moha rd stone quarry 82+00
82+900
84+700
85+600
86+700
86+800
87+100
87+500
88+00
88+600
2016 - 2017
2017 - 2018
2018 - 2019
2019 - 2020
Proposed under Periodical Renewal programme 2020-21 year.
Proposed Sanctione Progress Complete
1) Widening
2) Strengthening
3) P.R.
Strip Chart :- Ahmednagar Kada Ashti Jamkhed Beed road NH-561, Section : Dist. border Ambhora to Beed (KM 27+300 to 144+500).
PLAN WORKS
YEAR 90+00 91+00 92+00 93+00 94+00 95+00 96+00 97+00 98+00 99+00 100+00
2020-21
10.00
INDEX
YEAR
7.00
HP Drain
2019-20
2019-20
2020-21
5.50
Arch Bridge
SURFACE
Dhappa Drain
3.75
90+00
100+00
2 Span 13.00 m W=18.20
91+00
101+00
Kolhewadi road 91+400
Junction
91+700 1 Span 19.00 m W=10.50
Slab Culvert
Major Bridge
Minor Bridge
2 Span 13.00 m W=11.80 91+900 ESSAR pump
Kuslamb road 92+00
92+00
102+00
92+200 4 Span 12.25 m W=7.50
Tamba-Rajuri Bus stop
ROB
PHC
Rest House
Petrol Pump
2 Span 1.00 m W=9.80
Vanewadi road 93+100
93+00
103+00
Stone crusher 93+300
104+00
2 Span 2.00 m W=10.10
Talepimpalgaon Bus stop
PLAN WORKS
Yewalwadi Bus stop Kuslamb road 95+100
95+00
105+00
2 Span 9.75 m W=11.90
PATODA TALUKA
ASHTI CONSTITUENCY
96+00
106+00
96+400 1 Span 2.00 m W=12.00
107+00
Strip Chart :- Ahmednagar Kada Ashti Jamkhed Beed road NH-561, Section : Dist. border Ambhora to Beed (KM 27+300 to 144+500).
MURUM SURFACE
108+00
109+00
99+600 BP pump
Patoda rd, Chumbli phata 99+700
110+00
100+00
INDEX
YEAR
7.00
HP Drain
2019-20
2020-21
5.50
Arch Bridge
SURFACE
Dhappa Drain
3.75
110+00
110+00
100+00
1 V 900 W=10.20
111+00
111+00
101+00
Junction
1 Span 1.00 m W=11.00
Slab Culvert
Major Bridge
Minor Bridge
101+900 2 Span 13.00 m W=11.80
112+00
112+00
102+00
ROB
PHC
102+600 Shirur road
Rest House
Petrol Pump
1 Span 1.00 m W=19.00 103+00 2 Span 1.00 m W=9.80
113+00
113+00
103+00
114+00
104+00
114+00
104+400 2 Span 2.00 m W=10.10
104+500 Talepimpalgaon Bus stop
PLAN WORKS
115+00
115+00
105+00
3 V 1200 W=14.0
ASHTI CONSTITUENCY
116+00
116+00
106+00
117+00
117+00
107+00
1 V 900 W=12.0
BLACK TOP
WBM SURFACE
COLOUR CODE
Strip Chart :- Ahmednagar Kada Ashti Jamkhed Beed road NH-561, Section : Dist. border Ambhora to Beed (KM 27+300 to 144+500).
MURUM SURFACE
2 V 1200 W=9.80
:
:
:
118+00
108+00
118+00
P.H.C.
110+200
110+900
111+600
113+00
113+400
113+500
113+600
Rohatwadi road 113+700
115+600
117+200
117+600
118+00
SURFACE
1 V 900 W=11.00
1 V 900 W=11.30
1 V 900 W=12.80
Dam road
120+00 121+00 122+00 123+00 124+00 125+00 126+00 127+00 128+00 129+00 130+00
10.00
7.00
5.50
3.75
120+900
121+00
121+200
121+600
122+00
123+800
125+00
125+900
HP pump 126+00
SH-55 Charhata road 126+100
126+900
127+700
129+500
129+600
Present Condition Good
Nature of Soil B.C. B.C. B.C. B.C. B.C. B.C. B.C. B.C. B.C. B.C.
Terrain Plain Plain Plain Plain Plain Plain Plain Plain Plain Plain
Existing BT Crust 50 mm
Existing WBM Crust 300 mm
2) Strengthening
3) P.R.
INDEX Slab Culvert ROB COLOUR CODE
HP Drain Minor Bridge PHC MURUM SURFACE :
Dhappa Drain Major Bridge Rest House Sub Divisional Engineer Executive Engineer WBM SURFACE :
Arch Bridge Junction Petrol Pump N.H. Sub Division N.H. Division BLACK TOP :
Beed Latur
Strip Chart :- Ahmednagar Kada Ashti Jamkhed Beed road NH-561 KM 0+000 to 144+500.
Pimpargavhan road
Agriculture college
3 V 1200 W=12.30
1 V 1200 W=12.30
1 V 1200 W=12.50
1 V 900 W=13.80
1 V 600 W=12.60
1 V 900 W=12.60
1 V 900 W=14.30
Shirapur road
Pathardi road
RUB
130+00 131+00 132+00 133+00 134+00 135+00 136+00 137+00 138+00 139+00 140+00
10.00
7.00
5.50
3.75
1 V 1200 W=12.70
131+100
131+600
Wanjarwadi road 131+700
131+900
132+100
132+500
133+100
133+600
134+700
135+00
135+100
135+500
136+400
137+00
137+600
137+800
Mhasoba temple 137+900
138+400
139+00
140+00
Present Condition Existing pavement is in bad condition.
Nature of Soil B.C. B.C. B.C. 8% CBR soil 8% CBR soil 8% CBR soil 8% CBR soil 8% CBR soil 8% CBR soil 8% CBR soil
Terrain Plain Plain Plain Plain Plain Plain Plain Plain Plain Plain
Existing BT Crust 50 mm
Existing WBM Crust 300 mm
2020 - 2021
2021 - 2022
2022 - 2023
2023 - 2024
2) Strengthening
3) P.R.
Radhagovind HP pump
2 Span 14.00 m W=12.00
140+300
BP pump 141+00
141+600
141+700
2) Strengthening
3) P.R.