Office of the Chief Engineer


Government Of lndia, Ministry Of Road Transport & Highways
(Regiorral Office, Maharashtra, Goa and Daman & Diu)
Room No 508 & 509, Konkan Bhavan,5th Floor, Sector-6, C.B.D., Belapur, Navi Mumbai400614
Tel.' 022-27 562370, 27562369, Email :- romum-morth@gov.in: romorthmumbai@gmail com
Date: 13.O7.2020
To,

cE(NH),PWD Chief Engineer,


5th Ftoor,
PWD (NH)
Konkan Bhawan, Govt. of Goa
Navi Mumbai Attino, Goa

Sub: Removal of black spots on National Highway reg.

Ref: (i) RO en Cor r I 7020 -21 I 1 29 d ated


/MUM / c 11 .05 .7020
(ii ) RO /MUM/Gen Corrl2020 -21 I 130 dated 11 .05.?020

Sir,
Ptease refer to this office tetters under reference regarding rectification/removal of
btack spots on NHs.

2. This office letters under reference has requested to submit details of long term & short
terms steps to be taken up for removal of btack spots on National Highways by PWD/MSRDC of
State Government. However, tilt dates no detaits on rectification to the btack spots on NHs
have been submitted to this office.

3. lt is once again ctarified that any btack spot present on NH fatls under any existing
contract, then the same slratt be removed either by the existing contractor and if it is beyond
the scope of the existing contract then a separate proposal shatl be submitted to this for
approva[.

4. Further, it is informed that a meeting is scheduted on 17tr' July 2O7O under chairmanship
of Hon'bte Minister regarding removal of btack spots.

5. lt has been reported that temporary measures have been compteted on at[ the
identified btack spots prior to 31.03.2020. lt is requested that a btack spot wise summary
report duty signed by concerned Executive Engineer may be urgentty provided including 4
photographs depicting the measurc.s taken as proof (Annexure-l).

6. For long term measures, as per letter under reference foltowing details may be
submitted btack spot wise:-

(i) Long term measures proposed.


(ii) Finatized improvement drawing.
(iii) Tentative cost
(iv) Time of construction
(v) Likety date of start
(vi) Likety date of comptetion
(vii) Source of fund for improvement
(by COS in any existing contract/new
estimate)

The above information may


be submitted latest by 15.O7 .2OZO

Yours faithfutty,

(A. Srivastava)
Copy to
Chief Engineer & Regional Officer
:

Chief Engineer (2.4), MoRTH, l.tevr


Jl],
(ri) Pr. CE (NH) Goa.
Dethi.
(iii) EE (NH), pWD Nigpur
Annexure-l

DETAII.s OF TEMPORARY MEASURES

1. Black Spot lD no. :

2. NH No. :

3. Black Spot Chainage:

4. Problem identified at black spot:

5. Name of the Work under which removal of Black spot Undertaken:

5. Name of the Contractor:

7. Name of Consultant for black spot, if any :

8. Expenditure for Black Spot:-

9. Temporary Measures:-

a) Rumble strip:

b) Sign boards:

c) Blinker:

d) Crash Barrier:

e) Any other:

Date of completion of temporary measures:

Photographs of work done under temporary measures:


DETAILS OF LONG TERM MEASURES

1. Black Spot lD no. :-

2. NH No. :-

3. Black Spot Chainage:

4. Problem identified at black spot:

5. Name of the work under which removal of Black spot Undertaken:

6. Name of the Contractor:

7. Name of Consultant for black spot, if any :-

8, Expenditure for Black SPot:-

9. Long term Measures ProPosed:-

a) Widening of road
b) Curve imProvement
c) Signage & road marking
d) Safety devices like deflectors, cat eyes
e) JunctionimProvement
f) UnderPass if anY
g) Any other measures.

10. Date of completion of long term measures:

11. Photographs of work done under long term measures (after completion):