Irollowing amendments have been made in the Bidding Documents for the
subjectWorks under this Addendum No. 1, which sha1lbe read and construed
as an integral part of Bidding Documents and shall take precedence in case of
any conflict(s)/ambiguity(s)this Addendum No. 1 and other provisions of the
Bidding Documents.
1. BIDDING DATA
o PARTICULAR SPECIFICATION
3. TENDER DRAWINGS
ii. Drawing No. CS-02, CS-03 and CS-06 are deleted in their
entirety and replaced with the attached drawing No. CS-02,
C S -0 3 a n d CS- 06.
---oooOooo--'
MINUTES OF PRE-BIDMEETING HELD ON 27th SEPTEMBER.2018
2. General Manager (P&CA) welcomed the participants of the Pre-bid meeting and
asked the bidders to come forward with their question. It was clarified that any point raised
in the meeting will be replied with the Minutes of Meeting and, if required, Addendum wiil be
issued to all the Bidders.
3. The queries raised and the actions to be taken are detailed below:
)
NHA should assist the Contractor in
entering into contract with Railway
administration and meeting all their
requirements to expedite the Work.
C. M/s Sinohvdro Corporation Limited
Part-II Particular Conditions of Contract
15.3 Contractor's Representative
I Please clarify whether this clause is PtrC Byelaws be followed.
applicable to foreign contractors=? Contractor's representative must be
Graduate Civil trneineer.
z 41, 1 Time for Commencement
Please clarify the following are the pre- Pleaserefer to Appendix-A to Bid
condition to be satisfied before the Engineer
issues Commencement Order:
1. The Cbntract Agreement has been duly
signed:,
2. The Contractor has submitted to the
trmployer the performance security and
the advance payment guarantee
3. The Employer has paid the Contractor the
ful1 advance payment
4. Right of Access to and possession of the
whole Project Site are handed over to the
Contractor.
60.1 1 Mobilization Advance
The advance payment is mainly used for Not agreed
mobilization or contractor's resources
including his personnel and equipment' May
the advance payment 15% be fully paid in
one insta-lment when the advance payment
guarnntee is provided in amounts and
currencies equal to the advance payment?
4 Special Provisions (Contractual)
SP[C)22.1Damage to persons and propertv
GeneralTy, belore commencement of the Relocation of B&s, telePhone,
Works, the public services falling within the electricity will be done by the
site shall be removed and relocated relevant department. Contractor
(1) Please clarify who will take the execute the work and shall
responsibility to remove these public coordinate with the concerned
services falling within the Right of Way? department for preparing the
(2) If they are not necessary to remove, will
schedule.
the Employer provide distribution drawings
for public services to avoid or minimize t'ne
damage to the propertY?
Part-I General Conditions of Contract
60.3 Pavment of Retention Monev
'laking Over Certificate,
On issuing of Upon submission of contractor's
whether the second half of the Retention request, Project Authorities, if
Money can be replaced by a bank guarantee considered appropriate can seek
in the same amount of the Retention Money? aoproval from competent authority.
O Question
Is it necessary for foreign company to make Yes
the.JV with 1ocalcompany?
7 You are requested that please grant us the Reouest not acceded to
extension in time for more ten (10) davs,
M/s China Gezhouba Group Companv Limited
I We have made some suggestions in Bid Please proceed as per bid
Security form as per attached e-mail, which documents
may please reviewed and considered'
{Amended Form is attached)
.a Kindly extend the bid submission date for Requestnot accededto.
the period of 30 davs,
D . M s Xiniians Beixin Road & Bridge Group Co Ltd.
I Joint Venture
Please clarify that if a Foreign Firm is having At least 30% share of local firm is
PEC license, JV formulation is mandatory or reouired.
not for this proiect.
-z PEC
Our firm is registered with PEC for the year Firms having PtrC licence of year
2017-18 now we have applied for renewal for 2AI7-18 and applied for renewal
the year 2018-19 so can we participate in can participate in bidding, Payment
this bit? receipt for renewal be attached.
- Form I.T.1
What will be the procedure adopted by NHA Please refer Clause 72.3 of Bidding
for comparing bid prices of Tax exempted Data
and non Tax exempted companies? What
will NHA do if tax exemption certificate
expires during the project execution, will
NHA give any grace period during renewal
Drocess or deduct income tax from payment.
A
T Covered Drain Items
Refer Drawing No. DR-01 i) PCC (1:4:8) ii) Refer to the reply of Query No. A.21
Brick Masonry iii) Cement Plaster will be
paid in which head of BOQ? If the above
items are payable in Bill No. 4.2 Lined Drain
and Box Culverts than there is no provision
of PCC (!:4:8), Brick Masonry and Cement
Plaster in BOQ.
- RCC Pipe Culverts:
Refer Drawing No. PCC-001,PC-002, Typical Refer to the reply of Query No, A21
RCC culverts detail shown in drawings but
no provision of Pipe cuiverts in BOQ
6 Bid Securitv
Sh'all we provide Bid Security as insurance Please refer Clause 15.2 of Bidding
guarantee Data
7 Provincial Tax & Sales Tax
Due to the project financed by Government, Please refer to Clause 12.3 of
are there any Provincial Tax and Sales Tax Instructions to Bidders
in Sindh.
E. M/s Ghulam Rasool and Comlany kt Ltd
-@po*d -
submissiondate I Request notgqL
4. Firms were advised to read the bid document and visit site area prior to
submission of their bids. During meeting, it was advised that a,11on-going projects with
relatecl data be listed in the Appendix-P to Bid. In response to one of the QueV, it is clarified
that soft copy of BOQ can be obtained from P&CA Section, however, the BOQ of Bid
document (uploaded/issucd) shall prevail in case of any discrepancy found in BOQ of the
submittcd bid.
ss.2 MATERIALS
shall be sameas specifiedin item 401 of NHA
The materialrequirement
generalspecifications
except:
ss.4 MEASUREMENT
Measurement shallbe sameas specifiedin item 401 of NHA
requirement
generalspecifi
cations.
ss.5 PAYMENT
The unitpriceper cubicmeterto be paidcoveredunderthis provisionshall
be the differenceof unit cost of sulphateresistantcementper cubicmeter
andordinaryPortlandcementper cubicmeter.
ForPlumConcrete CM
CM
ForConcreteClassB
CM
ForLeanConcrete
CM
ForConcreteClassA 2
CM
ForConcreteClassA 3
\
\)b
JAgHq UL HAQ
I{i'tyil'3,Tll€SF'*
H&Tu $tctien nt
ItlrlnlDao
c.roFN-s5_l
t
SEHWAN I rssza
lrron)
EX|STTNG
R.o.W
EXISIING
R.O.W
SHOULOEi
1/
---_---
2
*-lt
t---
7300
cRlNUl,ARSUBEASE(GSS)560 IM
rsPitALTCoNCREIE ffiARNCCOURSE (ACIIC)50 $r
RIGHT SIDE WIDENINC luoRO[RD S1JBCRADElO0 frm (25t CBR.)
ASPMLTCoNCRETE BASEcouRsg (Ac8c) r{o vM coMlloNRtt
Af6t€G$E BASECoURSE (A8C)200 uM
cRrNuuRsu8 SASE(GS8)200 Mv
ItPRCrymSU8GMDE 100 mm (25t CBR.)
TYPICAL X.SECTION FOR ADDITIONAL CARRIAGEWAY ON RIGHT SIDE
t
EXISTING
R.O.W SEWAN
*==--===:==.J,
2
17-
tooo 365q
r-ffiiiimr
SHOUL.OER
DtlGXt !m odr'lllrcll(If or
ilil*
,F GOVERNUENT0F PAKISTAN
MINISTRY OF COMMUNICATIONS EClltX G r-66 r|a a-ltll EGtlf
€-!F- NffiqNAL HIGTIWAY AUTHORTTY
F '&rrtev,r're-
t I
PETARO
SEHWAN
I GRNUURSUBBASE(CSB)560 r}|
SuBcR0E J00 mm (25I CBR.)
IUPROVED
ooMyo{ n[
NPHALTCONCRETE
ASPIT
^GGREGAIE
wE|RtNCcoJRSE(rcrC) m xul
LT CONCRmSaSECOURSE
NOTES.
t-At! DrMt].tstoilsARElN MTUJMEIERS UilLESS
TSPHALT
CONC.
UFlRtilC@uRsE50 uu NOTED OIHERIIISE.
2-IMPROVEO SUBORADE SMII HAVEMINIUUU CBR
TGCREGATE
BASECOURsE250YU OF 25I. IF A BARROW MAIERIILOF 25' CBR
IS NOTAVAII.A8I..EIN IHE PROJECT AREA]HE
cRluuR sugarsE2@ ral APPRO€OI/AIERIALSl{cII- 8E SIfNDED
!00 mm(8x cBR.)
SITBCRIDE MECMNICAI."LYIN A PROPTX PROPOR1ION flIH
PRIORAPPRO'/ L 0F lHE SIGINEER.
s-EMBANKITENT FIII SMII BE COMPASTED
ACCORDINO TO'IHECOMPASIION ZONE.
4-lN UATER L0@ED,\REAGRNtlrR/SrlNDY
CURBSTONEDEIAIL FoRLINKRoApAppRoAcHES 0F TrPt A-J (N l{XrMli fitCKNBS)
cRe)sssEcTloN
TyptcAL UATERUL
STUII BE PROVIDED UNDER IHE SUEGTADE
TAYER.IHE LOCATrcN OF SA'ERPONDNE/WATER
LOGGED AREAS SMLL BE IDENNREO PR1OR TO
II{E CONSIRUCTION WIftI APPROVAL OF IHE
E}IEINEER.
s-CONSIRUCTION OFADDITIICML O\RRIAGE IVAY
SIIATIBE DONEY{INOUIREilO\NNG IHE
D(|SIINGCATBER,,\CwCoVERrtY(50MM)SHArj-
BI PROVIOED IN IHE SECIIONS I{HEREgOlH
. SIDE}iIDENING OF DOSNNG ROADtS REQUIRED.
-**rr[-
DBaoilton corEError c
GOVERNUENT OF PAKISTAN
MIMSTRYOF COMMUNICATIONS sEcnotf d X-06 r8 a-tlt|l Etcal^Y (coaroo
NATIONALHIGITWAYAUTHORITY PrrEX) - lElril 'lcnol{ (lDfoEdlol8 n
m D PnolEct
o,, c.L 0F RoAD I t
I PETARO
it.s.L
ffi----7
I LEAilCoilcRElE75 Us
TSPHALTCOMRm TE RINGCoURsE (461YC)
50 lill sroNEPICHING250 Utl
lsPfuLT coNcRfrEBASEcouRsE(ACBC)110 $r L _ _ _
cMr{uunst,8Ms (GsB)
560lv AccREcArt8NE couRs€(rac) 2oo ru I
IIIPROVE09JBGMDE Joo mn (25r CSR') |
GMNUURsrg SISE(GSB)2oO|til
I|PROESS\JBCRIOE500 mm (251 C8R.) CMruUR gJB AISE(csg) 560 $r
SIJBGMDE
IMPROVED n)0 nm (251 CBR.)
TYPICAL X.SECTIONFOR CUT n|.I
SEHWAN
NOTE.
FORNOIESREFER NO.CS-03,
DiAWING
i
ii
ti
***
tE!tr*, t(n cot'tfitcn't d
.r.lrli
';ffT GOVERNMENT OF PAKISTAN cclox i'! lt-oo ta 4-tllll Bl(EraY
MINISTRY OF COMMUNICAI'IONS
,€L* Nm161,rAL HIGFIwAY AUTHoRITY