SAP ACTIVATE METHODOLOGY

NEW IMPLEMENTATION IN THE CLOUD


1. Which accelerator can you use during the Scope Validation/Fit Gap analysis in the
EXPLORE phase? (pagina 158) Choose 2

a. Solution validation workshop


b. RICEF Specification template
c. Quality Gate Checklist
d. Sprint Backlog template

SAP ACTIVATE METHODOLOGY CONTENT ACCESS


2. Which tool can you use to collaborate with other sap methodology for
practitioners? (page 98) choose 1

a. SAP JAM
b. Roadmap viewer
c. SAP implementation Assistant
d. SAP solution manager

BASICS OF SAP ACTIVATE


3. What are the 3 pillars of sap activate? (page 5) choose 3

a. Best practices
b. SAP solution manager
c. Guided configuration
d. SAP ACTIVATE Methodology
e. SAP S/4HANA in-memory Data Base

FUNDAMENTALS OF SAP ACTIVATE METHODOLOGY


4. What are key characteristic of the implementation approach in SAP Methodology?
(PAGE 30) choose 3 (Pregunta 8 de la guia ACT100)

a. START WITH BEST PRACTICE


b. VALIDATE SOLUTION
c. PREMIUM ENGAGEMENT READY
d. On-Premise only
e. Fixed Scope
NEW IMPLEMENTATION IN THE CLOUD
5. Which accelerator can help you document the detail design of solution extension?
(pag. 242 fig. )

a. Sprint Backlog Template


b. Change Request Template
c. RICEF Specification Template
d. Product Backlog Template

LANDSCAPE TRANSFORMATION TO SAP S/4HANA


6. In which PHASE of SAP Methodology does team complete the transformation /
Transition planning (page 293, figure 331)

a. PREPARE
b. Explore
c. Realize
d. Deploy

AGILE PROJECT DELIVERY


7. When does the project team receive formal confirmation that the user stories are
completed of the product owner? (Pag. 49 ACT100)

a. During user acceptance testing


b. During the sprint retrospective
c. During the sprint review
d. During the daily SCRUM meeting

FUNDAMENTALS OF SAP ACTIVATE METHODOLOGY


8. ¿Which content package are available in the package library? Choose 2 ( page 23)

a. SAP Best practices


b. Solution Builder
c. Rapid Deployment Solutions
d. SAP ACTIVATE Methodology

FUNDAMENTALS OF SAP ACTIVATE METHODOLOGY choose 1


9. How can scrum teams be organized? (pagina 85)
a. By WORK STREAMS
b. By project governance level
c. By job title
d. By project phase

SYSTEM CONVERSION TO SAP S/4 HANA


10. In which SAP methodology phase does the team complete Integration Validation?
Page: 269 figure 298
a. REALIZE
b. Prepare
c. Deploy
d. Explore

COMPONENTS OF SAP ACTIVATE


11. Which key activities does the guided configuration support you with? (Choose 3)
(page 10)

a. Create test data


b. View solution scope
c. Train new users
d. Manage roles of configuration users
e. Test configured processes

AGILE PROJECT DELIVERY


12. According to the Definition of Done which activity must be completed for each
sprint? (ACT200 p.90 )

a. Functionally must be tested in the quality (QAS)


b. End user training must be delivered
c. Solution must be built and configured in the development system (DEV)
d. Functionally must be released in the business

NEW IMPLEMENTATION ON-PREMISE


13. What does a project jump start include for a new implementation of sap S4HANA
on premise edition? (Pag 211)
a. SAP BEST PRACTICES
b. Project team training
c. Full project scrum
d. Rapid prototyping

NEW IMPLEMENTATION ON-PREMISE


14. Which of the following content best outlines the scope of the integration test? (3)

1- SOLUTION BASELINE
2- DELTA/GAP SOLUTIONS
3- DATA FLOWS WITH NON-SAP APPLICATION

Otra referencia

1-Solution baseline
2-Delta configuration
3-Data flows between SAP solutions

1-prototype
2-Delta/gap solutions
3-Data flows with non-SAP application

1-prototype
2-Delta configuration
3-Data flows between SAP solutions

COMPONENTS OF SAP ACTIVATE


15. What is the purpose of the solution builder tool in the SAP Guided Configuration?
(Pag. 9 ACT100)
a. To Activate the SAP Best Practices content
b. To create delta building blocks for complementary content
c. To personalize activated, ready-to-run business processes
d. To create customer-specific scope items

AGILE PROJECT DELIVERY


16. Who determines the task that are required to complete committed backlog items
in sprint?

a. Project Manager
b. Product Owner
c. SCRUM Master
d. PROJECT TEAM (Pag. 49 ACT100)

FUNDAMENTALS OF SAP ACTIVATE METHODOLOGY


17. What is the focus of a SCRUM of SCRUMS in agile context?

a. INTEGRATION TOPICS (Pag. 85 ACT100)


b. Best practice adoption
c. Backlog management
d. Communication to the project management office

NEW IMPLEMENTATION IN THE CLOUD


18. What is a difference between the SAP Activate Methodology for a new
implementation of SAP S/4HANA Cloud Edition and a new implementation of SAP
On-Premise? (ACT 100 pag 198)

a. FOR ON- PREMISE THERE IS AN ADDITIONAL Q GATE FOR SYSTEM


INSTALLATION
b. FOR THE CLOUD EDITION, THERE IS AN ADDITIONAL Q-GATE FOR INTEGRATION
WITH ON-PREMISE SYSTEMS
c. FOR ON-PREMISE, THERE ARE ADDITIONAL DELIVERABLES FOR THE SYSTEM
SETUP
d. FOR THE CLOUD EDITION, THERE IS AN ADDITIONAL WORK STREAM FOR
INTEGRATION WITH ON-PREMISE SYSTEMS

NEW IMPLEMENTATION IN THE CLOUD


19. How can the project manager help to keep momentum in the project and help to keep
the customer involve? Two correct answers Act100 Page: 171 (d) & Act_200 Page 37
a. WALKTHROUGH THE SOLUTION PROCESSES WITH THE STAKEHOLDERS
b. Increase the number of quality gates
c. Leverage agile cycles to build and test the solution
d. ADD CUSTOMERS RESOURCES TO THE PROJECT TO REDUCE THE NEED FOR
FORMAL TRAINING

By: Marce

COMPONENTS OF SAP ACTIVATE


20. In which phase do you verify that the SAP Best Practice solution scenarios meet the
business needs of the customer?

a. Realize
b. Deploy
c. Prepare
d. EXPLORE (pregunta 121 act100, pág 13)

SYSTEM CONVERSION TO SAP S/4HANA


21. ¿Which of the following activities are part of the REALIZE phase of system
conversion journey of to S4HANA On-Premise Edition? (3) (page 277) (By Marcela)

a. Operations impact analysis


b. Sandbox system migration
c. DELTA CONFIGURATION
d. DEVELOPMENT SYSTEM MIGRATION
e. Custom code adjustment

AGILE PROJECT PLANNING


22. Which activity helps the project team to add the user stories in the product backlog?
(pag. 49)

a. CONDUCTING THE SOLUTION VALIDATION


b. Planning user acceptance test
c. Preparing a project schedule
d. Assessing project risk

SAP ACTIVATE METHODOLOGY CONTENT ACCESS


23. Which structure level do you see when you access the roadmap viewer and choose
work stream navigation? (pregunta 9 de la guía de Marcela (35 preguntas)) PAG 105
ACT100

a. Deliverable
b. Scope item
c. Task
d. Scenario

NEW IMPLEMENTATION ON-PREMISE


24. In which phase do you create a prioritized list of user requirements?

a. EXPLORE (pg.13)
b. Realize
c. Deploy
d. Prepare

NEW IMPLEMENTATION IN THE CLOUD


25. In which phase does the Transition to Operations work stream start?

a. REALIZE
b. PREPARE
c. DEPLOY
d. EXPLORE (pag 146, ACT100) (Transition to Operations starts towards the end of the
EXPLORE Phase)

NEW IMPLEMENTATION IN THE CLOUD


26. What is a key characteristic of SAP Activate for new implementation of SAP S/4HANA
Cloud Edition?

a. START WITH EXECUTABLE CONTENT (Pag. 144, Figure 147 ACT100)


b. LIMITED INVOLVEMENT OF BUSINESS STAKEHOLDERS
c. DESIGN-BASED
d. WATERFALL APPROACH

COMPONENTS OF SAP ACTIVATE


27. Which tools does SAP Activate provide to support guided configuration? (3)
(pregunta 10, Pág. 8 ACT100)

a. EXPERT CONFIGURATION
b. SAP Solution Composer
c. SOLUTION BUILDER
d. Model Company
e. SELF SERVICE CONFIGURATION

SAP ACTIVATE METHODOLOGY CONTENT ACCESS


28. In which tools can the project team access the SAP Activate Methodology content
included accelerators?(2) (pregunta 190, Pag131 ACT100)

a. SAP JAM
b. Roadmap viewer
c. SAP service marketplace
d. SAP community network

AGILE PROJECT PLANNING


29. Which estimation technique can be used in agile project delivery to size the user
stories during sprint planning?
(ACT_200 Page: 89 & 90)
a. DETAILED BOTTOM UP EFFORT ESTIMATE BY SCRUM MASTER IN STORY
POINTS BASED ON THE USER STORY COMPLEXITY
b. Detailed bottom-up effort estimate that breaks each user story up into hours or shorter
tasks
c. Relative estimate in ideal person days that reflects the best estimate provided by
the project team
d. Product Owner´s relative estimate of the effort that will be needed to implement the user
story
NEW IMPLEMENTATION ON-PREMISE
30. Which of the following is a key deliverable of the prepare phase? (pregunta 171
ACT100) (choose 1) (Learning hub)

a. Baseline build
b. Release and Sprint Plan
c. Change Impact Analysis and Communication Plan
d. Solution Scope and Value Determination
NEW IMPLEMENTATION ON-PREMISE
31. Which of the following key deliverables do you complete in the solution design
workstream in the EXPLORE phase? (3) (Pag. 223)

a. BASELINE BUILD
b. Data Migration Approach
c. Solution Scope and Value Determination
d. DESIGN FOR THE GAP AND DELTAS
e. VALIDATION WORKSHOP

NEW IMPLEMENTATION IN THE CLOUD


32. What is a benefit of using Guided Configuration instead of the Implementation Guide?
(pag 6 3er parrafo)

a. IT ENSURES SAP UPDATES DO NOT CONFLICT WITH CUSTOMER


CONFIGURATIONS
b. IT ELIMINATES THE NEED TO GENERATE TRANSPORT REQUESTS FOR
CONFIGURATION SETTINGS
c. IT ELIMINATES THE NEED FOR CONTENT LIFECYCLE MANAGEMENT
d. IT ENSURES CONFIGURATION IS DONE USING SAP SOLUTION MANAGER

AGILE PROJECT DELIVERY


33. Which new project roles are introduced with the sap activate agile methodology? (2)
(Pregunta 25 ACT100)

a. SCRUM MASTER
b. PRODUCT OWNER
c. Integration lead
d. Design thinking coach

FUNDAMENTALS OF SAP ACTIVATE METHODOLOGY


34. What is the purpose of the Solution Validation activity in the EXPLORE phase?
(página 36)(3)

a. TO IDENTIFY GAPS
a. TO CHALLENGE CHANGES TO STANDARD
b. TO LOG ADDITIONAL SCOPE ITEMS
c. To verify technical installation
d. To educate project participants

BASICS OF SAP ACTIVATE


35. Which of the following building blocks are part of the SAP S/4HANA platform?
There are 2 correct answers (pregunta 16 ACT 100) (pag 33, ACT100)

a. SAP fiori UX
b. LoB cloud solutions
c. SAP solution manager
d. SAP HANA in-memory database

AGILE PROJECT DELIVERY


36. What technique helps agile project teams to prioritize a large, flat backlog? (página
36-37)

a. User story mapping


b. Retrospective
c. Fit/Gap analysis
d. Planning poker

AGILE PROJECT PLANNING


37. What information does the project team need so that they can estimate the relative
size of backlog user stories correctly? (choose 1) (pagina 90 act200)

a. Available project resources


b. Overall Project Schedule
c. Test Strategy
d. Definition of Done

SAP ACTIVATE METHODOLOGY CONTENT ACCESS


38. Which navigation option do you use in the roadmap viewer to access the sap activate
methodology content?

a. Navigate by workstream
b. Navigate by assigned Delivery Mode
c. Navigate by RACI matrix accountability
d. Navigate by Project Team Member Role
NEW IMPLEMENTATION ON-PREMISE
39. Which deliverable is specific to on premise and NOT for the cloud?

a. TECHNICAL SOLUTION DESIGN


b. Knowledge Transfer
c. Adaptation specification
d. Learning needs analysis

NEW IMPLEMENTATION IN THE CLOUD


40. Which activities are part of the application: solution adoption work stream of sap
activate for new implementations? (3) Page: 147 figura 150

a. CHANGE MANAGEMENT PLAN


b. Value determination
c. Production Support Plan
d. VALUE AUDITS
e. Scope Validation

AGILE PROJECT DELIVERY


41. What is the purpose of a firm-up sprint? choose 1 (page. 47)

a. TO PERFORM STRING TESTING


b. To run end-to-end integration test
c. To demonstrate functionally from previous sprint
d. To revise a release plan and sprint plan

NEW IMPLEMENTATION IN THE CLOUD


42. What is the final activity in the REALIZE phase of new implementations of sap
S4/HANA cloud edition? Choose 1 (page 166)

a. DATA MIGRATION
b. Readiness Check
c. End-to-end walkthrough
d. Solution Validation
FUNDAMENTALS OF SAP ACTIVATE METHODOLOGY
43. What is the purpose of the SAP activate methodology?

a. To enable access of the SAP ecosystem


b. TO ACCELERATE THE INITIAL IMPLEMENTATION OF SAP S/4HANA
c. To provide end-to-end integrated application lifecycle management
d. To manage project and solution documentation.

AGILE PROJECT PLANNING


44. Your project is preparing for the Fit/Gap analysis workshops. If you use Agile
approach, ¿What sequence of activities do you perform in the Explore phase? (1)
(Act 100, page 38)

SET REFERENCE VALUE


CONDUCT SOLUTION VALIDATION
PRIORITIZE INITIAL BACKLOG
CONDUCT DELTA DESIGN WORKSHOP

CONDUCT SOLUTION VALIDATION WORKSHOPS


SET REFERENCE VALUE
PRIORITIZE INITIAL BACKLOG
CONDUCT DELTA DESIGN WORKSHOP

SET REFERENCE VALUE


PRIORITIZE INITIAL BACKLOG
CONDUCT DELTA DESIGN WORKSHOP
CONDUCT SOLUTION VALIDATION WORKSHOP

CONDUCT SOLUTION VALIDATION WORKSHOPS


CONDUCT DELTA DESIGN WORKSHOP
SET REFERENCE VALUE
PRIORITIZE INITIAL BACKLOG
LANDSCAPE TRANSFORMATION TO SAP S/4HANA
45. Which of the following activities are part of the deploy phase of a landscape
transformation journey to sap S/4HANA on-premise edition? (2) (página 289, figura 324)
a. Solution Activation
b. Training Delivery
c. Assess organizational and production readiness
d. Optimize software Change Control Management

FUNDAMENTALS OF SAP ACTIVATE METHODOLOGY


46. What are the responsibilities of the project team on level 4 in the picture below (2)
(PAGE 84)
a. IDENTIFY AND RESOLVE ISSUES AND RISKS
b. PERFORM STATUS, REPORTING AND COMMUNICATION
c. Set project policy, standards and oversight
d. Set business priorities, goals and objectives

NEW IMPLEMENTATION ON-PREMISE


47. What do you do during an iterative approach to build a solution? (Pag. 236, 237)

a. INCLUDE FREQUENT INSPECTION CHECKPOINTS


b. Build the solution module by module
c. Provide a working solution only at the end of the release
d. Deliver a prototype of the solution

SAP ACTIVATE METHODOLOGY CONTENT ACCESS


48. What can users do in the roadmap viewer tool?

a. Create a customer-specific version of SAP Activate Methodology


b. Download full SAP Activate Methodology content for use off-line
c. Display and navigate detailed SAP activate methodology WBS
d. Upload SAP Activate WBS into SAP Solution Manager 7.1
SAP ACTIVATE METHODOLOGY CONTENT ACCESS
49. What is the hierarchy level under phase in the sap jam space for SAP Activate On-
Premise? (Pag. 99)

a. Key deliverable
b. Workstream
c. Scenario
d. Task

AGILE PROJECT DELIVERY


50. What is the objective of a sprint retrospective meeting?

a. Define the stakeholder management approach


b. Improve the SCRUM process
c. Provide formal feedback to the project manager
d. Review and prioritize the backlog

BASICS OF SAP ACTIVATE


51. What component of sap activate offers customers a reference solution in the cloud
for a quick start? (página 5)

a. SAP BEST PRACTICES


b. SAP activate methodology
c. SAP implementation assistant
d. Guided configuration

NEW IMPLEMENTATION IN THE CLOUD


52. What are the deliverables of the application integration work stream in the prepare
(explore) phase? (3) (página 162 figura 170)

a. Fit/Gap Analysis
b. Network Connectivity Checks
c. Data Cleansing
d. ADAPTATION SPECIFICATIONS
e. Security Checks

AGILE PROJECT DELIVERY


53. What criterion does the product owner use to sequence the product backlog? (page
86)

a. Complexity
b. Resources Availability
c. Relative effort
d. BUSINESS PRIORITY

AGILE PROJECT DELIVERY


54. What is the purpose of the ScrumBoard? (ACT 100 pg. 49 y ACT 200 105-108)

a. TO VISUALIZE TEAM PROGRESS


b. To show the functional breakdown of the solution scope
c. To manage the resource load
d. To document the results of integration testing

AGILE PROJECT DELIVERY


55. What is Scrum of Scrums? (page 85)

a. INTEGRATION MEETING BETWEEN THE VARIOUS PROJECT TEAMS


b. Frequent inspection of code and configuration prior to quality gates
c. Alternative to regular SCRUM process for smaller teams
d. Mechanism for gathering and validating requirements

SYSTEM CONVERSION TO SAP S/4HANA


56. Your project is performing some high-level planning for a system conversion journey
from sap business suite to sap S/4HANA On-Premise edition.
Which is the correct sequence of selected key deliverables across the project phase?

● DETAILED SYSTEM ASSESSMENT


● CODE ADJUSTMENT
● VALIDATION OF MIGRATION
● PRODUCTION READINESS CHECK

● DETAILED SYSTEM ASSESSMENT


● PRODUCTION READINESS CHECK
● CODE ADJUSTMENT
● VALIDATION OF MIGRATION

● PRODUCTION READINESS CHECK


● DETAILED SYSTEM ASSESSMENT
● CODE ADJUSTMENT
● VALIDATION OF MIGRATION

● CODE ADJUSTMENT
● DETAILED SYSTEM ASSESSMENT
● PRODUCTION READINESS CHECK
● VALIDATION OF MIGRATION

FUNDAMENTALS OF SAP ACTIVATE METHODOLOGY


57. In what respect is SAP Activate Methodology different from the ASAP Methodology?
(115 ACT100)

a. INCLUDES FIT GAP ANALYSIS INSTEAD OF BLUEPRINT


b. SUPPORTS ONLY NEW IMPLEMENTATIONS
c. LEVERAGES ITERATIVE INCREMENTAL BUILD
d. SUPPORTS CLOUD DEPLOYMENTS

NEW IMPLEMENTATION IN THE CLOUD


58. How are the build and test tasks planned and executed in the realize phase? (Pag.
237)

a. By using the sprint backlog list as input for each iteration


b. By executing regression test after each iteration
c. With quality gates for sign off after each iteration
d. By using incremental build in fixed scope iterations

SAP ACTIVATE METHODOLOGY CONTENT ACCESS


59. What is the most granular level in the methodology you can view in the roadmap
viewer? (1 ANSWER) (respuesta correcta pg 104, task)

a. Phase
b. Scenario
c. Task
d. Deliverables

BASICS OF SAP ACTIVATE


60. What is SAP activate? (pregunta 63 guia ACT100)

a. A step-by-step instruction on how to move from SAP Best Practices to your custom
solution
b. A COMBINATION OF SAP BEST PRACTICES, METHODOLOGY, AND GUIDED
CONFIGURATION
c. A methodology for each of the deployment modes (Cloud, On-Premise, Hybrid)
d. A bundle of ASAP, SAP LAUNCH, AND RAPID DEPLOYMENT SOLUTIONS

LANDSCAPE TRANSFORMATION TO SAP S/4HANA


61. In which phase of the SAP Activate Methodology does the team complete the System
Assessment?
Page: 294 figure: 332
a. Deploy
b. EXPLORE
c. Prepare
d. Realize

AGILE PROJECT DELIVERY


62. What is the key characteristic of Agile Project delivery?

a. ITERATIVE BUILD WITH FREQUENT INSPECTIONS (pg. 46)


b. Frequent Quality Gates
c. Formal and detailed documentation
d. Frequent and detailed project scheduling

NEW IMPLEMENTATION ON-PREMISE


63. Which of the following tasks are required in the prepare phase? (PÁGINA 194)
THERE ARE 3 CORRECT ANSWERS

- Define the communication plan


- Approve the test strategy
- Train the project team
- Identify relevant SAP best practices
- Set up the infrastructure to support the project

NEW IMPLEMENTATION ON-PREMISE


64. Which key deliverable includes the development of RICEFW objects?

a. ENHANCEMENT DELIVERY
b. Development build
c. Custom extensions management
d. Sprint execution

NEW IMPLEMENTATION ON-PREMISE


65. What must you do when you implement SAP Business Suite On-premise with SAP
Best Practices? (Pregunta 17 ACT100 pag 203 fig. 218)

a. ASSEMBLE AND APPLY SAP BEST PRACTICES TO THE SYSTEM


b. Apply SAP Best Practices with the Configure your Solution application
c. Active and apply SAP Best Practices with SAP Solution Manager
d. Activate and apply SAP Best Practices content with the self service configuration UI
NEW IMPLEMENTATION IN THE CLOUD
66. Which activities are part of the design and configuration application of the SAP
Activate Methodology? (página 159-160) (2)

a. Perform fit/gap analysis


b. Conduct scope validation
c. Schedule kick-off workshop
d. Confirm integration prerequisites

NEW IMPLEMENTATION IN THE CLOUD


67. What is a deliverable of the application customer team enablement work stream in the
prepare phase of sap activate? (pregunta 11 ACT100) (página 167 177)

a. Knowledge transfer to end users


b. Project charter
c. Process documentation
d. Learning plan

NEW IMPLEMENTATION ON-PREMISE


68. What tool do you use to configure an sap business suite On-Premise solution?
(Act 100, page 10)

a. SAP IMPLEMENTATION GUIDE


b. Configuration composer
c. ABAP workbench
d. Expert configuration

SYSTEM CONVERSION TO SAP S/4HANA


69. In which sap activate methodology phase does the team identify and design
functional quick wins in scope of the conversion project?
(Act 100, page 273)

+ EXPLORE
+ Prepare
+ Realize
+ Deploy
FUNDAMENTALS OF SAP ACTIVATE METHODOLOGY
70. In sap activate what replaces the detailed blueprint from ASAP?

a. FIT/GAP WORKSHOPS (pg. 12)


b. Custom Extension Management
c. Value Determination
d. Business Process Mapping

FUNDAMENTALS OF SAP ACTIVATE METHODOLOGY


71. When do you perform user acceptance testing during the Agile Build?
(pregunta 31 ACT100)

a. After each sprint


b. During each Firm-up Sprint
c. AFTER INTEGRATION TESTING
d. Before Integration Testing

NEW IMPLEMENTATION ON-PREMISE


72. Which of the following tasks are part of the production support after de go-live key
deliverable? (choose 2) (pág. 14, 42 y 197 ACT100)

a. Provide further training to customer end users


b. RESOLVE ISSUES IDENTIFIED DURING THE HYPER CARE PERIOD
c. SET UP THE OPERATIONS CONTROL CENTER
d. Perform a technical system test

SYSTEM CONVERSION TO SAP S/4HANA


73. Which of the following activities support the realize phase of a system conversion
journey to sap s4hana on premise edition? (there are 2 correct)

Page:277 Figure:310, by RO

a. Data aging configuration


b. Value Determination
c. Non-production system migration
d. Custom code adjustment planning
LANDSCAPE TRANSFORMATION TO SAP S/4HANA
74. Which of the following sap s4hana landscape transformation options are enabled? (3)
(pregunta 83/ guia ACT 100) (pg. 293 FIG 330)

a. SYSTEM CONSOLIDATIONS
b. System upgrade
c. MIGRATION OF BUSINESS UNITS
d. MIGRATION OF SELECTED APPLICATIONS
e. Security migration

AGILE PROJECT PLANNING


75. What are the responsibilities of the product owner in release and sprint planning?
(page. 86, 48) there are two correct answers

a. PRIORITIZE BACKLOG USER STORIES BY BUSINESS PRIORITY


b. Estimate the backlog user stories
c. Analyse the functional and technical dependencies between the user stories
d. Define objectives for each release

NEW IMPLEMENTATION ON-PREMISE


76. What do you do during sprint execution? (pag.239)

a. MEASURE THE SPRINT PROGRESS WITH A PERCENTAGE COMPLETE REPORT


b. Present status of selected user stories in the sprint scope on a scrumboard
c. Hold a retrospective at the end of each week
d. End a sprint when the sprint backlog items are all complete

SYSTEM CONVERSION TO SAP S/4HANA


77. What is the best target environment for a system conversion journey as described in
the sap active methodology? (pg. 89, 266)

a. SAP S/4 HANA ON PREMISE EDITION


b. Hybrid of SAP S/4 HANA cloud edition and SAP S/4 HANA on-premise edition
c. SAP Hybris
d. SAP S/4 HANA cloud edition

NEW IMPLEMENTATION IN THE CLOUD


78. Which activity is part of the SAP Activate Methodology for a new implementation of
SAP S/4HANA on-premise edition but not of the cloud edition?

a. Technical System Test (pg. 247, 166)


b. User Acceptance Test
c. Unit Test
d. End-to-End integration Test

NEW IMPLEMENTATION ON-PREMISE


79. In which phase do you execute the User Acceptance Test? (Act 100, p. 235)

a. Deploy
b. Final Preparation
c. Build and Test
d. REALIZE

SAP ACTIVATE METHODOLOGY CONTENT ACCESS


80. Which collaboration features can SAP Activate Jam users access? (2)

a. Comment on documents
b. Update key deliverable wikis
c. Tweet questions
d. Ask questions
=) Nice work team! =)