KEY PLAN.
A A

B B

C C

D D

E E

NOTES.
1. All Dimensions are in 'mm'. Do not scale this drawing.
F 2. Concrete proportions : R.C.C - 1 : 1.5 : 3 & P.C.C - 1 : 4 : 8 F
Any rich proportions could be used to suit site conditions.
3. Suitable drainage arrangement to be provided around the
weighbridge area to avoid water accumulation during raining.
4. Where rebar interferes with loadcell pockets, Rebar to be made
offset.
G 5. This drawing covers the minimum requirements of the weighbridge G
civil foundation works and the same could be modified to suit the site
conditions considering the following load factors :
All Loadcell Points 30 Tons downwards 5 Tons sideways and
longitudinally
6.Center & diagonal distances between loadcell pocket centers are to
H H
be made with in +/- 3 mm. All levels at loadcells should be + - 5mm
7.( 32mm Dia) PVC Conduit pipes to be provided for loadcell cabling
from weighbridge to weigh house
8. If in doubt, please ask.

J J

K
LEGEND. K

L L

M M

N N

P REVISION DETAILS. P

Q Q

R R

S S

D
FOR DG REFERENCE
DRAWING TITLE : STAMP : PROJECT : DRAWN BY 28-04-2021 JP
CIVIL FOUNDATION - 18 X 3.5 M-80T- 100T
SURFACE MOUNT
T IR No: CHKD BY 28-04-2021 DP T
REV. No. DATE :

SR No: 00 28-04-2021 VFD BY 28-04-2021 PD Danlesco Gulf LLC


Tel : 00 971 4 289 5100 Fax : 289 5571 PO Box 50468, Dubai, U.A.E
U THIS DRAWING IS THE COPYRIGHT OF DANLESCO GULF LLC. AND MUST NOT BE
PAPER SIZE : PAGE No. U
JOB No: REPRODUCED OR DISCLOSED TO ANY OTHER PERSON WITHOUT THEIR EXPRESS
PERMISSION
SCALE : NTS Drawing No. DGCF-18x3.5-SM-M
A3 01/01