Professional Documents
Culture Documents
L=913m2
Holil
Hendri L=1854m2
L=1163m2
Jamaludin
L=797m2m2
8
.9
RO
12 43
W
102.5 M2
6
M
8
.2
12 42
8
91.5Asep
M2 Hidayat
L=1176m2
0 .7
Tata
9
Suhaefi 1
L=895m2 L=2958m2 41
6
M
Sel
99 M2 W
3.
RO
2
9.
oka
5
7
6.
n
2.5
4
.5
12 30 GRANADA WATERFALL
3.5
103 M2 CIATER
8
10
4
9.
.4
29
3
107 M2 9.
13 9
H. Sulen 8 .3
L=1241m2 28 CIATER
10
111.5M2 KAB. SUBANG
9.5
19.5
8.
15 14 31
8 .6
84 M2 8 155 M2
10 27
CURAM
5
123.5 M2
8.
13
8
10 8 16Dadang Burhan .3
M
8
17 .2
80 M2 9. n 5 L=1580m2
2.9
18 .6 8 32
-
Dadang Idang 2
ka W
5.
9
10 7. RO 26 102 M2
4
L=270m2 124.5 M2 lo 17
8
6.1 S e 8.
3 .7 135.5 M2 12
8
2.3 3 16 .1
9 2.
8
Tata
8
6. 156 M2
12
80 M2 6 RO 9 7.4 8 33
4 L=126m2
59.5 M2 6. 25
1
10
7.
W 95.5 M2
13
1.
.7
8
5.8 7M 8
14 21 150.5 M2 11
8
17 .9
7.8
8 68.5 M2 PT. GUNA BERKAH
M
6.
2.3
3 6 171 M2
8
7
12
6M
80 M2 .9 .6 PROPERTINDO
W
4 Cahwa 11 9.6 8 34
8
9. 10
RO
W
9.
11
L=987m2
8
96 M2
9
24
RO
9. 20 12
2 4.6 100.5 M2 .1
8
12 102 M2
7
Jainudin 11
9
164.5 M2 .8
Tanah Milik 186 M2 L=1850m2 6.
9 12 8 35
Se
.5
9.5
16
H.Sidiq 109.5 M2
6
16.2
1.3
lo
19
.8
23
ka
Suhaemi 119.5
4
12
16
8. 103 M2
8.
9
11 3 M2 .2
n
L=1028m2
9
12
128.5 M2 12
9.5
.6
.5
8.3
11 36
13 4. 22 112 M2
3 RO
8
9
10 6M
12 Henri
2
9
.7
.
8. .6
14
L=298m2
5
8.9
5
9.
RO 8 14 37
3 W 129Saripudin
M2
Se 115.5 M2
169 M2
6M L=176m2 lok Somang
an 13
9
8 10 L=347m2
7.7
.7
.5
3
12
8.
14 Se 38
. 8 4 lo ka 13
.7
2 8 104 M2
12
102 M2 n Suhaepi
3
123.5 M2
5M
8.
L=998m2
8.2
7, Dadang Idan 1 15 5
W .7 8 7.
RO L=1119m2 114 M2 101 M2 7
8
12 16
.4 .2
2.5
.3
.5
11
12
9.7 8 39
163 M2 93 M2
Tata R RO
2
L=143m2 W
3
9.
9.
6M
.4
5 7.
12
5
Jinudin
.3
L=495m2 Siti Humaesaroh
Tanah Milik 16 40 L=283m2
H.Sidiq 96 M2
Se 05/04/2023 -
M
lok
M
5
4
W
an
.2
W
RO
kan
13
RO
Selo 2.
6 3.5
akam Meli
L=1020m2 MASTER PLAN
Tanah Milik
Holil
1 : 2500
Tanah Milik
Makam
Tanah Milik 01
Ajiji