2. Overview
RAVULIZUMAB 10MG/ML BDS PORRINO is a sterile clear, colourless,
preservative-free solution for intravenous infusion and is supplied in 30m ml glass
vials. The manufacturing process consists of drug substance pooling, bioburden
reduction filtration, transfer, sterile filtration, filling, stoppering, capping and visual
inspection. The bulk Drug substance is supplied, as a low bioburden liquid product in
100L Hyclone Bioprocess Bags, at a concentration of 10mg/ml. It is stored at 2-8°C.
The BDS bags are stored in the 2-8°C coldroom. Each BDS bag is placed in a plastic
drum to protect from light. All BDS batches are accompanied by the supplier’s
relevant documentation, together with CoA and temptale data that are all reviewed as
part of the release process. Tailgates samples are provided with the BDS Bags and
these are used for identification testing that is performed at ADMF.
BDS Batch 1069311 SKU 200384 ALXN1210 10mg Lonza Porrino was
manufactured at Lonza Biologics Porrino (LBP), S.L. C/La relba, s/n. Porrino,
Pontevedra, 36400, Spain. The previous listed are currently in AAMF and are fully
released. All batches are nearing expiry. There is a requirement to convert Clinical
ALXN1210 10mg/ml BDS (Product Number 200384) into commercial BDS batches
(Product Number 200433) to enable the filling of Ultomiris drug product batch
230413 using this BDS batch.
Batch 1069311 bag 5 and 6, total quantity 375.4Kg, are intended to be used in
RAVULIZUMAB DP 10mg SKU 200349 commercial manufacturing at Alexion
Athlone Manufacturing Facility (AAMF).
Change Control PR150667 Use of Clinical BDS Lot 1069311 SKU 200384
ALXN1210 10mg Lonza Porrino in RAVULIZUMAB DP 10mg SKU 200349
commercial manufacturing at Alexion Athlone Manufacturing Facility (AAMF).
4. Procedure
Appendix No: 1
Document Title
Executed Inspection and Release Requirements for
SKU 200433 RAVULIZUMAB 10MG/ML BDS PORRINO batch
1069311
Verified by:
Confirm attachments 01 and 02 are attached Completed: Yes No
Initial/date:
Table 1:
Completed: Yes No
Confirm attachment 04 is attached
Initial/date:
Full Release
List of Attachments: