HAZARD ID
Project: BYTE
Work Title: LV PANEL UNLOADING AND INSTALLATION
Category of Description of Hazard Person Exposed Category of
Activity Hazard
Sr. Activity (Routine/Non - (Normal
No. (In Sequence) Routine) /Abnormal)/
Emergency)
workers. normal
1.unfit worker/-Phy
2.language barrier/psc
3.lack of awarness/psy
1
Mobilization routine
of manpower worker under alcohol
influnce
4.unauthorised
operator:psc
Mobilization of routine slection of workers. normal
crane and defective&damaged
lifting tools&tackles
tools&tackles
Preparation of
scaffold and Fall off personnel and
6 Non routine workmens normal
workig at material
height
4 . Using Scissor
lift for
marking ,Drillin
g, Bracket fixing
, and
installation of
Bus Duct
above 5 mtrs.
Height.
Fall off personnel and
7 Routine material, and bone workmens Normal
fracture
Working at height on
Fixing fo scaffold level,loose
8 Routine worksmen Normal
busduct material, small tools
slipping, falling of bbt
3 poor housekeeping
4 ergonomic
5 inadequate illumination
using winch 6 lack of supervision
machine for 7 Use of inappropriate
9 Routine Winch machine worksmens abnormal
busduct
installation
10 workmens Normal
poor illumination
11 Work at night Routine arrangement and workmens Normal
planning for night work
Hazard should be avoided (or the level of risk reduced significantly and
Minor reliably by additional controls)
Likelihood
Requirement
(Yes / No) damage
Existing Control measure
(F)
consequences
bocw act property dmage, personal physically fit worker to be 2
1969rule 58 damage 2safety induction shall be given to each
installation worker and staff
requirement 3site safety rules and regulation to be
expalained to every person
4 mamdatory ppes must be provided
5 gate pase for every worker and
6 tool box talk should be conducted for
each acrivity
7barricade the work area unknoq worker
not allowed in working area
8 ptw shall be taken to start work activity
and task related training must be given
bocw act property dmage, personal 1.submit valid crane 2
1969rule 83 damage documents(RC,puc,Insurance,third party
use by vehicle certificates.
2 Engage trained and authorised person for
operation of crane.
3.Site supervisor and crane operators to
conduct regular checks to ensure crane in
good condition.
4.safety and site supervisor to ensure that
work personal put on appropriate ppe
5 provide soft barrication during lifting work
– No further control
LOW Possible (3) L(3) M(6)
ResidualRPN
Severity (S)
Severity (S)
RPN (F x S)
Category
(F x S)
Risk
measure (F)
(if required)
2 3 Medium
Full time supervision while 2 2 4
activity is taken place.
installation must be carried out
and proper supervision, and no
2 3 Medium 2 3 5
new person must be used while
fixing busduct
3 9 Medium 2 2 4
3 6 Medium 1 2 3
proper training for night work
2 4 low msut be done 1 2 3
2 proper light must be provided
HOUSEKEEPING MANAGEMENT
2 4 Low
TRAINING TO THE WORKER 2 2 4
SEVERITY
Extreme
Minor (2) Severe(3)
(4)
Remarks
low
Low
Low
Low
Low
Low
Low
medium
medium
Low
Low
Low