Professional Documents
Culture Documents
TP-SVC-005-01
Reviewed
Version Document Name Date Author Change Control
By
V1.0 Service Receipt - 21/04/2012 Mr.Sameer Mr.Manish
UPMPL_BPD_MM3E Vaidya Sawant
Document Approvals
Highbar technologies
25/04/2012
Consultant Mr. Sameer Vaidya
25/04/2012
Project Manager Mr. Manish Sawant
Reviewed By
Core Team
Process Owner
Table of Contents
1. Executive Summary ................................................................................................ 3
1.1. Background ........................................................................................................ 3
1.2. Business Blueprint Overview......................................................................... 3
2. ORGANIZATION STRUCTURE ................................................................................. 6
3. Master Data .............................................................................................................. 6
4. BUSINESS PROCESS.................................................................................................. 7
5. MODULE INTEGRATION........................................................................................... 8
6. STANDARD INFORMATION SYSTEM ...................................................................... 8
7. DESCRIPTION OF FUNCTIONAL DEFICIT ............................................................. 8
8. DEVELOPMENT CONSIDERATIONS ........................................................................ 9
8.1. Data Conversion Considerations ................................................................... 9
8.2. Interface Considerations ................................................................................ 9
8.3. Reporting Considerations ............................................................................... 9
8.4. Form Considerations ....................................................................................... 9
8.5. Enhancement Considerations...................................................................... 10
9. CHANGE MANAGEMENT ........................................................................................ 10
10. ANNEXURE............................................................................................................ 10
11. CHECKS & VALIDATIONS ................................................................................... 10
1. Executive Summary
This document is prepared to give a fair idea to core team members, support team
members and process owners of UPMPL about the TO BE processes mapping with
current AS IS processes based on industry and SAP best practices.
1.1. Background
This blueprint document is concerned with the process of Service Entry Sheet
(Vendor’s Work completed Bills etc.) against Service Order that is performed by
service vendor.
The services actually performed (work actually done) by a service provider are
recorded in a Service Entry Sheet with reference to the Work order.
While preparing service entry sheet user can/shall mention following details:
Period of Service entry sheet: From Date – to Date to which service entry sheet
belongs.
Any extra services received from Vendor can be incorporated by amending the
Service Work Order.
Process steps:
After services that have been performed and recorded in the service entry sheet,
one or more responsible persons (depending on the system settings) must check
that the work is satisfactory and formally accept the services.
For the approval or acceptance of service entry sheet, Release procedure will be
configured as per the UPMPL policy.
Accounting affects:
Cr. Vendor
Once Service entry sheet is released no changes in the service entry sheet
will be possible.
Process Flow
Creation of
Approval of
Service
Work Order
Entry Sheet
Release of
Service Entry
Sheet
Acceptance of Invoice
SES Verification
1. Single point of information shared across all modules so it’s better to maintain
service master centrally at HO.
2. Service master is at client level so reports can be viewed for different plants.
4. Service entry sheet at activity level will give status of completion of activity in
a planned manner and incomplete activities can be measured.
5. Billing and payment can be done based on the completion of activities i.e.
quantities entered in service entry sheet.
2. ORGANIZATION STRUCTURE
Company Code
Purchase Organization
Plant
3. Master Data
4. BUSINESS PROCESS
Start
As per Authorization
Matrix Work Order Approval
No
Approved
Service Order
If Yes
Booking of Service Entry
Billing Department Sheet as per actual work
Done
No Booking of
Service Entry
Sheet
Acceptance of
Service Entry Service entry sheet
Sheet as Per acceptance
Approval matrix
End
5. MODULE INTEGRATION
8. DEVELOPMENT CONSIDERATIONS
Reference Document
Ref Description of Interface
Specification Number
NA
Reference Document
Ref # Description of Report Required
Specification Number
NA
Reference Document
Ref # Description of Form Required
Specification Number
NA
Reference Document
Ref # Description of Enhancement Required
Specification Number
NA
9. CHANGE MANAGEMENT
NA
10. ANNEXURE
AS IS document reference:
NA